We have started deploying power for the remaining two cabinet rows in Room A, with a new dedicated UPS battery room and modular Vertiv UPS, we're offering power of up to 20kW per cabinet (2x 32A 3-Phase) - or upgrades of up to 20kW for existing cabinets.
Today we got another 180kW cooling upgrade for Rack Room A delivered, which will run in conjunction with direct Freecooling - available capacity is afterwards over 300kW, another 500kW are planned for 2026 ๐
Yesterday we got a new MTA refrigeration machine and three inside units delivered, effectively increasing cooling capacity with cold water generation together with existing direct evaporator units.
We're finishing up our cold-/warm aisle dual concept - improving thermal load to our aircon units as well as cold air to customers, can you tell whats yet missing? ;-)
Rows R05+R06 with the next 20 cabinets just landed, our team still works on warm aisle containment and power ๐ - Need colocation? Hit us a email - [email protected].
To sustain further growth, two new cabinet rows, additional air conditioning and 250kW power capacity is currently being prepared. Beside of that, we're currently planning our own 3200kVA transformer substation with direct connection onto the local 20kV ring grid.
Just received the new filters for the expansion of our direct freecooling at FRA1 - once it's done, we'll have about 6.5qmยฒ air inlets for 250kW electrical in the said datahall, further pushing efficiency ๐
Three cabinets left at our FRA1 datacenter, next expansion / row and doubling of power capacity planned in Q1/2025, thanks for your trust! - 33% capacity left until we start Room B for another 60 cabinets ๐
We are continuing our ๐จ๐ปโ๐ expansion-spree, this time love for Frankfurt ๐ฉ๐ช with a new core PoP in Tornado Datacenter FRA01, offering 10G and 100G ports. #eraix#ixp#frankfurt#peering
Yesterday we received another row of cabinets from German supplier Schaefer IT-Systems, capacity for another 1066 servers.
Need a colocation rack? Find out more on https://t.co/qLoWUqzlCV
Glad to be part of ERA-IX in Frankfurt, see https://t.co/v0DKVB7RP1 - soon Tornado Datacenter FRA01 will be a connected site, allowing direct 10G/100G connectivity๐