Secretary of State Marco Rubio says the U.S. is "not attacking" Iran in the Strait of Hormuz, and calls the military's efforts in the strait a "defensive operation."
"What that means is very simple: There's no shooting unless we're shot at first,” Rubio says. "We are only responding if attacked first.”
This is pretty insulting to all US based design/engineering firms and shipyards. Have they become so expensive and inefficient that the Pentagon will outsource this service? Something has to change.
The Pentagon is considering outsourcing warship design and building to Korea and Japan with a proposed $1.85 billion feasibility study into the project within the proposed budget for 2027, with the study to look at the feasibility of adopting or co-producing advanced hulls such as Japan’s Mogami-class and Korea’s Daegu-class frigates to supplement the U.S. Navy, according to USNI News.
@cpgrabow I know that Jones Act vessel prices get you really fired up. If you think the military receives preferential rates for anything, please save yourself and don't look at the cost of their ships! :)
@cpgrabow@FishLikesFlicks@cdrsalamander@johnkonrad Don't forget, it was always estimated to cost that much back in 2018: "The first NSMV has been estimated to cost approximately $350 million, with delivery to the Maritime Administration expected in 2022."
https://t.co/uHCO6kuxQe
It just wasn't funded to that level.
@cpgrabow@bilgerat47 It should also be noted that 4 or 5 of the 8 are exclusively government/navy shipyards that won't be of much help in rebuilding the US commercial fleet without venturing into new types of construction.