z000 Mainnet Is Still on Track for November 30. ๐
According to Zeroโs official roadmap, the initial phase on November 30 will not include the EVM Zone, and permissionless smart contract deployment will not yet be available.
But z000 is ready.
On November 30, we will launch the first launchpad on LayerZero, built directly on ATLAS + System Zone.
No waiting for the EVM Zone. No dependency on future phases of LayerZero.
z000 is going mainnet on November 30, as planned.
This is the beginning of a new ecosystem on LayerZero. Follow @z000fun for more updates!
#LayerZero #Zero #z000 #Launchpad #ATLAS
The Bridge interface is now available to preview, but asset transfers are not yet enabled.
Please wait for the official Zero Chain Mainnet launch on November 30 before attempting to bridge.
Supported networks:
Ethereum, BNB Chain, Arbitrum One, Base, Optimism, Polygon & Avalanche.
๐ Follow @z000fun and turn on notifications to receive the latest Bridge updates and be among the first to know when transfers go live.
Stay tuned. Mainnet is approaching!
A new ecosystem needs more than infrastructure.
It needs applications.
It needs markets.
It needs communities.
And it needs culture.
That's where https://t.co/A2DD5CaYza comes in.
We're building a Meme Launchpad & Trading Terminal for Zero Chain & ATLAS.
One ecosystem. A new home for meme culture.
More coming soon.
Since its adoption of the OFT standard in 2025, USDG has grown to over $3B in market cap and transferred over $3.9B lifetime across LayerZero rails.
In light of last week's selection by @arbitrum of USDG as a core asset on Arbitrum One, read our latest case study on how the OFT standard facilitates USDG's growthโ
Pre-genesis staking for Zero goes live Monday, November 23, ahead of mainnet:
- Stake from any chain where you hold ZRO
- Staked ZRO unlocks on March 31, 2027
- Rewards accrue in proportion to the amount and time staked
Learn more: https://t.co/IjciWW24HH
USDY, the largest tokenized Treasury product in the market, is now connected between Stellar and Ethereum, powered by LayerZero's OFT standard.
The integration enables minting and redemption on Stellar, expanding cross-chain connectivity for USDY, tokenized by @Ondo.
Zero staking is now open. Rewards begin accruing Nov 30. All stake unlocks March 31, 2027.
The LayerZero Foundation will stake 100M ZRO on the same terms as other stakers. Pre-genesis stake will produce Zero's first blocks at mainnet launch, Nov 30.
https://t.co/n1W4lOCYEh
Today, Nov 23, the LayerZero Foundation will stake its 100M ZRO in two transactions of 50M ZRO each.
Links to both transactions will be posted here once complete.
The LayerZero Foundation has completed its 100M ZRO pre-genesis stake, in the two 50M transactions announced earlier today.
Transaction 1: https://t.co/wRt7Jdsp75
Transaction 2: https://t.co/TcG1aUEV3q
.@LiquidEdgeNTWRK is building its own native trading venue, with perps, bots, strategies and market intelligence in one account. Theyโll be live on day 1 of LayerZero ATLAS.
Mainnet launches Nov. 30.
๐ LayerZero Bridge is LIVE โ On-Chain Proof!
ZRO cross-chain transfers to @LayerZero ZeroInterop Mainnet (EID 33002) have been successfully completed!
โ Ethereum โ 10,000 ZRO
โ BNB Chain โ 1 ZRO
โ Arbitrum โ 10 ZRO
โ Base โ 253.397871 ZRO
๐ Verified On-Chain TXIDs:
๐น Ethereum
https://t.co/5aEoE77gyt
๐น BNB Chain
https://t.co/zbxSvO3TKC
๐น Arbitrum
https://t.co/JT3qaROjKa
๐น Base
https://t.co/SrOUMo3Xj8
All 4 cross-chain messages are marked SUCCEEDED on LayerZero Scan.
โ ๏ธ Current Status:
Public RPC access for ZeroInterop Mainnet is not yet available or officially verified, so users cannot interact with the network through a confirmed public RPC endpoint at this time.
We are planning to build and launch a bridge interface soon, once the necessary network infrastructure becomes accessible.
The Zero ecosystem is coming to life.
Real transactions. On-chain proof. More to come. ๐
LayerZero ZeroInterop Mainnet is now listed as ACTIVE in official metadata
Network: ZeroInterop (L1)
ID: 33002
Endpoint: 33002
Native: $ZRO
ACTIVE Official sources:
https://t.co/1pLs1uopm0 https://t.co/lYgi7yVTR4
Note: Public RPC and bridge availability are not yet confirmed