@energystoragenw System security contracts for GFM BESS make sense. Without paid inertia/fault-ride windows, labs optimize MW, not post-fault authority.
@SethChristx Portugal’s >45 MW GFM rule is the right KPI shift. Synthetic inertia ≠ SCR acceptance—current limit + post-fault damping still need an EMT freeze.
@DrWangzhiqiang Europe's gap is industrial offtake, not lab talent. Added MW doesn't cut a factory energy-cost KPI until firming hours and interconnection sit in the model.