@HanyIbrahim17@RenaissanceDam The dam is mainly for hydropower generation, but Blue Nile / Abay River flow is used for all purposes in both Ethiopia, Sudan, and Egypt.
@TirusewAsefa@TheNationalNews@addisstandard Jointly managing river basin infrastructures in the Nile basin, where water quantity is limited to supply current and future demand, comes after the Nile basin countries agreed on their equitable and reasonable water share through the NRBC.
In the DoP, Ethiopia's right to adjust the GERD annual operations (AO) from time to time is established.
The AO discussion will lead to annual water releases from GERD & shall account for the current and future water projects (drinking, irrigation, HP, env) in the Abay Basin.
@RenaissanceDam In a very wet year, GERD can generate up to 26,000 GWhr/year, in drought year it reduce to 9000 GWhr/year, what you find in literature 15700 GWhr/year is average energy generation over many years based on historical Abay / Blue Niie flow data.
@RenaissanceDam Agreed Asrat, this paper below support your assessment. We may trade HP in binding way, up to the downstream release water share limit (when agreed). In the future limiting factor is Food not Energy. https://t.co/IK7JViJHWY
#GERD has created a spirit of accomplishment in people's minds as many people shout the slogan "Yes, we can." This theme is now working in many other sectors that are not yet exploited but have the potential to reshape #Ethiopia's development.
@mike_foshoe@yilmash@TayeAtske
@HanyIbrahim17 GERD main purpose is hydropower; Blue Nile river is obviously used for domestic & industrial water supply, irrigation, hydro powers, and other uses in the three countries.
@HanyIbrahim17 Annual operation rules are annual releases from GERD - future releases. The future releases from GERD is dependent on inflow to GERD, and mainly dependent on future development upstream of GERD; so how can we fix agreement on annual operation, without water sharing agreement?
@HanyIbrahim17 So deceptive, twisting matter to prove your wish. Ethiopia, any one in the world, is not constructing a dam to fail. This is engineering at best. Please check the safety of your dam (served already for more than 50 years) and storing twice the size of GERD storage.
@galema12@RenaissanceDam The operation rule forced GERD to release near avg Q. GERD WL will not be < 610 masl to protect turbine cavitation. Simulations using various operation rules adapting to flows will produce > 15TW/year by 13 turbines. GERD is mainly for HP, but Abay river Q is for all uses.