.@lohstroh and @B_whitehead21 started Giga to mine bitcoin using old shipping containers, refurbished gen sets and flare gas.
Now they're on the cutting edge of modular AI data center manufacturing.
GigaBase(d) is an incredible product in a world where speed to token is key.
The Giga team is heading to @TheBitcoinConf 2026.
We’ll be at Booth #518 in Compute Village talking AI, compute, mining, and the infrastructure behind it. We're also bringing a Giga Air Box with us.
Stop by and say hi.
Traditional DR uses averages.
Giga uses real-time site economics.
Live LMPs, operational telemetry, ancillary markets—evaluated every hour to decide whether to mine, curtail, or capture reserve revenue.
Here’s how it works ↓
https://t.co/Kw76XLiYdk
AI doesn't just need GPUs. It needs power, speed, and certainty.
At Giga, we design, build, and operate AI-ready data center infrastructure end-to-end. From modular power systems and transformers to turnkey, rack-ready sites, we are built to remove complexity and shorten timelines for large scale sites.
Giga Box Air is in stock and ready to ship from our Long Beach factory.
Updated inventory and lead times are now live.
Giga Box Hydro is made to order with a 14-week lead time.
For pricing and quotes reach out to [email protected].
@GigaEnergy_ is building some pretty incredible solutions for flexible data centers. Energy is the biggest line item in your data center OPEX. But it doesn’t have to stay a cost center.
https://t.co/RJxChZlb5r
What a great talk at our October @htxblockchain meetup! 🎉 Clay Holliday from @GridBeyond_ talked about supporting crypto miners and the grid.
Big thanks to @HollidayTX and the @GridBeyond team for an unforgettable evening!
Mark your calendars for next month's meetup:
📅Thursday, November 7th - link in comments.
@lucrismafi
Whether a grid operator pays a generator to stay off in reserve or pays a load to stay on in reserve, it’s the same from a system engineering and econ perspective.
It only matters from a political perspective whether the resource is a natgas turbine, battery, or bitcoin miner.
TotalEnergies CEO Patrick Pouyanne:
"A green intermittent electron has no value, or little value. What is good is to have a clean, firm power for customers."
"We need some renewable sources to have the clean part, but we need to combine them with flexible assets."
@damnyeah@BitcoinPierre My assumption is that Lancium has a patent on the software required to offer mine as a load resource as a CLR - that patent has been challenged. If all BTC miner load were a CLR Lancium would essentially be the only option
@SullyCNBC Tight grid conditions and high pricing during the summer is a positive market function in a deregulated market like ERCOT; signaling new generation, storage, flexible load (BTC Miners) etc to developed/go live. And is the reason Texas has lower energy prices than much of the US