This is why I keep watching junior copper.
1.670% Cu high, 16,078 ha controlled, 3 drill targets.
NovaRed Mining Inc. could turn a strong technical package into a real discovery story.
$OPEN #loveislandusa $AMZN $SPCX
HIDDEN COPPER GIANT?
The latest NovaRed Mining Inc. update reinforces why $NRED continues attracting attention among copper explorers. The company summarized multiple exploration programs and the picture appears to be getting stronger with every dataset added.
Key figures:
• 16,078 hectares controlled at Wilmac
• 10 km from Copper Mountain Mine
• 345 million tonnes at Copper Mountain grading 0.26% Cu and 0.12 g/t Au
• 3 priority drill targets identified
• 1.670% Cu highest reported rock sample
What stands out is that NRED is no longer relying on a single anomaly.
The company is building a district-scale exploration story with multiple targets and increasing geological confidence.
If future drilling confirms the interpreted intrusive system, this release could be remembered as one of the most important milestones in the project's development.
PT: $8-$12.
Be smart - this isn’t advice, just my observations. Always do your own research.
$TEAM $SPY $TSLA
Strategy CEO Phong Le: Strategy will remain the largest Bitcoin buyer and holder worldwide, and it is easier for the company to buy Bitcoin than to sell it
BREAKING: Over $12.95 trillion has been wiped out from gold and silver in just 132 days.
Gold has crashed -26.50% from its January peak, wiping out $9.75 TRILLION in market value.
Silver is down -47.69%, wiping out $3.2 TRILLION.
The craziest part is that this is happening while the Iran war is still active, oil is near $90, and inflation remains elevated, exactly the type of environment where gold and silver are supposed to outperform.
Stop scrolling - NovaRed Mining Inc. just got a serious upgrade!
C$1.50, 39,726 acres, and Colonel Calabrese with 36 years of defense experience. Copper optionality looks real.
$LFS $WCT #questpit#jonita $ONDS
THIS APPOINTMENT MAKES A LOT OF SENSE TO ME
After reviewing the release, I noticed NovaRed Mining Inc. $NRED controls 39,726 acres, expanded through 11,302 acres, secured 5,096 acres at Plume and completed 18.35 miles of exploration work.
What impressed me about Calabrese:
• Bronze Star recipient
• Legion of Merit recipient
• 36 years of military and defense experience
• Extensive international leadership background
Why do I think this matters?
Because copper is becoming increasingly tied to national infrastructure, energy security and AI development. Someone with experience working across government and defense sectors could help elevate NovaRed Mining's profile.
I continue seeing upside toward $9.00.
Bullish and holding.
Not a financial recommendation, just my view.
$AMPG $NOK $MU
Tech bleeds, AI booms, and yet copper keeps the lights on.
NovaRed Mining Inc. at C$1.55 / $NREDF $1.14 is the small-cap story with giant leverage.
$TSLA $NOK #BamaBoxDox#Tommavi
BLOOD ON THE SCREEN. COPPER STILL LOOKS LIKE THE REAL AI TRADE.
When mega-cap tech bleeds and $1.6T gets wiped in 90 minutes, the market starts hunting the next layer of the AI boom.
SpaceX wants $75B at around $1.75T.
AI valuations are massive.
Mega IPOs are coming.
Liquidity is moving.
But the physical buildout stays the same:
AI needs data centers.
Data centers need power.
Power needs grids.
Grids need copper.
$NRED C$1.55 / $NREDF $1.14
Wilmac: 16,078 ha, 39,733 acres, 70% option, BC, near Copper Mountain.
Daily target: $1.25–$1.35
1Y target: $3.00–$4.00
This is for informational purposes only, not trading advice.
$IREN $NVDA $INTC
THIS IS BAD.
The Bank of Japan is expected to hike rates again on June 16th.
And every time the BOJ has hiked in the past, Bitcoin has dumped:
March 2024: $BTC dropped 18%.
July 2024: BTC dropped 30%.
January 2025: BTC dropped 31%.
December 2025: BTC dropped 32%.
Some of those drops hit right away, others took 2-4 weeks to play out.
Will the pattern repeat, or is this time different?
Codelco’s Q1 drop of 8.1% shows new copper is hard to mine.
NovaRed Mining Inc.’s 16,078 ha in BC could be the North American answer traders need.#Copper
$SLS #loveislandusa#vibragame $LFVN
Copper producers are spending billions just to keep supply alive. That is the part traders miss.
Codelco has 56 owned projects in Chile with total investments around US$20.99B. By 2030, forecasts point to 53 projects potentially completed with US$16.51B in investment.
And still Q1 output dropped 8.1%.
That is why the copper bull case is bigger than price. New supply is hard, slow and expensive.
My NovaRed Mining Inc. ( CSE: $NRED / OTC: $NREDF ) setup:
Current: C$1.80
Today: +2.86%
Historic run: C$0.05 - C$2.33
Return: +3,760%
Wilmac: 16,078 ha / 39,733 acres
Option: 70%
Distance to Copper Mountain: about 10 km
Level map:
C$1.80 hold = alive
C$1.95 first wall
C$2.15 momentum trigger
C$2.33 retest
C$3.25 bigger swing
This is still high-risk junior exploration, but the copper supply math keeps getting better for the bull case.
This is for informational purposes only, not trading advice.
$ADT $NEAR $STRC
🩸 WARNING: $BTC JUST BROKE THE MOST IMPORTANT LINE IN ITS HISTORY.
14 years of support. Gone.
That trendline survived Mt. Gox. 2018. COVID. FTX.
It just failed.
I'M SORRY BUT BITCOIN JUST COMPLETED A PATTERN THAT TAKES YEARS TO BUILD.
And almost nobody noticed.
Multi-year Cup and Handle. Complete.
Breakout. DONE.
Perfect retest. DONE.
Structure confirmed. DONE.
Cup and Handle breakouts don't move 20%.
They move hundreds of percent.
The retest just finished.
The launch is next.
$220K is the minimum target.
Most people will only find out after it happens.
🚨 Saylor just bought back $1.5B of Strategy's debt at an 8% discount.
$1.38B in cash used.
Zero Bitcoin sold.
The biggest bear case against $MSTR was forced BTC selling to repay debt.
That risk just got significantly smaller.