@drm_fzr@Ashieshkapoor1@AshwiniVaishnaw@srdeegfzr The station redevelopment work is currently in progress. As part of the redevelopment project, the existing lifts and escalators were removed in 2023. The site remains under construction, and no lifts or escalators are currently available for public use.
@jeetvictory26g1@GM_NRly@RailwayNorthern@RailwaySeva Sir, Ludhiana (LDH) Railway Station is currently undergoing redevelopment under the Amrit Bharat Station Scheme. Due to the ongoing redevelopment work, the installation of certain passenger amenities, including lifts and escalators, is pending. These facilities will be installed.
@Honeyra16385552@RailMinIndia@RailMadad@RailwaySeva@RailOneIndia Sir,
This incident occurred yesterday, dated 06.10.2026, from 19:00 hrs to 20:15 hrs, during which the power supply was interrupted from the PSPCL side.
After the power supply was restored, all lights were checked and found to be working properly.
Regards.
@drm_fzr@pskandhala@RailwayNorthern@indianrail@srdeegfzr Sir as per SSE/P/JUC All lifts and escalators are working properly. Only FOB No. 03, PF No. 02/03 (LDH side) is not operational due to the lift not being tested and the escalator work not yet being completed
@gs43748 @RailwaySeva@RailMinIndia@Central_Railway@WesternRly@NWRailways Sir, these charging points have been temporarily installed by CHI for cleaning machines. They switched off after the cleaning work is done. LDH station is renovationing under the Amrit Bharat Scheme, due to which charging points have not yet been Inconvenience is deeply regreted
@kPreetam05@ECRlyHJP@GM_ECRly@drm_sonpur@RailMinIndia@RailwaySeva@AshwiniVaishnaw Sir, the inconvenience caused is deeply regretted. All fans in this rake have been cleaned, and the same cleaning process will be carried out for all other rakes as well. Thank you for bringing this to our notice. If you require any assist., call us at 8288032131.
@santosh4437@RailwayNorthern@IRCTCofficial Sir, inconvenience caused is deeply regretted, as per SSE/Power/LDh, all ceiling fan are working satisfactory. Ceiling fans are fixed and benches are portable. Under ceiling fan arrangements of sitting bench pertains to SSE/Works/LDH.
@_aamank@RailwaySeva@NWRailways@RailMinIndia Sir as per on board staff fan switch off condition same put on now fan working ok.Information has also been conveyed to you, telephonically. Now, no issue is pending. Thank you for sharing your experience and using railway service.
@aaryn_dhar@RailwaySeva@drm_fzr Sir, due to slow running of the train , both side single compressor was operating. Now both side both compressors put ON
@PramodV38408721@AshwiniVaishnaw@RailMinIndia@RAILSEVA Sir sorry for the inconvenience. As per RDSO , there is no provision of charging socket in side upper berth. However the matter has been escalated to the concern depot incharge to take necessary action. Thank you for sharing your experience and using railway service.
@PramodV38408721@AshwiniVaishnaw@RailMinIndia@RAILSEVA Sir/Madam, your complaint assigned to this office is under process. We'll revert to you after due investigation. Thank you for approaching the Railway administration.
@Rajnikantk98@indianrailway__@RailwaySeva@RailMinIndia Sir, Your grievance has been attended & resolved and action taken is as under: feeling hot, due to supply was Off during LOCO reverse at SHG , same put on after LOCO attached. Now coach Ac working properly and coach temperature is (20.3*C) which is comfort as per passenger