@clipsofcrypto It remains a Draft and has not been adopted. It was discussed for possible inclusion in the Hegota upgrade but was recommended for removal from consideration in the relevant core developer call.
@adam3us Consistent with the zombie fallacy from @evoskuil. node that validates but isn’t used to accept the coin in trade is a “zombie”, it observes the network but exerts zero influence on consensus.
@btcjvs You are cherry picking ranges to make a point. In total Mstr has been by far the net buyer of btc for 2026. Yrs there are buyers but when all ranges are considered MSTR is the biggest
@thedefiedge Preferred -3.5M Series A shares @ $80, ~$273.8M net, 9.50%/yr ($100 stated, paid weekly). Common - $4.5B+ raised via ATM (program capacity expanded to $24.5B). So preferred (~$274M) is a sliver vs. common (billions).