Meet TAO Street.
0x081a47f482355cd5e4553a32d34cc1d5a576ee80
A market dashboard for the Bittensor economy: explore subnets, compare alpha prices, track flows, and build your research workspace.
From the market map to the subnet details.
Start with a sector. End with a side-by-side comparison.
Filter compute subnets, select https://t.co/QjDD4s4ExB and Chutes, then compare reserves, emissions and participation.
Which pair should we research next, and which metric matters most?
Build a research basket around the Bittensor subnets you believe in.
Set the allocation, review every constituent and approve each native-alpha purchase separately through your Finney wallet.
https://t.co/fBTXwxkqXX
Different subnets. One shared frame of reference.
Compare moving alpha prices, 24-hour changes, TAO reserves and per-block injection side by side before forming your view.
https://t.co/iGvEpw6BHM
Filter subnets by category, alpha price, TAO reserves, valuation and network activity, then save the screen for later research.
https://t.co/ZEOAnDmNCk
Price is only the starting point.
Search Chutes on TAO Street, open its profile and inspect the seven-day TAO reserve history.
What would you check next: liquidity, emissions or validators? Reply with your pick.
https://t.co/OouigsrEEK
Where is TAO moving?
Switch between indexed subnet inflows and outflows, then search Chutes to inspect its seven-day activity.
Do you start with net flow or gross activity? Tell us why.
https://t.co/GuKSSjBj9S
https://t.co/QjDD4s5cn9, Chutes, Targon. One comparison.
Line up prices, reserves, emissions and network participation on TAO Street.
Which two subnets should we compare next? Drop your pair and the metric you care about most.
https://t.co/iGvEpw6BHM
Look inside the validator set.
Review stake concentration, search an operator and inspect its indexed metrics on TAO Street.
What matters most to you: distribution, trust or commission?
https://t.co/hoKJiPNqSJ
What is happening just outside The 32?
Check the boundary, browse challengers and open a subnet's price chart on TAO Street.
Which challenger should we investigate next? Drop a subnet name below.
https://t.co/anw42SqWKE
From the big picture to one network.
Change heatmap sizing to TAO reserves, switch to 7-day movement, then open Chutes and inspect its pool metrics.
What do you check first: liquidity or price movement?
https://t.co/JLp619HDFW
Follow the economics behind a subnet.
Inspect Chutes' emission allocation, switch the chart to staked alpha and narrow the view to seven days.
Which metric would you explore next, and why?
https://t.co/eKhQ8I7bKB
Ranking Bittensor subnets across mismatched chain snapshots can mislead.
TAO Street groups history by block, rejects conflicting block hashes, and only ranks snapshots containing every subnet in the selected cohort.
Comparable data takes work.
A Bittensor alpha quote can go stale before you sign.
TAO Street rejects expired quotes, re-simulates the Finney transaction, recalculates funding and gas, and checks wallet/input changes before requesting a signature.
The confirm button is the easy part.
Screenshots show real source excerpts, with original line numbers.
Two unit scales. Zero guesswork.
Screenshot: 01-bittensor-price-limits.png
Source: src/lib/providers/bittensor/evm.ts:40
One hard part of building on Bittensor: getting the units right.
TAO Street converts runtime alpha prices from 1e18 to the 1e9 price-limit scale using BigInt, with direction-aware rounding and chain-bound checks.
The trade starts with the math.
Keep up with the Bittensor ecosystem.
Browse observed events, filter network upgrades, and switch between agenda, month and week views on TAO Street.
https://t.co/fjefe6p5Ia
Go deeper than the price.
Explore Chutes' pool reserves, alpha supply, verified emission allocation, registration parameters and staked-alpha history on TAO Street.
https://t.co/eKhQ8I7bKB
Meet the newest networks on the street.
Browse subnets by onchain registration block, inspect reserves and registration costs, then dive into a full profile.
https://t.co/LmpRcHJZBH
See the Bittensor economy from a different angle.
Explore categories, dive into compute networks, and change the heatmap by reserves or price movement.
Look beyond subnet prices.
Explore miners, search participants, and inspect validator stake concentration and operator metrics on TAO Street.
https://t.co/hoKJiPMT3b