📢 $DYDX gave $10K–$100K+ airdrops per user in one of the biggest DeFi rewards ever.
Now here is everything about how to be eligible for the next DYDX = Arcus airdrop 👇
Recently, the dYdX ecosystem is expanding into preps + Robinhood Ethereum L2 chain.
Arcus (@arcus_xyz) is a new DEX built by @dydxfoundation on @RobinhoodApp Chain.
It is separate from the dYdX Chain.
Arcus has no token yet, but since the dYdX team is behind it, Arcus might launch a new token in the future, and may even airdrop early users.
So… join the Arcus preps waitlist first 👇
First, join Arcus preps waitlist 👇
🔗 Go to: https://t.co/GQtMblIyrx
– Connect EVM wallet
– Click accept referral code
– Confirm on MetaMask
– Connect X account
– Connect dYdX account if you have
– Done, you will be in line
Tips: Connect the same wallet if you are farming dYdX, Hyperliquid, Lighter preps.
Arcus currently offers 0% trading fees, so you can generate trading volume without paying fees (network gas still applies).
• Now create account on Arcus DEX and start making volume 👇
🔗 Go to: https://t.co/WgcCva78VW
– Join with referral code
– Connect same EVM wallet
– Confirm wallet & add network
– Again click join referral
– Done
• After creating account
– Bridge some funds using https://t.co/ytIQgMHo4T
(USDG on Robinhood network)
– Then bridge some funds on Robinhood ETH
– You need USDG for using the DEX & Robinhood ETH for gas fees on MetaMask
• After bridging funds:
– Go to Arcus account
– Go to spot option
– Click deposit & select MetaMask
– Click transfer crypto
– Copy address & send USDG from your wallet (no need to send ETH for gas)
• After depositing:
– Go to swap option
– Swap USDG to other stocks (no fees)
– Make volume
• After swapping, you can withdraw your funds:
– Click your profile/address
– Click (spot) arrow button
– Select crypto address
– Withdraw your funds to EVM wallet
– You can withdraw to any chain (like Base or others)
– No withdrawal fees
Early DEX users may receive something like points or rewards.
So if you have funds, trade. Otherwise, just create an account.
Arcus usage means you are using Robinhood L2. When Robinhood launches a token, txns, fees & volume may be counted.
comments your waitlist rank
Like, repost & share ❤️🩹
@grassfdn After almost 2 years of consistently contributing...
I received $15 with 17M uptime Points. 😂
And now you launched Network Points instead of rewarding Uptime Points.
Thanks for playing. 🤝
Grass Stage 2 Allocation Checker is LIVE!
You can now check your $GRASS Allocation 👇
🔗 Check here: https://t.co/cpyMm2OFVr
Here's what you need to know 👇
• This is for Stage 2 rewards.
• Rewards will be paid in USDC, not $GRASS token.
• Your allocation is based on Network Points, not Uptime Points.
• Claim opens on July 22.
I'm eligible for 15 USDC.😂
🤯 Some people received $4K–$7K in rewards.
How did they earn that much?
I'll break it all down in my next post. 👀
Follow me and stay tuned if you want to know exactly how they did it.
How much USDC did you get?
📸 Comment your allocation screenshot below! 👇
🤯 Project with $5.77B Funding : Robinhood
@RobinhoodApp raised $5.77B from a16z,Rabbit capital & more teir 1 ventures
They just hours ago launched its own L2 chain
Now things are getting interesting…
@arcus_xyz (rebranded dYdX) is positioning itself as a major DEX & Preps on the Robinhood Chain.
Arcus is now live with a waitlist for early users, where you may get access before public launch 👇
🔗 Join waitlist: https://t.co/vmRUW6AGhM
Steps:
– Connect EVM wallet
– Accept referral code
– Link X account
– Complete tasks
That’s it.
Tips:
Use your main wallet, since you’ll need funds to use the DEX later.
Also, if you’ve used perp DEXs like Hyperliquid, Lighter, etc. Better to use the same wallet. Early volume users might get more benefits
Now we wait for the next update 🫡
Like, repost & share ❤️🩹
🫣 So @world_xyz is a Solana Prediction Market 😳
Big update on World 👇
https://t.co/UB3BXk6mhh just launched as a fully onchain prediction market on Solana inside Phantom, letting users trade crypto & World Cup outcomes directly from their wallets.
Powered by Chainlink for fast decentralized settlement, no custodial friction, fully self-custodial, instant onchain markets.
Prediction markets just went fully native on @solana
I actually guessed this back on June 24, that World is a prediction market on @solana.
Did you guess it early or just finding out now?
And the real question 👇
Can @world_xyz beat @Polymarket? 🤔
What do you think? 👇
10 Reasons Why $ANSEM Can Hit $100B FDV 🐂
1. Every cycle has one memecoin that becomes the face of the chain. DOGE had its cycle. WIF had Solana's last one. $ANSEM is fighting to own the next chapter.
2. Crypto isn't driven by logic. It's driven by stories. "The Black Bull" is one of those stories people instantly understand.
3. Solana is built for things that move fast. Fast communities, fast memes, fast money. $ANSEM fits that environment perfectly.
4. Memecoins don't need everyone,they just need a cult. $ANSEM is building one faster than most projects build a community.
5. WIF reached billions with a dog wearing a hat. $ANSEM has one of the biggest personalities in crypto attached to its narrative. Attention is the rarest asset on-chain.
6. If major exchanges continue listing it, everything changes. More accessibility means more liquidity, more exposure, and a much larger pool of potential buyers.
7. If WIF proved a Solana memecoin can reach multi-billion-dollar valuations, then the ceiling has already been broken. Every new leader starts where the last one left off.
8. The jump from $100M to $1B always feels impossible... until it happens. Then people say $10B is impossible. Then $50B And then $100B. Markets don't move in straight lines, they reprice narratives.
9. $DOGE reached tens of billions because people believed. $WIF reached billions because people believed. If enough people believe in $ANSEM, the chart follows.
10. People don't remember the analysts who said "it's overvalued." They remember the crazy targets everyone mocked before they became reality.
$10B breaks expectations.
$50B rewrites the narrative.
$100B makes history.
Maybe $ANSEM is that story. 🐂
What do you think?
NFA. DYOR.
🚨 $XEF Airdrop Distribution Update xeffy
$XEF Distribution Delayed Again, Another 48 Hours🙄
@Xeffy said:
"The first Incentive Community Airdrop has been delayed."
According to the team, the staking site renewal and Sybil verification are still in progress to ensure a fair distribution.
Expected timeline: Within the next 48 hours.
I don't even know what to say anymore.
I guess all we can do is wait another 48 hours... with no expectations. 😶
What do you think?
📢 DacChain Tokenomics Revealed
The official @dac_chain Whitepaper is finally live, and we now know the 1B $DACT token allocation. 👇
Token Allocation
• Institutional Investors → 20%
• Reserve → 20%
• Team → 15%
• Enterprise Incentives → 13.5%
• Liquidity → 10%
• Private Investors → 8%
• Marketing → 7.5%
• Grant / Airdrop → 5%
• Public → 1%
For early users, the most interesting part is the 5% Grant / Airdrop allocation.
If you're still farming the DAC Testnet, this confirms the community has a dedicated token allocation.
🆕 New users can join here: https://t.co/PMKwDgFgSr
How many QE Points do you have?
Comment your QE Points and Leaderboard Rank below! 👇
Like & Repost & Share ❤️🩹
🤯 Have WhatsApp = Future Millionaire? 😳
@WhatsApp has launched Usernames, and you can claim your username for free.
We've already seen premium Telegram usernames sell for insane amounts:
• @news → $5.81M
• @auto → $5.27M
• @bank → $4.97M
And @crypto reportedly received a $25M offer. 🤯
Now WhatsApp has finally introduced Usernames.
That means people can contact you without seeing your phone number.
Here's How to claim... 👇
– OpneWhatsApp
– Go to Settings
– Go to Account
– Click Username
– Create username
Don't just claim your own name...
Think bigger.
Reserve premium usernames related to:
• Billionaires
• Major brands
• Government entities
• Crypto projects & founders
• Popular creators/KOLs
Examples:
• Nike
• Pizza
• Bitcoin
• Elon
• BinanceFDN
• Vitalik
• Satoshi
Check how brands, projects, and creators spell their usernames on X, Instagram, or Facebook, then try to secure the same username on WhatsApp.
Nobody knows if WhatsApp will ever launch a username marketplace.
But if they do...
Early premium usernames could become extremely valuable.
So why not claim one while it's still free? 👀
Have you claimed your WhatsApp username yet?
Comment your username screenshot below 👇
Like,repost & share ❤️🩹
@blknoiz06 , can you please turn my $1.69 solana:9cRCn9rGT8V2imeM2BaKs13yhMEais3ruM3rPvTGpump bag into $69B solana:9cRCn9rGT8V2imeM2BaKs13yhMEais3ruM3rPvTGpump? 😭
🤑 Just Got $10 on binance
You can got $2 to $1888 instant
@binance has launched bStock Trading with a $500K Rewards Pool.
Complete the required trading volume and get a chance to spin for $2 to $1,888.
🔗 open link: https://t.co/XRkuRAOr0z
How to get spin 👇
• Open the link in the Binance app
• Complete $200–$1,000 in Buy trading volume
• Only Buy Volume counts
• After completing $1000, you'll receive a Spin
I just completed $1,000 in trading volume, and it only cost me around $1 in trading fees.
Now it's your turn...
Maybe you'll land $2, $10, or even $1,888. 👀
After spinning, comment your reward below! 🎰👇
🚨 $XEF Airdrop Claim Update
The team has delayed the Community Incentive distribution by 12–18 hours.
Here's what you need to know 👇
– No claim is required.
– The team will send $XEF directly to your registered EVM wallet.
– Rewards will be distributed on the Xphere Mainnet, so make sure you've added the Xphere Mainnet RPC to your registered wallet.
🔗 RPC: https://t.co/rWNoy6iqum
– connect & add rpc on your rabby or metamask
So... how many points are you waiting to convert into $XEF? 👀👇
Like, Comment & Share ❤️🩹
📢 Most anticipated early Layer 1 blockchain: Metal Network?
@metalntwx is an institutional-grade Layer 1 built for:
• Stablecoins
• Tokenized RWAs
• Compliant global settlement
• Licensed financial institutions
But what really caught my attention is who's backing it.
Founder: @bzlwang (Loong Wang), co-founder of Ren Protocol.
And on the backing side...
@awxjack (Jack Zhang), CEO of Airwallex.
• Airwallex + Capital49 co-led Metal's seed round.
• Airwallex also joined as a Design Partner, helping shape its payment rails and enterprise infrastructure.
For context...
In 2018, Stripe reportedly offered $1B to acquire Airwallex.
Jack Zhang said no.
Now, @airwallex generates around $1.3B in annualized revenue and recently raised $320M at an $11B valuation
Now, Airwallex is backing and helping build Metal Network.
That alone makes me think @metalntwx could become one of the next major Layer 1 blockchains.
Still very early...
Keep an eye on @metalntwx.
Do you think Metal Network could become the next Aptos or Sui, or will it end up like Monad?
What do you think? 👇
Like, repost & share. ❤️
💎 Grass Diamonds = Season 2 Eligibility Check?
Many people thought @grass Diamonds would be converted directly into $GRASS tokens.
That's not what the moderator said.
According to a Grass moderator:
– Diamonds = a visual representation of your Points
– They're not a separate reward
– Both Uptime Points and Network Points are used to calculate your airdrop allocation
Now here's my theory 👇
I don't think Diamonds are useless.
From what we've seen, Diamonds seem to reflect your real node activity, such as:
– How long your Grass Lite Node has been actively running
– Which device(s) are actively earning
– Your overall legitimate node activity
– The more your node stays active, the more Diamonds you earn.
So to me, Diamonds could act as proof that your activity is genuine.
For example...
If someone is farming with multiple devices, abusing the system, or running suspicious activity, they may not receive Diamonds in the same way.
That makes me think Diamonds could be an anti-sybil signal to identify real contributors.
So while they may not convert directly into $GRASS, they could still play a role in eligibility or even boost your final allocation.
⚠️ This is only my theory based on the current information.
Nothing has been officially confirmed by the Grass team.
What do you think?
Do Diamonds matter more than we think? 🤔
How many Diamonds do you have? 👇
🤑 Claim 800+ ASP Points on AllScale (Complete Video Guide)
AllScale has launched ASP Points. Earn points now, which may convert into a future token airdrop.
Raised $6.5M from Tier-1 investor (YZi Labs & Animoca Brand.)
@allscaleio is a non-custodial stablecoin payment platform for businesses and Web3 teams.
How to join & claim 800+ ASP Points 👇
🔗 Visit: https://t.co/AvrLEYFEQg
– Enter your email
– Click Create with Email
– Verify your email
– Account created
– Go to Settings and set your username
You'll instantly receive 100 ASP Points.
• Earn another 300 Points (Free)
– Log in daily
– Complete a 7-day streak
Total: 400 FREE Points
Even if you don't have funds, you can still earn:
• Claim 400 More Points (Funded Task)
You'll need around $1.32–$1.35.
Don't worry...
About $1 is returned to you.
Only the network fees are spent.
• Step 1: Create a second AllScale account
– Create another account with a different email
– Go to setting & set name
– Deposit $1 USDT (BNB Chain)
– Go to Contacts
– Copy the account name & email
• Step 2: Create an invoice
On your main account:
– Go to Contacts
– Add your 2nd account email & name
– Click name, you added
– Click invoice & scroll down
– Enter $1 & click create
• Step 3: Pay the invoice
On your second account:
– Go to Invoice
– Select the pending invoice
– Click Pay invoice & pay
– select bsc chain & pay now
– Verify OTP from email
– Done
Go back to your main account.
You'll receive:
– Your $1 payment
– 400 ASP Points
Now you have 500+ ASP Points instantly.
You can also withdraw your $1 back to any wallet or exchange on the BNB Network.
You'll only spend around $0.32 in network fees.
Many people will only claim the free points.
Very few will complete the funded task...
That could make a big difference if ASP Points become an airdrop later.
Already joined?
Comment your total ASP Points screenshots
and let me know if you completed the funded task👇
Like, repost & share ❤️🩹
😂 So... DSCVR's $DS total supply is 50B?
@DSCVR1 created $DS tokrn with 50B supply
They reserved 450M $DS tokens for the community airdrop.
At first, when they announced 450M $DS for the airdrop, almost everyone thought the total supply would be around 10B.
That would've meant 4.5% allocated to the community.
But...
The actual total supply is 50B.
Which means the community airdrop is less than 1% of the total supply. 💀
After waiting 2–3 years, this is what the community gets? 😂
At this point, I wouldn't be surprised if Binance Alpha gets 5–7% of the supply. 😭
I genuinely have no words...
CA(ETH)
0xB2ba5712eE5DD33B8B031fC4fF4D44Be0C28F6d3
What's your thoughts on the $DS tokenomics? 👇
🤑 Concrete Season 2 Live ~ Earn BAGS
Season 1 has officially ended and the snapshot has been completed.
@ConcreteXYZ raised $17M in funding.
Now both old and new users can join Season 2 and start earning BAGS points 👇
🔗 Go to: https://t.co/Lb6ZEz7A0V
– Connect the same EVM wallet
– Connect your X & Discord accounts
– Complete all new tasks
– Keep earning as many points as possible
Don't ignore Discord roles.
Try to grab roles like:
– Full Access
– Grindoor
– Lucky 17
– Newbie
– Vault Navigator
If you're only farming social points, that may not be enough for a future airdrop.
Strong Discord roles could significantly improve your chances 👀
• Season 2 Update for Old Users
– Your Phase 1 leaderboard rank has been carried over
– Your BAGS balance has been transferred automatically
– No action needed, just continue using the same wallet connected through Absinthe
⚠️ Referrals are temporarily disabled.
The old referral system has been retired and will be rebuilt using Fuul.
A new referral program is expected in the coming weeks.
that's it
Did you farm Season 1?
How many BAGS have you collected so far? 👇
❤️ Like, Repost & Share