#BTC
Since Dec 2022, I've posted at least 20 times that there was a 0.0% chance that THE TOP was in, which was all TA-based, and I currently feel the same way
However, forgetting TA for a minute, let's talk narrative. We would typically see, "Buy the rumor, Sell the news" &
The NEWS doesn't officially come until Jan 20th (inauguration day)
Therefore, seeing THE TOP before Jan 20th would be quite odd. Moreover, THE NEWS might be so bullish that it only creates a 2-4 week sharp pullback that doubles as a reaccumulation to shake out the overleveraged degens & trap overzealous top callers in their Shorts.
Regardless, enjoy the pullbacks, welcome lower prices, and the opportunity to reassess each asset's desire to respect Support.
In an act of extraordinary courage, Iranian female singer Parastoo Ahmadi live-streamed herself singing without the mandatory hejab in a Tehran caravanserai, risking years of imprisonment. Another crack in the foundations of Iran’s rotting theocracy.
Celebrate Christmas with dYdX to win a share of $2,000 $USDC and an exclusive #dYdXUnlimited merch box!
To enter:
🔹 Retweet & follow @dYdX
🔹 Design your best dYdX Christmas Hat and share it using #dYdXmas
🔹 Fill in the form
T&Cs apply ➡️ https://t.co/cwKof4zhBD
📊 Bitcoin's new all-time high of ~$103,656 on @coinbase was a six-figure milestone many were anticipating following the massive crypto-wide price surges that began on US election night exactly a month ago. How did we get here?
No matter what cryptocurrency asset you may have been watching, they have benefited from the large rise in holdings from whales & sharks (approximately defined as 10+ BTC wallets). In the past 7 weeks, 103,960 more coins have been accumulated by this group, equaling the fastest rate of accumulation since March, 2021 - June, 2021.
Over the long-term, this group is largely responsible for the direction of future price movements. Check out our simplified summary (in this graphic) of the 5 most notable long-term whale behavioral outliers of the past 3 years. Cryptocurrency is, and will always be, a whales' playground.
What’s the largest prime number of times that this tweet (post) will be retweeted? (For example, will it ever reach 13 retweets?)
Be bold: What's your guess?
I did both! 🔥
My cancer memoir is on Amazon, and I recorded each chapter for free on YouTube. 📽️
If you are fighting cancer, know someone who is fighting cancer or are dealing with the loss of a loved one I share my story here. 📖
https://t.co/CRYJuv3LvP
Please share 👊 💕
backtesting results for $ZRX if you had traded solely(!) according to the chartmeleon tail strategy.
buy & hold: +162%
chartmeleon tail strategy : +1003%
only spot long trades
🛸Big news for all fam!
🤩Orbiter Finance is now supporting $USDC transaction with Loopring: https://t.co/EAxShd6qIi
@loopringorg is a Ethereum (Layer 2+3) ZK-Rollup Protocol. Stay tuned💙
We've been working hard for years to create the best wallet experience in crypto - we think we're close with a near 5⭐️ rating
Next step, bringing this experience to every user, no matter where they are with the new Multi-Network Loopring Smart Wallet
Stay tuned💙
#BTC Ive thrown a fib Spiral on each wave top of last cycle & Intersected Them Bang on the FTX crash.
The 1st one acted as resistance from Bottom break the 2nd one acted as support through the bear the 3rd is driving the BULL & mean Macro resistance is $66666
👀#PsychoAnalysis
Join us tomorrow for a chat with the folks from @ProtocolGuild!
Guests: @cheekygorilla0x, @TimBeiko, and @mirzdame.
We'll discuss Protocol Guild and why Taiko decided to take the PGP and donate 1% of the token supply.
We'll also have time for your questions, so get them ready!