@SouthernRailUK The onboard announcements for Cooksbridge (up) and Lancing (down) still announce for a short platform on an 8 car service, despite the fact these platforms were lengthened a few years ago to fit 8 car trains. Will the announcements ever be updated in the future?
@StagecoachSE a big thanks to the driver of the 1538 8A from Cliftonville Warwick Road (a timing point) for leaving 2 and a half minutes early just before I arrived at the stop
@SouthernRailUK I'm currently on the 1512 from Chichester towards Portsmouth Harbour. Can't remember what time the bus earlier was, however both were operated by Ensignbus with drivers relying on satnavs
@SouthernRailUK does your rail replacement contractor give bus drivers any information at all about their route? I've now been on two replacement buses today between Chichester and Havant that have gone the wrong way - one missed out 4 stops and on another a passenger has (1/2)
@StagecoachSE@Jamroll18 This is incorrect, it is running every hour all the way through to Hastings, the online journey planners are incorrect. The paper timetable advertising an hourly service is the correct timetable
@SamDawe06400107@StagecoachSE@WeAreOpenreach Most buses on the 1066 run all the way from Tunbridge Wells to Hastings via Hawkhurst, but there is an error with the online maps/journey planners where some of the trips between Hawkhurst and Hastings aren't showing. See the screenshots of the actual timetable
@1066shrimprail It appears the vehicle due to operate this service encountered an issue in Tunbridge Wells as it has been sat there for over an hour. The 1311 from Ticehurst is just leaving the Wells, currently 3 minutes late.