@BrickCenter_ I would say something but with 7 seconds on the shot clock, perhaps her team should have been positioned for the rebound? Or, one of them should have been the pass to the three
https://t.co/ADeRSSxpNA
@Phil_Lewis_ Fear of a few seconds of fluid at honestly scalding temperatures
So many seconds (or only a small fraction of a second)...
https://t.co/z5Yo8yKQxV
@IanCopeland5 If boiling temperature (with continuous flow),...
for at least 1/100th of a second
For Ultra-Pasteurization:
138C (280F) for at least two (2) seconds
According to the temp/time schedule found here [pdf]: https://t.co/HEniCQGqNo
@PeterBrannen1 Might depend on the direction of the relevant currents 77 million years ago?
Current coming south? Or perhaps deep cold water coming into the hurricane forming waters?
Perhaps Pacific hurricanes without the North/South American block come through?
@bigtramcam@Turbinetraveler From report
Captain was pilot flying
Captain: 16,385 hours (5,205.5 as captain & 11,179.5 as first officer
First officer: 1,958 hours
Relief officer: 1,075 hours
This is only their total flight time at United and does not include their flight time before being hired at United
@hashjenni Policy makers might have one or more of the following:
- Enemy of US enemies
- Israeli intel might be useful
[+ might have kompromat on one or more current administration people]
- Financial lobbying
- Anti-Arab/Muslim racism
- End times/Book of Revelations religious nuttery
@EchoesofWarYT Hal Holbrook played Rochefort
He also played "Deep Throat" the source in Watergate movie All the President's Men; in 4th place that week
@EchoesofWarYT Before his death Rochefort was an advisor to the movie "Midway" which was released in 1976 (which depicts the story described in OP)
About a month before he died, he might have heard about this:
From, Variety 1976-06-30: Vol 283 Iss 8: https://t.co/UT5obBwov1
@CharlesRogya@Victoria00025 California has already chosen just by these results it won’t change Election Day. All those blues will move to the Democrat running. Xavier will be the next Governor. And Bass will remain the mayor and serve out her last term. The blues always outnumber red here.
@number_pizza111 It's easier to carry lots of goods for sale over water.
The Asian silk road left lots of valuable goods in the Eastern Med, to get it to Europe, Venice was closest to both source & market, but Genoa was closer to the European market
And Rome and other Roman cities had some pull.
@Combat_learjet Of the suggested so far, I like "Magnet". Some others:
Bullseye
Target (pronounced Tar-zhay)
Egress
PLF
STOL
Too many words:
ACES II
Seat Rocket