Since we announced Apollo’s maiden Mineral Resource on September 8, shareholders have been asking me: where does Apollo grow from here?
This cross section shows why we’re excited about the potential. The highlighted spaces between the model blocks reflect limited or no drilling—areas where further drilling could unlock growth. Also, as everyone knows, we are growing at depth in the Ramp Zone. Check out the cross section image 👇 $CNL
Today’s results include a new high-grade tungsten-gold discovery outside the Apollo breccia: 8.15m @ 0.40% WO₃ and 8.47 g/t gold.
With the U.S. and Colombia recently signing a framework to strengthen critical-mineral supply chains, finding more tungsten in Colombia is especially timely.
Plus 13 new high-grade veins, 7 of which are outside the block model including:
• 1.15m @ 57.98 g/t AuEq
• 1.25m @ 28.73 g/t AuEq
The next chapter is in the drilling: 13 rigs turning across Guayabales and 96 drill holes awaiting assays.
Full release: https://t.co/PJ5s6hzqU1
$CNL has just announced Apollo’s maiden mineral resource… a proud day for our team, but certainly not a moment to stand still.
What excites me is not simply the scale of this first estimate… it is the combination of scale, grade, a surprising large, high-grade open pit with a low strip ratio, the high-grade at the Ramp Zone, and the opportunity to keep growing.
We see a favorable backdrop in Colombia… and we are positioning Collective to seize that opportunity. We deliberately accelerated this maiden Mineral Resource so we could, in turn, accelerate the project’s path toward licensing—with submission of our environmental licence application now targeted for H2 2027. We are not waiting to finish discovering before doing the work needed to advance responsibly toward development.
And there is plenty more discovery work ahead… approximately 40,000 metres of additional drilling have already been completed since the March 31, 2026 database cut-off. None are included in today’s estimate.
With 13 rigs operating across Guayabales, we are pursuing that opportunity aggressively. Exploration, engineering and environmental work are advancing together… growing the resource while building the foundation for the project’s next chapter.
For our shareholders, our team and our partners in Colombia, today is a milestone worth celebrating. For me, it is also a powerful incentive to push harder.
https://t.co/GAL9MnM3xJ
Many have asked me what Colombia's mining sector will look like under the new government. It's go time. Colombia is about to become LatAm's latest hot mining destination.
Vice President Restrepo just put mining back where it belongs: a strategic sector for development, employment, and investment, done responsibly. Collective Mining ($CNL) is going to be one of the key pillars of Colombia's economic growth engine and the first hard rock producer of tungsten, a key critical mineral.
What a nice surprise while visiting $CNL in Caldas, Colombia — the assay results for Apollo’s new northern breccia extension arrived while I was there.
Watch the video for the full story, but a few quick highlights from today’s release:
• 100-metre northern extension to the Apollo breccia body at ~1,000 MASL
• 141.40m @ 4.88 g/t AuEq, including 38.00m @ 15.46 g/t AuEq
• A 170-metre vertical extension to the Apollo system
• Follow-up hole APC180-D1 has already cut up to 100m of prospective visual mineralization ~100m to the west — assays pending
And the best part? We weren’t even targeting this new breccia extension. The holes were on their way to test the Ramp Zone (assay results pending).
Apollo continues to surprise us.
Full release 👇
https://t.co/ofIqr5hfeW
Wrapping up #PDAC2026 with great engagement from investors and industry peers.
The Collective Mining team was pleased to showcase drill core from the Apollo discovery and discuss ongoing exploration activities at the Guayabales Project in Colombia.
Thank you to everyone who took the time to stop by and connect with our team.
$CNL #gold #copper #tungsten #mining #exploration
We are officially live at #PDAC2026! We invite investors, geologists, and industry partners to visit Collective Mining at our two key locations:
- Core Shack (Booth 3114A): Get a close-up look at the recent drill core from the Apollo System and examine the mineralization firsthand.
- Investor Exchange (Booth 2138): Connect with our leadership team to discuss our latest operational milestones and 2026 outlook.
Come see the physical evidence of our work in Colombia. We look forward to seeing you there!
$CNL | Collective Mining is pleased to display drill core from the high-grade Ramp Zone at the upcoming #PDAC2026 Core Shack Session. ✅ Highlighted results include 58.10m @ 21.33 g/t Au from the deepest hole ever drilled at the project.
Visit us at Booth 3114A on March 1–2. We look forward to connecting in Toronto!
Collective Mining reports 54.55 m at 7.04 g/t as ramp expands toward 2027 resource | Ari Sussman
@CollectiveMini1 (TSX: CNL; NYSE American: CNL) Executive Chair Ari Sussman says new drilling at the Ramp Zone within the Guayabales Project in Colombia continues to confirm high-grade continuity as the company advances toward a maiden mineral resource estimate targeted for the first half of 2027...
Full interview at Kitco Mining:
https://t.co/ONud2qJVgm
📢 News Release | $CNL $CNL.T
Collective Intercepts 54.55 Metres @ 7.04 g/t Au and 16 g/t Ag with Assay Results Still Pending for Another 370 Meters of Mineralization.
Read it now:
https://t.co/fYhQsqcGds
🎙️ We are pleased to share that our Chairman, Ari Sussman (@Ariski73), was interviewed today by Trevor Hall (@TrevAHall) on Mining Stock Daily. The discussion covered key developments and upcoming catalysts at our Guayabales and San Antonio projects.
A standout highlight from the interview is Ari's emphasis on the remarkable results from recent drilling. Notably, step-out hole APC-159 intersected high-grade mineralization at surface, yielding 30.70 meters @ 17.35 g/t AuEq within a broader interval of 165.75 meters @ 5.65 g/t AuEq (announced today).
Additionally, we encountered very high-grade mineralization approximately 1.4 km below surface in the Ramp Zone, where hole APC-143-D3 cut 58.10 meters @ 21.33 g/t gold (announced January 27).
Listen to it on Spotify: 👉🏼 https://t.co/wzCTK5BL2h
¡MAÑANA! Estaremos en el Colombia Gold Symposium 2025 con la conferencia de Ari Sussman, Executive Chairman de Collective Mining, hablando sobre los avances de los proyectos Guayabales y San Antonio.
🕜 11:00 a.m.
📍 Hotel Intercontinental, Medellín
¡Te esperamos!
Carlos Rios (VP Exploration) and I created a detailed video explaining today’s results from the San Antonio Project incl 172.4 m @ 1.40 g/t Au, 0.16% Cu, 17 g/t Ag and 68 ppm Mo
https://t.co/RtmBgZHk1G
This one has the ear marks of another big system in the making.
Lots more to come!
For those loving the #tungsten bull market underway with prices hitting decade+ highs at $500/MTU we at $CNL announced what must be one of the best tungsten drill intercepts this cycle cutting 37.15m @ 0.73% WO3, 2.19 g/t Au, 0.92% Cu & 89 g/t Ag
Check out the core video 👇!
Two shareholders asked me why is $CNL drilling the San Antonio project (2 rigs) when we have a major discovery in Apollo (Guayabales project)?
Answer: How can we ignore a potentially giant system located next to the Pan American highway and hydroelectric power lines only a few km’s away from Guayabales?
San Antonio is without question a big & intensely altered system with porphyry style mineralization traced for more than 3km with the following attributes:
1. Multiple styles of porphyry related mineralization encountered through drilling incl. copper and gold porphyry mineralization, late stage CBM veins and sulfosalts.
2. Hole SAC-11 discovered a porphyry system by intersecting 290.2m @ 0.58 g/t Au, 3 g/t Ag and 0.17% Cu. We are hunting for the source of this mineralization
3. We continue to cut potential mineralization in subsequent follow up holes. See the video below of drill core tray from a recent hole cutting intense altered rocks enriched in sulphides. Caution** wait for assay results, which are expected in August.
The prize at San Antonio is potentially very large, a nice complement to our Apollo system. If we find a deposit at San Antonio, could it feed the same mill as Apollo?
⏯️ Renowned structural geologist Brett Davis shares his insights on Collective Mining’s Apollo discovery, which he describes as “one of the most amazing systems” and the “largest breccia” he has ever seen. He explains the three distinct mineralization phases that make Apollo a standout precious metal discovery.
👉🏼 Watch it now:
https://t.co/y1jkolGdwZ
$CNL $CNL.T
📢 News Release | $CNL $CNL.T
Collective Mining Discovers a Gold-Copper Porphyry System at the San Antonio Project by Intersecting 290.20 Metres at 0.58 g/t Gold, 0.17% Copper, 3 g/t Silver and 70 ppm Molybdenum.
Read it now: 👇🏼
https://t.co/7w2NuOy7Gh
📢 This week, we had the pleasure to host our Board of Directors to the project. We reviewed our progress to date, exchanged ideas, and unveiled our exciting 60,000-meter drilling plan for 2025. $CNL $CNL.T
Awesome week in Colombia visiting $CNL projects
Many inbounds asking about the new high-grade Ramp Zone & when next assay results should be expected
Answer: Results for holes APC103-D1 & D2 in early Feb
Video below by me reviewing core from these holes. Very interesting!
📢 News Release | $CNL $CNL.T
Collective Mining Discovers High-Grade Subzones in Apollo and Drills the Best Hole Ever, Intersecting 150.55 Metres at 6.16 g/t AuEq Within 534.40 Metres at 2.70 g/t AuEq.
Read it now: 👇🏼
https://t.co/U5lOlsU4gm