⚠️ Live Crypto Drainer Spotted In Warsaw
A live crypto drainer was seen in Warsaw, Poland, promoting 100 USDC with a QR code.
Scanning the code led to a website showing signs of a drainer.
This incident highlights ongoing threats in the crypto space.
📰 Telegram: UnbiasedCryptoNews
4,000 NFTs were drained from hundreds of wallets through old Magic Eden contracts🚨
Here is everything we know:
- March 9 and Magic Eden shuts down its EVM NFT marketplace
- The interface disappears, but onchain approvals from users are not revoked
September 25, 3,832 NFTs are moved
The transactions reportedly appear as sales through Magic Eden contracts for: 0 ETH
Everything is being concentrated into one address:
0x71cF3f5724bD2B72Ef6464992aCd26216DE7fe33
At first this looks like a massive exploit.
Then 16 minutes later security researcher @0xQuit responds publicly:
He says the wallet is controlled by a white hat
And that every NFT inside it is safe and will be returned once the assets are no longer at risk.
The weirdest part is how this happened six months after Magic Eden had already shut down its EVM marketplace.
Magic Eden announced the shutdown in February.
If you previously gave a marketplace contract permission to transfer your NFTs using setApprovalForAll
that permission can remain active in your wallet even after the website disappears.
If you ever used Magic Eden on EVM chains
check your old approvals NOW
@lostsol Keep posting there much better to get seen. I’ve got a few tiktock channels and YouTube pages monetized from niche content and get millions on each but can’t get anything seen here on x. Feel free to reach out if ever want some tips for over there 🤝
A lot of process has been made in the short time i've spent using astra so far.
My documented experience of creating a animated series that i've always had in mind to make will continue soon.
Doing it in my free time for pure joy, maybe even some one will learn something.
Creating A Animated Series Using Astra.
Day 2 🎬
For this portion we focused on creating milo facial features more like his design. At the finish of day 1 I was noticing yea we had a model made but he looked nothing like Milo really.
Once we got the facial features down I then started working on the dreads with Astra. It took a few tries to get them the right size and length but I got it.
Along with the dreads we got him some fresh ear rings in. The first attempt by astra put them on his neck 😂. A few tunes and they were placed perfectly on his ears.
Come back for Day 3 to watch the whole process of creating this series with Astra each day with me.