If $BTC holds 63.9K, we could see a retest of 65.2K, potentially followed by a bearish reaction.
But this setup is a risky play.
#Bitcoin#cryptocurrency#BTC
#ALTCOIN market is still mostly flat and boring.
But we're overall bottoming nicely (as planned).
...It's time for trading these oversold bounces and stacking generational bags before the liftoff! 💪
The Power of Having a Core Wallet with Your Blockchain #DGB
A core wallet isn’t just a place to hold your coins — it’s the foundation of true control. With #DGB, running a core wallet means you’re connected directly to the blockchain, verifying transactions yourself.
A breakdown below $0.325–$0.320 could strengthen bearish momentum, with the chart pointing toward the $0.305 target zone 📉🔥.
Bulls need a clean breakout above $0.334 to invalidate the bearish scenario.
$TRX #TRX#TRON#Crypto#CryptoTrading
After reaching a historical high of $0.45, Tron, which rose to the $0.38 level, is stabilizing around $0.33 on the weekly chart. As long as the weekly EMA 50 ($0.31) support holds, we could see a new push toward the $0.38 resistance. 📈
#Tron#TRX
Don’t underestimate community-driven projects. 🐱
$PUSS is proving that consistency, innovation, and a loyal community can create serious momentum.
Keep building. Keep believing. 🐾
#PUSS#TRX#Web3
$TRX is getting interesting here. 👀
Price is consolidating just above the 0.3280 support after weeks of sideways action.
A clean break above 0.3360 could open the door toward 0.3444 and 0.3519.
For now, patience. 🎯
#TRX#Crypto