@carlosradioguy@AvantiWestCoast The overheard wires which fell down are Network Rail's responsibility. The Pendelino trains which Avanti lease are maintained by Alstholm.
At this time it is not known whether the overhead wires or the train pantograph were faulty.
Avanti are very much the victims.
@AvantiWestCoast@louvinney Looking at https://t.co/41Ef9VMRM1, 1S69 is still on the rails just south of Harrow, with 1Z99 rescue loco in the Down Fast platform just ahead. Must be a lot of disentangling to do. Will we learn if the pantograph failed and damaged the OHLE or vice versa?
@arthurliverpool@LNER LNER are in ongoing discussion with the Azuma builders and maintenance company, Hitatchi, to try and get on top of a maintenance backlog.
Additionally one Azuma was damaged in a low speed incident at the approach to Leeds train depot. Currently being repaired at Wolverton.
@birdsnestsblog@northernassist@rickard62@Raj_Mcr@railwaychaplain About time that Grant Schapps publicly acknowledged the infrastructure delays caused by Network Rail. Blackpool electrification, platform extensions to accommodate Northern’a new & longer trains etc.
@DavidHorne@Al_Tereego Can’t come too soon. No more daily short forming and reservation cancellations.
By the way was the set that pranged with the HST at Neville Hill, been returned to traffic?,
@NetworkRailKGX I was part of the BR GN suburban resigalling project team in the 1970’s
Are the original over ride systems still operational. If a TDM fault occurred, the over rise established auto working on preferred routes, until the local panel could be manned.
@LNER This is the harsh reality of the Azuma bike space. Nothing like the picture you posted. If train crew can be taught to unlock the end panel and retract it as shown here, then a second bike can be more easily added, and station dwell time might not be exceeded.
@grantshapps Don’t forget to publicly attribute to Network Rail, their many failings which have repercussed on Train Operators. Eg delayed Blackpool to Manchester electrification, delayed Thameslink automatic train operation along central core.
☂⚡ Don't let this happen...
Please keep umbrellas folded away near the railway - especially when it's windy! 🌬️
These strikes can cause serious damage and delays - like this umbrella did as it struck power lines at London Paddington station.
#RailwaySafety
.@Chris_Boardman says that 82 schemes have been developed in Manchester so far which would deliver 400 miles of cycle infrastructure. What is missing is the funding to make this happen
@LNER West Yorkshire was a Victorian dogs breakfast of competing railways. The Great Northern built the still used route from Doncaster to Leeds via Wakefield Westgate, then fanned out eastwards with a network of local lines (yellow on the map below) all now consigned to history.