Bitcoin Mining Pool | LuxOS | Hashrate Forward Marketplace | Mining Research and Data @HashrateIndex | Hardware Trading | Luxor Energy | Luxor Commander
wen WhatsMiner?
now.
LuxOS is live on MicroBT WhatsMiner. And MicroBT is making a strategic investment into Luxor alongside a $100M hardware commitment. Details bellow. π§΅
Sourcing GPUs is only the beginning.
This breakdown from @HashrateIndex covers what a validated AI infrastructure stack actually requires β and which reference architectures NVIDIA, AMD, Intel, and OCP publish as blueprints for building one.
We built an interactive reference architecture explorer to go with this one. Browse validated AI data center stack designs from NVIDIA, AMD, Intel, and OCP β filter by workload, scale, and vendor preference.
https://t.co/I5KNXBJrFB
4CP season started 10 days ago.
Here's how the Luxor 4CP Optimizer works and what it looks like in action.
No manual monitoring. No outside vendor. Already part of your stack.
Your weekly hashrate weather forecast is in.
Stormy weather further into the fall π§οΈ
BUT
The forward curve is currently in Contango for 4CP π₯΅π₯
The 4CP rule is unforgiving.
If your site is consuming power during a 4CP interval, you anchor a full year of transmission costs. If you are off, your fixed cost basis is anchored to zero.
Here's the system we built to be off, without an operator in the loop:
https://t.co/GVXGP6eJjS
Hyperscalers are bypassing grid connections and procuring power behind the meter.
Haley Thomson, Director of Eenergy, discussed the implications for bitcoin mining economics on @blockspace:
π§ LuxOS 2026.6.2 is live.
- New models: S21 Pro+ and two S21+ hashboard variants.
- Default power now matches nameplate stats.
- Tuner stability improvements.
+more
Full changelog: https://t.co/TiVZMAtgFv
Sounds like a meme, but the mechanism is real.
Check out @hashrateindex's measured read on mining crypto with AI compute β grounded in what our GPU desk is seeing firsthand.
A 5-week-old coin set off a GPU mining rush β and it's not hashing. Pearl mines crypto by running AI matrix math, and Together AI already signed on.
Meet Pearl (PRL) β the AI-compute cryptocurrency:
https://t.co/9uyG9iErwj
Find the full read on how four 15-minute windows on the ERCOT grid determine Texas mining sites transmission costs for the next 12 months:
https://t.co/MhsY2iLp4W
Today marks the start of 4CP season, and Luxor Energy members just received their first 2026 curtailment dispatch signal.
This is what it looks like in action. π§΅
The site was running 702 miners. During the curtailment window, load dropped to near zero, with Commander shutting down the least profitable miners first.