Exposing the lies & bullshit dispensed by HS2 & its deluded fan club. Retired Chartered Civil Engineer. Transport Planner. #BlockedbyAdonis. Likes rail
The HS2 trolls come out to claim HS2 is Green. Not one of them has ever come up with a justification for designing a railway for 250mph. It's the major factor why it is so expensive & so destructive. The carbon deficit of its construction & width needed is greater than a motorway
@BBCTomEdwards Stations on HS1, like Stratford, have much lower platforms than the UK 'standard'. It makes boarding much slower. Needs massive ramps for some. It was built to the EU high speed standard. HS2 was supposed to be the same. It was nuts.
@mcahs2 If anything goes wrong then it's going to be much worse at high speed. Far worse still if two trains are involved going In opposite directions. Tracks are not separated enough to avoid that happening.
@mcahs2@BBC is reporting that one train was stationary & the other one was traveling at speeds 'up to 200km/h'. That is the speed our diesel HST trains travelled at in 1976. HS2 was designed for twice that speed. It's completely nuts, utterly pointless & ridiculously expensive.
@Captain_Deltic I have long been trying to understand how HS2 trains would actually brake under ETCS. There is just one flag for 'low adhesion'. How 'professional' is that? Who decides if it's on or off & when?
@TransportActio2@TANCymru It was all in the 1994 SACTRA report on Trunk Road Assessment. Building more roads creates more problems than they solve. One of the worst is new developments built in unsustainable locations with no alternatives to the use of cars. That's what the planning system is delivering.
@Hrushworth I know a new railway bridge with five types of fencing. It doesn't cater for cyclists or pedestrians & it's tight for two large vehicles.
@ElaineCox11 NPPF is nuts. It is utterly stacked in favour of development on greenfield land where it is not possible to provide genuine alternatives to cars. It is still not viable because speculators extract the land value gain & essential facilities don't happen. Transport not considered.
@philatrail An utter waste because of the pointless specification & the constraints of putting a massive junction is such a stupid location. It would have been cheaper, shorter & faster to tunnel directly into Birmingham. Or just don't build high speed lines into cities - like others do.
@lfg_uk The High Speed Line HS2 is costing around Β£7bn/yr for just 120 miles of track with an unknown delivery date. We have governments that like wasting money. It doesn't help that they have almost no knowledge of engineering or the laws of physics.