@DRM_BVP hello sir, nm
yesterday i faced very very bad experience at railway crossing, location
https://t.co/cvAwuhhwiB
as shown in above link.
i waited for 15min to pass that crossing with no traffic.
train was crossed after 15min of closing railway. https://t.co/6TWed1wnm9
@DRM_BVP https://t.co/JFaQmixqo5
same issue faced today at 5:15pm
time taken was 10+ minutes
video attached in link
if I'm wron than
provide SOP which have to followed by operator.
@DRM_BVP https://t.co/JFaQmixqo5
same issue faced today at 5:15pm
time taken was 10+ minutes
video attached in link
if I'm wron than
provide SOP which have to followed by operator.
@DRM_BVP https://t.co/wZpU3iYWnj
same issue faced today at 5:15pm
time taken was 10+ minutes
video attached in link
if I'm wron than
provide SOP which have to followed by operator.
@DRM_BVP https://t.co/zVRKcHZa2O
yesterday i faced same issue around 5:15pm.
after reaching i waited for 5 minutes and after i started to make video. so, video is of 7 minutes.
kindly provide sop which has to followed by railway crossing operator
this is really really unfare
@DRM_BVP hello sir, nm
yesterday i faced very very bad experience at railway crossing, location
https://t.co/cvAwuhhwiB
as shown in above link.
i waited for 15min to pass that crossing with no traffic.
train was crossed after 15min of closing railway. https://t.co/6TWed1wnm9
@wrdrmrjt hello sir, nm
today i faced very very bad experience at railway crossing, location
https://t.co/4NoZmMEi8s
as shown in above link.
i waited for 15min to pass that crossing with no traffic.
train was crossed after 15min of closing railway. https://t.co/gH3xLKmj1K
@DRM_BVP@wrdrmrjt RANPUR RAILWAY STATION
railway crossing located between ranpur to kundali railway line as mentioned in photo. https://t.co/NiR30LNCNR
@DRM_BVP hello sir, nm
today i faced very very bad experience at railway crossing, location
https://t.co/cvAwuhhwiB
as shown in above link.
i waited for 15min to pass that crossing with no traffic.
train was crossed after 15min of closing railway. https://t.co/6TWed1wnm9
@WesternRly hello sir, nm
today i faced very very bad experience at railway crossing, location
https://t.co/4NoZmMEi8s
as shown in above link.
i waited for 15min to pass that crossing with no traffic.
train was crossed after 15min of closing railway. https://t.co/gH3xLKmj1K
@BlueStarLtd i purchased SPLIT AC. AFTR INSTALLATION IT'S NOT WORKED FOR 15 MINUTES. I RAISED TOO MANY COMPLAINTS BUT STILL I DIDN'T GET SOLUTION. COMPLAINTS CLOSED WITHOUT SOLUTION. IF IT'S NOT SOLVED TODAY THAN I WILL GO FOR CONSUMER COMPLAINT. REG. MO. NU.9924171067