๐๐ข๐ฆ๐๐ฌ ๐๐ซ๐จ๐ฎ๐ฉ ๐๐ซ๐ข๐ฏ๐๐ญ๐ ๐๐ข๐ฆ๐ข๐ญ๐๐ is more than just an engineering and construction firm; we are builders of trust, progress, and legacy.
Warm birthday wishes to Mr. Sajid Ali Abbasi, Founder & Group CEO of Times Group Private Limited.
May Allah bless you with good health, happiness, and barakah in all that you do. Wishing you a fulfilling year ahead, with meaningful achievements and cherished moments.
With warm regards,
The Times Group Family
#SajidAliAbbasi #HappyBirthday #TimesGroupPk #TeamTimes
Foundations laid. Relationships built. A journey shaped together.
Celebrating 13 years of Times Group, with gratitude for the people behind every milestone.
13 Years of Building with Purpose.
2013โ2026
#TimesGroupPk#TeamTimes#13thAnniversary#BuildingWithPurpose#Construction #ConstructionIndustry #QualityAssurance
The result gets noticed. The process makes it possible. ๐๏ธ
Behind every finished space are countless details, careful planning, skilled workmanship, and consistent attention to quality.
From construction to architectural finishes, every stage plays a key role in shaping the final outcome.
Watch the process. Appreciate the details. See the results.
Follow Times Group for more construction insights, project progress, and architectural transformations.
#TeamTimes #TimesGroupPk #ProcessAndResult #Construction #ConstructionIndustry #ArchitecturalFinishes #ConstructionProgress #InteriorFinishes #Engineering #QualityConstruction #BuildingTransformation
From 1% to 100%, every detail tells a story. ๐๏ธ
Every finished space begins with a foundation of planning, precision, and skilled craftsmanship.
From exposed concrete to refined interiors, each stage brings the project closer to its final form.
Behind every transformation are countless details, careful coordination, and the dedication of people who bring it all together. The real difference is in the details.
Watch till the end to see how an unfinished space transforms into the final result.
Which part of the transformation impressed you the most?
Share your thoughts below!
Follow Times Group for more construction journeys, real project progress, and finishing insights.
#TimesGroupPk #TeamTimes #Construction #ConstructionIndustry #ProjectTransformation #BeforeAndAfter #InteriorFinishes #FitOutWorks #ConstructionProgress #QualityConstruction #Engineering
An office is more than a space; itโs the people who bring it to life.
Behind every plan, every decision, and every achievement is a team working together with commitment, creativity, and purpose.
Because great work begins with great people.
#TimesGroup#teamtimesgroup #peoplebehindthework #workculture
๐๐๐๐จ๐ซ๐ ๐ญ๐ก๐ ๐๐จ๐ง๐๐ซ๐๐ญ๐ ๐ฉ๐จ๐ฎ๐ซ, ๐ญ๐ก๐ ๐ฆ๐จ๐ฌ๐ญ ๐ข๐ฆ๐ฉ๐จ๐ซ๐ญ๐๐ง๐ญ ๐ฐ๐จ๐ซ๐ค ๐ข๐ฌ ๐ญ๐ก๐ ๐ฐ๐จ๐ซ๐ค ๐ญ๐ก๐๐ญ ๐ ๐๐ญ๐ฌ ๐๐ก๐๐๐ค๐๐ ๐๐ข๐ซ๐ฌ๐ญ.
A proper pre-pour inspection helps verify that ๐ซ๐๐ข๐ง๐๐จ๐ซ๐๐๐ฆ๐๐ง๐ญ, ๐๐จ๐ซ๐ฆ๐ฐ๐จ๐ซ๐ค, ๐๐ฆ๐๐๐๐ฌ, ๐ฌ๐ฅ๐๐๐ฏ๐๐ฌ, ๐จ๐ฉ๐๐ง๐ข๐ง๐ ๐ฌ, ๐๐จ๐ฏ๐๐ซ, ๐๐ข๐ฆ๐๐ง๐ฌ๐ข๐จ๐ง๐ฌ ๐๐ง๐ ๐ซ๐๐ช๐ฎ๐ข๐ซ๐๐ ๐๐ฉ๐ฉ๐ซ๐จ๐ฏ๐๐ฅ๐ฌ are all in place before concrete placement begins.
Catching an issue before the pour is usually faster, safer and more cost-effective than correcting it afterward.
That is why disciplined site execution depends on one simple principle:
๐๐๐ซ๐ข๐๐ฒ ๐๐๐๐จ๐ซ๐ ๐ฉ๐จ๐ฎ๐ซ๐ข๐ง๐ .
๐๐จ๐ซ๐ซ๐๐๐ญ ๐ง๐จ๐ฐ. ๐๐ฏ๐จ๐ข๐ ๐ซ๐๐ฐ๐จ๐ซ๐ค ๐ฅ๐๐ญ๐๐ซ
At TIMES GROUP | CONSTRUCTION & DEVELOPMENT, we believe quality is built through preparation, coordination and timely inspection at every stage of construction.
๐๐ข๐ญ๐ ๐ฉ๐ซ๐จ๐๐๐ฌ๐ฌ๐ข๐จ๐ง๐๐ฅ๐ฌ: ๐ฐ๐ก๐๐ญ ๐ข๐ฌ ๐ญ๐ก๐ ๐จ๐ง๐ ๐ฉ๐ซ๐-๐ฉ๐จ๐ฎ๐ซ ๐๐ก๐๐๐ค ๐ฒ๐จ๐ฎ ๐ง๐๐ฏ๐๐ซ ๐ฌ๐ค๐ข๐ฉ?
๐ https://t.co/UHLEl2WGZE
๐ LinkedIn: https://t.co/wZs6Zxwu3Z
๐ฑ @timesgroup_emcs
#TimesGroupPk #ConcreteConstruction #SiteEngineering #QAQC #CivilEngineering #ConstructionManagement #ConstructionQuality #ProjectDelivery
๐๐๐๐๐ญ๐ฒ ๐๐จ๐๐ฌ๐งโ๐ญ ๐๐ง๐ ๐๐ญ ๐ก๐๐ง๐๐จ๐ฏ๐๐ซ.
A building may be designed, constructed and completed โ but real safety depends on what happens after that.
From design and execution to maintenance, operations, training and regular fire drills, every stage matters.
Because when an emergency happens, having a system is not enough. People need to know how to respond.
As Sajid Ali Abbasi highlights, safety must become a built-in responsibility, not just a requirement on paper.
A safer building is built through preparation, coordination and continuous practice.
Follow Times Group for more insights on construction, safety and better project execution.
#SajidAliAbbasi #TimesGroup #ConstructionSafety #FireSafety #BuildingSafety #ConstructionIndustry #HSE #ProjectManagement #Engineering #SafetyFirst #FireDrill #ConstructionManagement
๐ ๐ฉ๐ซ๐จ๐ฃ๐๐๐ญ ๐ข๐ฌ ๐ง๐๐ฏ๐๐ซ ๐๐ฎ๐ข๐ฅ๐ญ ๐๐ฒ ๐จ๐ง๐ ๐ซ๐จ๐ฅ๐.
Successful construction depends on people who understand their responsibilities, coordinate with others, and take ownership of the work that follows.
From **Site Engineering and QA/QC to HSE and Planning & Controls**, every function plays a different role โ but all of them contribute to one delivery objective.
When roles are clear, coordination improves.
When accountability is strong, issues are identified earlier.
When teams work as one system, projects move forward with greater control.
At **Times Group | Construction & Development**, we believe strong project delivery is built on **people, process, coordination and accountability**.
**The project moves forward when every role owns its part.**
What is one responsibility in your role that other teams depend on most?
๐ https://t.co/UHLEl2W9a6
๐ LinkedIn: https://t.co/wZs6ZxvWer
๐ฑ @timesgroup_emcs
#TimesGroupPk #ConstructionCareers #SiteEngineering #QAQC #ConstructionSafety #ProjectManagement #ConstructionManagement #CivilEngineering #Engineering
A drawing shows the intent. The site shows how well the team understood and executed that intent.
Between the two comes a process of technical interpretation, coordination, verification and disciplined execution.
Every line on a drawing can affect what happens on site โ from dimensions and levels to materials, services, junctions and final finishes.
That is why successful project delivery depends on more than having the right drawings.
It depends on turning them into the right result.
The drawing shows the plan.
The site shows the delivery.
Times Group | Construction & Development
๐ https://t.co/UHLEl2W9a6
๐ LinkedIn: https://t.co/wZs6ZxvWer
๐ฑ @timesgroup_emcs
#TimesGroupPk #Construction #ProjectDelivery #Engineering #ConstructionManagement #Architecture #BuiltEnvironment
A concrete strength test passes โ but visible honeycombing is found on a structural element. What should the site team do first?
A โ Patch it immediately
B โ Hide it during finishing
C โ Assess the extent and obtain an approved repair method
D โ Ignore it because the strength test passed
A passing test result does not automatically determine the condition or severity of a localized concrete defect.
The correct response should consider the extent, depth, soundness of concrete, reinforcement exposure and approved project requirements before any repair is carried out.
What would you choose โ A, B, C or D?
Times Group | Construction & Development
๐ https://t.co/UHLEl2WGZE
๐ LinkedIn: https://t.co/wZs6Zxwu3Z
โถ๏ธ YouTube: https://t.co/FsTQbKa5vV
๐ฑ @timesgroup_emcs
#TimesGroupPk #SiteIQ #ConcreteQuality #QAQC #CivilEngineering #ConstructionQuality #SiteEngineering
Never close a ceiling before properly checking the services above it.
Before closure, the team should confirm coordination, complete the required concealed-service tests, verify maintenance access, and check service clearances against the approved drawings and ceiling levels.
These checks may take only a little extra time during execution, but they can help prevent rework, damaged finishes, delayed inspections, and future maintenance-access problems.
Coordinate. Test. Verify. Then close.
Good construction isn't just about completing the workโit is about making sure it doesn't have to be opened again.
Site professionals: what is the one check you never skip before ceiling closure?
Times Group | Construction & Development
๐ Website: https://t.co/UHLEl2WGZE
๐ LinkedIn: https://t.co/wZs6Zxwu3Z
โถ๏ธ YouTube: https://t.co/FsTQbKa5vV
๐ฑ Social: @timesgroup_emcs
#TimesGroupPk #MEPCoordination #ConstructionTips #QAQC #SiteEngineering #ConstructionQuality #ProjectDelivery
๐๐ฏ๐๐ซ๐ฒ ๐๐จ๐ฆ๐ฆ๐ข๐ญ๐ฆ๐๐ง๐ญ ๐ข๐ฌ ๐๐ง ๐๐ฆ๐๐ง๐๐ก.
๐๐ก๐ ๐๐ฎ๐ซโ๐๐ง ๐ซ๐๐ฆ๐ข๐ง๐๐ฌ ๐ฎ๐ฌ:
โIndeed, Allah commands you to return trusts to their rightful owners.โ
๐ฒ๐๐๐บ๐ ๐ ๐-๐ญ๐๐๐บ | ๐ฆ:๐ง๐ช
In construction, trust is reflected in the way we handle specifications, quality, records, responsibilities, and commitments made to clients and stakeholders.
A project is not only about completing the visible work. It is also about doing what was approved, verifying what was delivered, keeping records accurate, and closing responsibilities properly.
BUILD WITH RESPONSIBILITY. DELIVER WITH INTEGRITY.
๐๐ฎ๐ฆ๐ฆ๐๐ก ๐๐ฎ๐๐๐ซ๐๐ค.
May our work always reflect honesty, accountability, and Amanah.
TIMES GROUP | CONSTRUCTION & DEVELOPMENT
#JummahMubarak #Amanah #Integrity #Construction #Engineering #ProjectDelivery #TimesGroupPk
Every strong structure begins below the surface.
From precision drilling and reinforcement cage installation to concrete placement and final pile preparation, every stage of deep foundation work is executed to carry the loads of what comes next.
The Machines Behind the Work โ Chapter 05
Forming the Foundations. Building Strength from Below.
#TimesGroup #MachinesBehindTheWork #DeepFoundations #Construction
๐ต๐ฐ What does a developed Pakistan truly look like?
Real progress isn't just about what we build, but how we improve lives, create opportunities, and secure a better future.
My first article in the โPakistan: Building a Better Futureโ series. https://t.co/1MjBqTS7Ey
Great places are built in the details.
At Emaar, Times Group is contributing to external infrastructure, finishing, and landscaping worksโwhere accurate levels, clean edges, carefully aligned paving, and coordinated execution come together to shape functional, high-quality spaces.
Every interface matters.
Every detail counts.
Building with purpose.
Delivering with integrity.
#TimesGroup #emaar #construction #engineering