We finished the endurance with our RP19c,
but unfortunately we had technical issues with our RP19e and couldnโt finish Endurance with it ๐
#FSS19#lastday
Today at 11.00 oโclock weโll finish statics with the Engineering Design Report C.
Afterwards the dynamics will start with SkidPad at 14.00 oโclock and tonight the legendary night Acceleration will take place ๐
#RP19c#RP19e#awakethebeasts
Furthermore, today is the second Statics day for our team.
In the morning, we started with Cost Report C, at 13.00 oโclock Business Plan Presentation E and finish with Cost Report E at 15.30.
#RP19c#RP19e
Yeah ๐
We completed/finished every single point of our todayโs schedule โ๏ธ
Now, we prepare our cultur dinner for tonight, in german called โApfelstrudelโ.
Come over and take a piece ๐ด
#formulastudentfamily#cultursharingdinner#apfelstrudel
Our schedule for today:
RP19c
9.30h Pre Inspection
10.30h Mech Inspection
13.00h Business Plan Presentation
RP19e
9.50h Engineering Design Report
13.00h Pre Inspection
#FSS#RP19c#RP19e