Just today, Tom Lee released one of the most significant market predictions of his career.
Over the next two weeks, four stocks could deliver some of the biggest gains in their history.
1) $ASTS — $23.27 → $48
Latest company news on $ASTS, Nov 20: AST SpaceMobile is paying Firefly 10 million shares for a Blacklift engine license, alongside a new Ligado L-band filing.
Not investment advice.
Full hub with catalysts, filings and news: https://t.co/vrnjZNVRA3
$ASTS + Vodafone just lit up Europe’s first Earth-space satellite gateway in Málaga, Spain.
Why bulls are cheering this milestone:
• Spectrum Cleared: 700MHz low-band authorized by Spain + live end-to-end voice/video/data tests verified in Granada
• Pan-European Scale: Supports Satellite Connect Europe, their wholesale JV built to serve mobile operators across the entire continent
• Gov & Disaster Failover: Dedicated testing for Public Safety (PPDR) unlocks high-margin European emergency & sovereign infrastructure contracts
Regulatory groundwork Technical validation Global commercial grid loading...
$ASTS #FinTwit #SpaceStocks #Telecom
I’ve decided I’m going to start reissuing press releases that were lost in the market downturn.
🚨🚨 $ASTS WINS $1bn AWARD FROM JAPAN FOR CONSTELLATION!!!🚨🚨
https://t.co/ICOiccJbHL
$ASTS: 🚨Vodafone and AST SpaceMobile have switched on Europe’s first Earth-space station dedicated to advancing research and development (R&D) into new integrated terrestrial and low Earth orbit (LEO) satellite network services.
Málaga Satellite Centre goes live. Field Activities start in nearby Granada
The earth-space station is supported by an initial grant from the Spanish Space Agency, and forms part of the Málaga Satellite Centre, Spain, that Vodafone and AST SpaceMobile established with the University of Málaga in the E.T.S.I. de Telecomunicación in cooperation with Mobile & Aerospace Networks Lab (Mobilenet).
Connecting safety robots
Safety inspection robots and crisis communication services that switch seamlessly between land and LEO satellite-based networks are some of the applications Vodafone intends to enable using its new earth-space station. Vodafone has begun initial activations in Granada using an automated system, installed in collaboration with the University of Granada, that remotely captures video, data and call logs exchanged between AST SpaceMobile satellites, the Málaga gateway and the terrestrial network.
The Málaga Satellite Centre provides a central hub for Vodafone, AST SpaceMobile and its partners to validate and optimize direct-to-device (D2D) smartphone broadband access and applications in areas with little or no terrestrial coverage. It will also support live field operation of applications such as autonomous robots for inspecting remote or hazardous sites, connected vehicles, safety drones and devices, including the chipsets and software that power them. Working across terrestrial and satellite networks will help improve performance, battery life and other capabilities.
Orchestrating the earth-space gateway
Refining the intelligent orchestration of terrestrial and satellite traffic will be a key focus for Vodafone, giving customers a seamless connection, whether they are connected in the sky or on the ground. Ensuring products and services work across both terrestrial and satellite networks is essential so that regular smartphone users and first responders can maintain uninterrupted connectivity regardless of their location.
Marco Zangani, Director of Network Strategy and Architecture, Vodafone, said: “With EU citizens and businesses relying on mobile networks for personal communication, safety and productivity, the resilience and ubiquity of coverage is a matter of economic and social importance. Our new facility enables EU member states to collaborate in developing essential communication systems that connect people and devices everywhere, at all times.”
Through greater cooperation, mobile operators, chipset manufacturers, and handset makers can use the earth-space station to jointly test and validate their hardware and software across an integrated network. This improved, cross-platform connectivity is possible because Vodafone’s partner, AST SpaceMobile, operates a satellite constellation in low Earth orbit that can connect directly to an operator’s terrestrial network through a gateway, in this case a 0.9-metre dish.
Disaster Relief
The growing frequency of climate-related disasters and power grid instability underlines the need for resilient, wide-reaching communications infrastructure that can serve as a critical lifeline during emergencies.
Vodafone will explore ways to improve emergency response communications in remote areas. This includes testing radio frequencies dedicated to Public Protection and Disaster Relief (PPDR) agencies, including fire, ambulance and rescue, as well as Terrestrial Networks (TN) and non-terrestrial networks (NTN) interoperability scenarios. For example, Vodafone could simulate a disaster by shutting down ground-based networks and forcing the mobile antenna to automatically reselect a satellite channel.
Spanish Ministry of Digital Transformation
The Spanish Ministry of Digital Transformation and of Public Service authorised Vodafone to operate in the 700MHz frequency band, supporting the development of the Málaga earth-space facility. Fostering a new European ecosystem of combined satellite and earth connectivity solutions, in conjunction with technology companies, policymakers, and regulators, will ensure consistent, yet competitive, products and services that work across borders.
The Málaga Satellite Centre laboratory was established in October last year. It plays a vital role in supporting Satellite Connect Europe, the wholesale joint venture between Vodafone and AST SpaceMobile, which is collaborating with mobile operators to build a safer and more resilient Europe, ensuring reliable connectivity in times of crisis.
https://t.co/iy9pFt82Xo
$ASTS
FIRSTNET UPDATE — NOVEMBER 2026
FirstNet has officially confirmed on its website that its AST SpaceMobile satellite service is planned for 2027.
The service is designed to provide:
• Voice, data and text directly to ordinary smartphones, without special equipment.
• Mission-critical push-to-talk capabilities for first responders.
• Priority and preemption on Band 14.
• Initial coverage across the contiguous United States.
In a November 18 interview with Urgent Communications, AT&T’s Matt Walsh confirmed that seamless terrestrial-to-satellite handoffs are expected to be available from the first day of commercial service.
He also said FirstNet is intended to receive the service as soon as it becomes available to anyone.
For perspective, AT&T reported 8.7 million FirstNet connections across more than 32,200 public-safety agencies as of September 2026.
Pricing and the financial value of AST’s FirstNet opportunity have not yet been disclosed.
🚨 $ASTS is partnering with FirstNet Authority and $T to provide D2C to US First Responders integrating the space component into the existing 5G SA FirstNet network serving 6+ Mn US First Responders 🚨
https://t.co/mg1uZYNCyP
🚨 BIG DEVELOPMENT FOR $ASTS
The FCC just accepted AST SpaceMobile’s Q/V/E-band Direct-to-Device application for filing.
This is bigger than it might look at first glance.
The proposed modification covers AST’s 248-satellite constellation and seeks to add D2D service links across multiple high-frequency bands:
• 40–41 GHz
• 43.5–47 GHz
• 50.4–51.4 GHz
• 71–74 GHz
• 81–84 GHz
And importantly, the application covers user terminals both inside and outside the United States.
My takeaway:
AST is not just building a satellite phone network.
It is working toward a much broader global space-based connectivity infrastructure.
More spectrum flexibility could create additional opportunities for future network capacity and services.
This is another important regulatory step worth watching.
The application still needs to go through the approval process, but I like the direction AST is heading.
I remain bullish on the long-term vision.
The bigger picture is what matters.
Not investment advice.
If you find this useful, please like, repost & follow me. 🚀
🚨 $ASTS Bluebirds On The Move Update🚨
We now have confidence (edited from “Extreme Confidence” after peer review) that Batch 4 is preparing to ship next with the next week and a half (edited from next week” after peer review). #Spacemob sensing capabilities have a confirmed hit.
Nothing matters until it matters. But then, like so often is the case, everything matters all at once.
$ASTS: The FCC just accepted AST SpaceMobile's Q/V/E-band direct-to-device application for filing.
The Space Bureau's Nov 20 public notice covers the modification for AST's 248-satellite system. It adds D2D service links to user terminals inside and outside the United States on 40-41, 43.5-47, 50.4-51.4, 71-74 and 81-84 GHz.
Everyone wanted $ASTS at $130.
Now it’s around $30 and suddenly nobody wants it.
“Nothing has changed.”
Oh wait… Since the ATH:
🇯🇵 $1 BILLION in non-dilutive Japanese funding announced.
🇺🇸 ~$100 MILLION U.S. Space Force contract awarded.
🚀 ASTS announced BLACKLIFT, its own 20-ton reusable rocket, designed to launch up to 5 BlueBird satellites at once.
🛰️ BlueBird 11, 12 & 13 successfully unfolded and entered operations in orbit.
🏭 Production expanded through BlueBird 51, with 6 ASIC satellites/month targeted by December.
📡 Next-gen ASIC integration accelerated from BlueBird 50 to BlueBird 34, targeting 10x processing bandwidth.
🌎 Commercial authorization secured in Brazil, covering 50 MHz of spectrum.
🤝 Successful satellite beam handover validation with AT&T.
🚀 Launch agreements expanded to cover 100+ BlueBird satellites for 2027–2028.
💰 Q3 revenue reached $42.3 MILLION.
And the stock is down roughly 75%.
The price went backwards. The business kept moving forward.
Wall Street loved the potential at $130.
Now it’s ignoring the progress at $30.
$ASTS 🚀
$ASTS Blacklift milestones over the next few years:
> Composite tanks (Jan 2027): first composite tanks in testing at Midland. A few months late is fine and won’t materially affect the wider programme
> Launch pad (H1 2027): ASTS slides indicate they expect access to Wallops Pad 0-A, which is already being upgraded for Miranda. Northrop and Firefly would have to agree to share it, but the Virginia Spaceport Authority says 0-A isn’t part of its talks with ASTS so far. Antares 330 (up to 3 ISS cargo flights) and Eclipse won’t be flying often by late 2028, so there should be room on 0-A for early Blacklift flights while 0-B or a new pad is built (c.2 years)
> Antares and Eclipse flights (2027): Antares 330 flies Miranda for the first time, then Eclipse flies Vira. Neither engine has flown yet
> Pre-flight (2028): First-stage tank qualified, FAA licence filed, static fire with all 9 engines
If they get temporary access to 0-A and Antares/Eclipse fly on time, late 2028 is possible, though I still think 2029 is more likely...
Pictured: Antares on 0-A