OGAudit NEVER asks you to connect a wallet or sign anything. Not users. Not OGs.
We never ask for your seed phrase.
If an account, a site, asks for this in our name, it's a scam. Do not respond and report it.
Official domain and channels:
https://t.co/WsN9GL6Tmn
🚨 BINANCE: ~$6.3 BILLION HEIST BY THE NUMBERS 🚨
The largest crypto theft on record. On Oct 29, attackers drained Binance hot wallets across ~10 blockchains. Most of it left in about 20 minutes.
💰 What Was Taken
• BTC: 18,270 BTC (~$1.48B)
• Ethereum: ~200K ETH + tokens (~$3.8B total)
• TRON: ~$628M
• Stablecoins: ~2.49B USDT, 823M USDC
• Alts: 233M XRP, ~970K SOL
⏱️ How It Happened (UTC)
• Oct 28–29: Attacker funded gas via Tornado Cash, tested the exploit code on two wallets and rehearsed on a third.
• 20:05: First hit: 233M XRP.
• 20:10: Solana drained, followed by Base and Optimism.
• 20:20: TRON and Bitcoin hit. All 18,270 BTC left in one block, then split into 19 addresses.
• 20:24: The big one. Using EIP-7702, the attacker had Binance's busiest ETH hot wallet run their code. One transaction swept 167K ETH and 1.6B USDT.
• Root cause (per Binance): A compromised DevOps engineer's laptop. Binance says no private keys leaked. Its own systems signed the withdrawals.
❄️ The Aftermath
• Frozen: ~$2.7–3B. Tether locked ~1.76B USDT, Circle 823M USDC. Arbitrum's Security Council secured ~8.4K ETH and ~74.6M ARB.
• Laundering: Over $700M in stablecoins was swapped into ETH/TRX before the freezes. ~60M USDT went into Aave to borrow ~19.7K ETH.
• Attribution: TRM Labs, Chainalysis and Elliptic link it to North Korea's TraderTraitor (Lazarus). Not officially confirmed by any government yet.
• Users: Binance says it will cover all losses from SAFU and company funds.
❓You May Wonder
- Why steal billions in freezable stablecoins?
A: The drain was automated: take everything, sort it out later. The attacker did swap over $700M before freezes landed, at a steep loss to market price. But they were slow. Most USDT sat untouched for ~37 minutes, long enough for Tether to freeze it.
- Why borrow ETH on Aave?
A: Post stolen USDT as collateral, walk away with ETH that no issuer can freeze. Aave has since frozen the affected markets. The position is still over-collateralized, so no bad debt so far.
- Is the rest gone?
A: ~$3.2B in BTC, ETH, XRP, SOL and TRX remains with the attacker, beyond any issuer's freeze. As of Oct 30, none had reached an exchange, mixer or bridge. All addresses are flagged, so it can still be stopped at cash-out. Bybit's laundering took months. We can expect the same here. Hope the hackers get caught 🙏🤲
Sources: Binance, TRM Labs, Chainalysis, Elliptic, Bitquery, CoinDesk.
Spotlighting our Crypto OG reviews on: @monero
Our Crypto OG reviewers note that Monero $XMR remains the leading privacy cryptocurrency with mandatory privacy on every transaction, a decentralized developer community and continued technical improvements like Bulletproofs+ that enhance efficiency. Unlike privacy optional alternatives such as Zcash, Monero’s anonymity is enabled by default making it the benchmark for practical onchain privacy. The network also uses a tail emission model to provide miners with permanent incentives, helping maintain long term security even without a fixed supply cap. However that same commitment to privacy has made Monero a primary target for regulators, resulting in repeated exchange delistings that limit liquidity and mainstream accessibility.
Can Monero’s unmatched privacy and real-world utility continue to outweigh growing regulatory pressure or will exchange restrictions increasingly limit its long term adoption?
More on the OG audit review and the project info here: ogaudit(.)com/crypto/monero-xmr
https://t.co/R038IXs6lM
Spotlighting our Crypto OG reviews on: @sedaprotocol
Our Crypto OG reviewers note that SEDA $SEDA is building a next generation modular data layer that helps blockchain applications access and route data more efficiently than traditional oracle models. Active development, a clear infrastructure use case and token mechanics tied to network usage give the project a solid technical foundation. However the investment case is less straightforward. The token remains well below previous highs, liquidity is relatively thin and a large share of the supply is controlled by the treasury and insider allocations, creating long term concerns about value capture and future market pressure. While the technology is promising, meaningful token performance will ultimately depend on whether network adoption grows fast enough to outweigh these structural headwinds.
Can SEDA’s modular data infrastructure generate enough real world demand to overcome its supply concentration and market challenges or will strong technology continue to outpace token performance?
More on the OG audit review and the project info here: ogaudit(.)com/crypto/seda-seda
https://t.co/3HKRSRbSAQ
OGAudit Web3 Research: @NervosNetwork $CKB - Repositioning as Bitcoin’s Layer 2 While KuCoin Cuts Off Margin Trading
Nervos CKB uses a hybrid state model called the Cell, deliberately built to take the clearest advantages of both Bitcoin’s UTXO model and Ethereum’s Account model rather than being a pure UTXO system, paired with a RISC-V instruction set virtual machine that lets developers write verification logic in ordinary languages like C rather than a custom blockchain specific language:
- CKB’s original design separates state generation (done offchain by users or applications) from state verification (done onchain by the network), the whitepaper argues this split enables genuine transaction parallelism, since nodes can see which cells a transaction depends on before executing it, unlike account based chains where dependencies aren’t always clear in advance.
- The project’s current strategic positioning has shifted meaningfully, Nervos now describes CKB as the first fully Bitcoin isomorphic Layer2 solution, building RGB++ (a protocol for issuing Bitcoin native assets), a UTXO Stack and a Lightning style payment network aiming to bring programmability and DeFi to Bitcoin without relying on cross chain bridges, a notably different pitch than the general purpose smart contract platform described in the original 2018 design documents.
- CKB still runs on Proof-of-Work consensus with a dual issuance model, a base issuance to miners that halves every four years, plus a fixed secondary issuance of 1.344 billion CKB annually specifically earmarked to fund long term state storage costs, a deliberate design choice tying ongoing token creation to the real cost of keeping data available on the network indefinitely.
Is a technically rigorous, PoW secured base layer now pivoting toward becoming Bitcoin’s programmability layer via RGB++ enough to find real demand as Bitcoin DeFi narratives grow or does a KuCoin margin delisting, a token trading roughly 97% below its 2021 high and a market cap that has sat in the $40-70M range for an extended period suggest the market isn’t yet convinced by the repositioning?
Category: Layer 1
Coin Name: $CKB
Market Cap: $43.46M
OG Score: 33
OG Score Rank: #298/954
See the Social Audit with Reviews by crypto OG’s and more on the $CKB Coin page: ogaudit(.)com/crypto/nervos-network-ckb
https://t.co/jEjSaCcp8H
OGAudit Web3 Research: @HyperliquidX $HYPE - Capturing 60-80% of Perp DEX Volume, But Trading at 167x Revenue.
Hyperliquid is a custom Layer 1 blockchain split into two components: HyperCore, a fully onchain perpetuals and spot orderbook processing up to 200,000 orders per second with one block finality, and HyperEVM, a general-purpose smart contract layer built on top so developers can build permissionless applications directly against HyperCore’s liquidity:
- The protocol commands an estimated 60-80% of all decentralized perpetuals trading volume, generating $58-80 million in monthly fees with 97-99% of that revenue automatically flowing into an Assistance Fund that continuously buys back and burns HYPE on the open market, a direct mechanical link between platform usage and token demand that most DeFi tokens don’t have.
- HIP-3 (permissionless markets, requiring builders to stake 500,000 HYPE for quality control) and HIP-4 (prediction markets, rolled out May 2026) have expanded Hyperliquid’s product suite beyond perpetuals into event based derivatives while HyperEVM now hosts 243 protocols with roughly $1.5 billion in TVL, a genuinely broader ecosystem than a single trading venue.
- Only about 220-256 million of HYPE’s 1 billion total supply is currently circulating (roughly 22-27%), leaving a large gap between the circulating market cap ($13-16.8B) and fully diluted valuation ($56-69B). Future unlocks and emissions continue through 2028 and the next scheduled release lands August 6, 2026, going to core contributors.
Is a rare DeFi token with a direct, mechanical revenue to buyback pipeline, category leading market share and genuine ecosystem expansion into tokenized traditional assets enough to justify a valuation some analysts peg at 167x annualized revenue or does a fully diluted valuation nearly 4-5x the current circulating market cap with meaningful unlocks still scheduled through 2028, mean HYPE’s price has run well ahead of what even strong current fundamentals can support?
Category: Decentralized Exchange (DEX)
Coin Name: $HYPE
Market Cap: $14.46B
OG Score: 45
OG Score Rank: #52/954
See the Social Audit with Reviews by crypto OG’s and more on the $HYPE Coin page: ogaudit(.)com/crypto/hyperliquid-hype
https://t.co/GLdgTmqaEb
Choosing a crypto exchange goes beyond comparing fees and trading pairs.
OGAudit’s Exchange Safety Guide gives users a practical checklist for evaluating crypto exchanges before they deposit, helping them look beyond marketing claims and focus on the signals that matter.
Read the full guide here: ogaudit(.)com/og-space/crypto-exchange-safety-guide-checklist
https://t.co/kYnaeUyKEx
Fake X accounts and cloned Telegram groups remain one of crypto’s oldest attack vectors.
OGAudit aggregates official project links in one place, reducing the need to rely on search results or forwarded messages.
Explore these features and more here: ogaudit(.)com/crypto/hyperliquid-hype
https://t.co/GLdgTmqaEb
Everyone says "DYOR."
Very few explain HOW to actually do it.
Here's a practical Crypto DYOR Checklist to help you spot red flags before investing. 🧵⤵️
https://t.co/v1mQwBsreM
Want the full checklist?
Read my latest work published on the OG Space: 37 Solid Must Do Due Diligence Checks
CT, please stop aping in first then research later 🥲
Use your 🧠 and build a good portfolio to ride with the bulls next time 😏
https://t.co/YOdxkNoHdk
Everyone says "DYOR."
Very few explain HOW to actually do it.
Here's a practical Crypto DYOR Checklist to help you spot red flags before investing. 🧵⤵️
https://t.co/v1mQwBsreM
DYOR isn't about finding the next 100x.
It's about avoiding the next rug pull, and surviving.
A strong research process won't eliminate risk, but it can dramatically improve your odds. Also do not put all eggs into a single basket 🧺