JUST IN: 🔥
Peter Obi “details” Power!
Obi took out a day in 2024 to “detail” ALL the “HOWs” showing a clear understanding of the legacy issues there.
My Challenge;
I challenge any APC supporter to produce such “HOW” by BAT, either via interview or tweet, I will offer 500k.📌
@_LiveAndHope@gentlemanway007 He definitely has a surface level understanding. But what matters more is that he has the political will to tackle the problem.
He knew the potential of Geometric Power long before it was launched. Meanwhile, there are 'intellectuals' here hyping up the guy who appointed "Adelabu" as minister of power.
A few days back, I visited the Geometric Electricity facilities in Abia State. I'm still astounded that this facility, which can help ameliorate Nigeria's electricity needs is yet to come on stream. Domestic investors like Prof. Bart Nnaji,
@Sir_Vulcan01@nigeriasbest I was actually surprised Rufai was hammering for details like it was a test.
This was Obi at Geometric Power a year before they launched. Otti did not need to be an expert to improve the power sector in Abia. POLITICAL WILL supercedes everything else.
https://t.co/ocv0UoRTw4
A few days back, I visited the Geometric Electricity facilities in Abia State. I'm still astounded that this facility, which can help ameliorate Nigeria's electricity needs is yet to come on stream. Domestic investors like Prof. Bart Nnaji,
@_LiveAndHope@gentlemanway007 He mentioned a holistic approach. He was talking about improving all the aspects of the power sector from generation to transmission at the same time, religiously.
He is as clear as he can be here.
@AAProm042@ChuksEricE There was a partial subsidy removal in 2016. Buhari reintroduced full subsidy after 2 years because of an increase in global oil prices.
But your question is valid. The steep increase in subsidy payments under the APC was questionable and needed to be audited.
@DiKachii@Pharez_Sammy You know the answer already.
He will do what needs to be done but more time is required than he stated to achieve 10000MW transmission, in my humble opinion.
@DiKachii@Pharez_Sammy Experts say a lot of the infrastructure for transmission are damaged and it will take several years to rebuild them. And that is only a fraction of the problems with the power sector. Obi, for all his good intentions, underestimates the problem. 4 years is not enough.