Another great job by our temporary works propping team on this barn in Ambleside. ๐ท๐ฝAll equipment installed as per the structural engineers design. Now ready for deconstruction of the walls and padstone / steel insertion
#trancoltd#temporaryworks#construction#LakeDistrict
Fantastic job๐ by our Structural alterations team forming these new window openings through a 425mm depth cavity wall, plus demo works too.๐ท๐ฝ #construction#SME
Tranco lift & Shift๐ช
Moving a 8.5m steel beam into position today in with our tracked carrier and dolly trolley. No manual handling required !
Tranco LTD, saving backs!!!!! #healthandsafety#construction#Lancashire#sme#lifting
Supply & install PFC beams to strengthen an existing timber truss.๐ท๐ฝ
Bit of a challenge kenetically lifting these beams & posts up the external scaffold into the 2nd floor attic room but we managed it.๐ช
Great job by our Structaural Specialists team.
#Construction#temporaryworks
Another great job by our Specialist Team๐๐ผ
Supply & install Temporary propping to support an unstable concrete floor in the centre of Machester. ๐ท๐ฝ
Fantastic job by our temporary works installation team inserting this reverse needling system to support a very unstable & poor condition chimney stack whilst the permanent steel beams and posts are instered.โญ๏ธโญ๏ธโญ๏ธโญ๏ธโญ๏ธ
Hereโs a great job our Specialist Structural Alterations team did last week ๐ท๐พโโ๏ธ
Diamond saw cut & break out through 225mm solid brickwork and 100mm solid stonework to form new window openings on one of our projects in #Lancaster.
#specialists#construction#diamond#sawing