Wait, do you see how the story changed? Price made a HH then LHs under that down trendline and broke the HL, but then refused to go lower and printed a double bottom. That was the clue. Break and close above the trendline flipped momentum, entry after retest, stop below
So you remember how we broke structure to the upside? That was the BOS, but then price failed at the mini ChoCh and collapsed through the major ChoCh. That's your full trend flip. Now every pullback into that grey Fib 0.5-0.6 zone plus the descending trendline is a sell.
Look, can you spot the shift here? Left shoulder, deeper head, right shoulder tapping the same low. That inverse head and shoulders is sellers giving up. Once price broke the bullish ChoCh and made a new high, trend flipped. Entry on retest of that shoulder zone, stop below
So you caught that shift right? Price was in a clean uptrend, broke down, made a double bottom then started coiling under that descending trendline. First tap was a perfect 1:2 long, second break was the real move. Simple structure, entry at break, stop below, target double.
You see this trap? Market faked a breakdown below support, swept all the sell stops where it says SL hunting, then snapped back inside. That's the real signal. Buyers stepped in from support, broke resistance and ran. Patience for the fakeout is what separates traders.
Alright let's walk through this together, price pushed a HH then pulled back making a HL and breaking BOS with momentum from that order block. It rallied into a double top and rejected hard. That failure confirmed sellers, so the short played straight back down to retest the OB
You see how price played this? It sold off hard then tapped that order block and gave a ChoCh to flip bullish. It swept liquidity on the way up, retested it and then pushed into a double top. That double top failed, sellers stepped back in and price dropped
So tell me you see it too? Price pushed up to fill that FVG and got heavily rejected right at that dashed high. It chopped back down to the trendline, tried to bounce but broke the trendline instead. That's your short trigger, and sellers dominated after that.
Hey, do you see the trap here? Price dumped into that OB, tested it three times and swept liquidity. Then it gave a clean ChoCh, that's your shift. After the retest it showed strong buying with that powerful entry candle closing firm. Retest held and price just ran.
You notice how patient this move was? Price tapped that double bottom twice sweeping liquidity, then ripped and closed above that line for a clear market structure shift. It pulled back to fill the FVG, tapped your stop area and that's the entry.
https://t.co/RqAHFbGYSL