🚆 MRTS Services Extended up to St. Thomas Mount from 14th March 2026.
Chennai Division of Southern Railway will extend MRTS services from Velachery to St. Thomas Mount from 14th March 2026.
The 4.5 km MRTS extension includes three stations – Puzhuthivakkam (PZV), Adambakkam (ABKM) and St. Thomas Mount (STM). With the commissioning of this section, St. Thomas Mount will serve as the terminal station for the MRTS services.
Trains will halt at Puzhuthivakkam Railway station as per the timetable. Due to operational reasons, trains will not stop at Adambakkam Railway Station at present. Stoppage at Adambakkam Railway station will be notified later.
Train services from 14th March 2026:
• Chennai Beach – St. Thomas Mount: 43 pairs
• Chennai Beach – Velachery: 2 pairs
• St. Thomas Mount – Velachery: 3 pairs
The revised timetable for MRTS services, applicable on all days, is enclosed.
The extension strengthens suburban rail connectivity and enables seamless interchange with Chennai Metro at St. Thomas Mount, an important multimodal transport hub.
#MRTS #ChennaiSuburban #SouthernRailway