🚧 KRIDE | BSTP | Height Safety Awareness Toolbox Talk-C4A Station
📍 Topic: Work at Height Safety Awareness
Toolbox Talk (TBT) was conducted for all formwork workers to reinforce critical safety practices for working at height.
⚠️ Key Safety Topics Covered:
✅ Identification of fall hazards and high-risk areas
✅ Mandatory use of appropriate Personal Protective Equipment (PPE)
✅ Safe work practices and fall protection requirements
✅ Compliance with work-at-height procedures before, during, and after the task
🙋 Worker Participation: All workers actively participated in the session, demonstrated a clear understanding of the hazards and control measures, and acknowledged their responsibility to comply with all safety requirements.
🚨 Safety Reminder: No PPE = No Work. No fall protection = No Work at Height. All personnel were instructed that work at height shall only commence after implementing the required safety controls and obtaining authorization wherever applicable.
Safety First | Zero Harm | Every Worker, Every Task, Every Time.
#KRIDE #BSTP #ToolboxTalk #SafetyFirst #WorkAtHeight #HeightSafety #FallProtection #ConstructionSafety #Formwork #PPE #HSE #EHS #OccupationalSafety #SiteSafety #SafetyAwareness #ZeroHarm #SafeWork #RiskAwareness #WorkplaceSafety #SafetyCulture
🏥 KRIDE / BSTP / C4A – New Workers Medical Check-up
📍 Location: Kaggadasapura Station
✅ Medical Screening Successfully Completed
The mandatory pre-employment medical examination for newly inducted KRIDE / BSTP / C4A work-force was successfully conducted at Kaggadasapura Station.
🩺 The health screening was carried out to assess the medical fitness of all newly joined personnel prior to deployment, ensuring compliance with safety regulations and occupational health standards.
🤝 This initiative reflects our continued commitment to maintaining a safe, healthy, and compliant work environment for all project personnel.
#KRIDE #BSTP #C4A #Kaggadasapura #MedicalCheckup #WorkerHealth #OccupationalHealth #HealthAndSafety #SafetyFirst #WorkplaceSafety #MedicalScreening #FitForDuty #ConstructionSafety #RailInfrastructure #RailwayProjects #InfrastructureDevelopment #ProjectSafety #TeamSafety #SafeWorkplace #CommittedToSafety
A significant milestone towards #HarGharJal💧 The Jal Arpan Ceremony was successfully held at Gram Panchayat Bhuidharpur, Block Bharohiya, reaffirming the commitment to safe drinking water and healthier communities
#JalJeevanMission#WaterForAll#RuralDevelopment
Operationalisation of India–UK CETA marks a new chapter in bilateral economic cooperation. I congratulate the Governments of India and the UK, highlighting CETA's role in boosting trade, investment and sustainable infrastructure. 🇮🇳🇬🇧
#IndiaUKCETA#Trade#Infrastructure#FICCI
#WATCH | Navi Mumbai International Airport (NMIA) welcomed its first international scheduled flight today as Air India Express flight IX208 from Abu Dhabi landed at 10:20 AM.
@MoCA_GoI@DGCAIndia#NMIA
Mass Tool Box Talk Conducted to Reinforce Workplace Safety
📍 Location: Huskur Casting Yard, KRIDE BSRP Corridor 4A
As part of KRIDE's ongoing commitment to ensuring a safe and healthy work environment, a General Safety Training Program (Mass Tool Box Talk) was successfully conducted for the workforce at the Huskur Casting Yard under Corridor 4A.
The interactive awareness session aimed to strengthen workers' understanding of essential safety practices and encourage proactive participation in maintaining a safe construction site.
🎯 Key topics covered during the training included:
✅ Safe work practices at construction sites
🦺 Proper selection and use of Personal Protective Equipment (PPE)
⚠️ Hazard identification, risk assessment, and control measures
🧹 Good housekeeping practices and workplace discipline
🚨 Emergency preparedness, incident reporting, and response procedures
🤝 Promoting a strong safety culture through individual responsibility and teamwork
Regular Tool Box Talks play a vital role in enhancing safety awareness, preventing workplace incidents, and ensuring that every worker returns home safely. KRIDE remains committed to fostering a culture where safety is a shared responsibility and an integral part of every activity.
#MassToolBoxTalk #ToolboxTalk #WorkplaceSafety #ConstructionSafety #SafetyFirst #PPE #HazardAwareness #SafetyTraining #KRIDE #BSRPCorridor4A #HuskurCastingYard #SafetyCulture #SafeWorkPractices #TeamSafety #ZeroHarm
🚨 KRIDE/BSRP/C4A Awareness Training Programme
📍 Location: Huskur Casting Yard (C4A)
Topic: Fire Extinguisher Use & Emergency Response
✅To reinforce a culture of safety and preparedness, an awareness training programme on the proper use of fire extinguishers and emergency response procedures was conducted for all labourers at the RVNL–RPPL JV, K-RIDE BSRP C4A, Huskur Casting Yard.
✅The session provided hands-on guidance on the PASS technique—Pull, Aim, Squeeze, and Sweep—enabling participants to respond confidently and effectively in the event of a fire emergency. In addition, the workforce was briefed on the importance of timely emergency reporting, safe evacuation practices, designated escape routes, and assembly point procedures.
✅Such initiatives play a vital role in enhancing workplace safety, building awareness, and ensuring that every team member is equipped to act swiftly and responsibly during emergencies. Together, we remain committed to maintaining a safe and resilient work environment for all.
#SafetyFirst #WorkplaceSafety #FireSafety #EmergencyResponse #SafetyTraining #SafetyAwareness #ConstructionSafety #RailInfrastructure #RVNL #KRIDE #BSRP #SafetyCulture #ZeroHarm #SafeWorkplace #Teamwork
🚧 BSTP–KRIDE–C4A Station Project
📍 Location: Kaggadasapura Station
💡 Lux Monitoring Activity
Lux level monitoring was successfully carried out at Kaggadasapura Station, covering Grid 9–13, the IR track site, office area, and central work zone to verify adequate lighting levels.
✅ The activity was conducted to ensure proper visibility, enhance workplace safety, reducing risk of accidents and maintain compliance with project safety requirements. 👷♂️🦺
#KRIDE #BengaluruSuburbanRail #BSTP #Corridor4A #ConstructionSafety #ProjectSafety #RailInfrastructure #SafetyFirst
Rithwik Projects organized a free Medical Camp at Urej Village, Tokisud, Jharkhand, providing health check-ups, medicines & consultations to 10 beneficiaries #RithwikProjects#CSR#Jharkhand#CommunityCare
Monthly P&M & Electrical Equipment Inspection
📍Corridor-4A, Huskur Station
✅ The monthly inspection of P&M and electrical equipment was successfully completed at the RVNL–RPPL JV, K-RIDE BSRP C4A Huskur Batching Plant.
✅ All available equipment was inspected in accordance with the approved inspection checklist. Observations were recorded, and necessary corrective actions will be implemented to ensure compliance with safety and operational requirements.
#MonthlyInspection #ElectricalInspection #EquipmentInspection #SafetyFirst #BatchingPlant #HuskurStation #KRIDE #RVNL #RailInfrastructure
#RithwikProjects is always in the forefront in safety related issues at all its project sites. These billboards are erected with an aim to spread #Safety awareness among site staff at huskur casting yard and batching plant.
A major milestone for #bengaluru The groundbreaking of the 3-Lane Twin Tunnel Project at #hebbal marks the beginning of a transformative urban mobility initiative. Proud to execute this landmark BDA project using the Cut & Cover method. #RithwikProjects#urbanmobility
#RithwikProjects is proud to take up the execution of 3-Lane Bi-Directional Road Underpass on Bellary Road, #Bengaluru being developed by BDA. Built using the Cut & Cover method, this project will ease traffic, improve connectivity, and enhance #urbanmobility#Infrastructure
#RithwikProjects remains fully committed to delivering Package C4A on schedule while upholding the highest standards of #quality & #safety. Our teams are driving efficient execution, rigorous QC, & strict HSE protocols across all 9 stations ensuring reliable service for commuters
🚧 BSTP Updates | Corridor–4 | Kanaka Line | Package C4A
Package C4A consists of 9 stations, including 8 at-grade stations and 1 elevated station.
Construction at Bellandur Station, one of the at-grade stations on the Kanaka Line, is progressing steadily:
🔹 Foundation and columns works completed
🔹 Soil backfilling work in progress
🔹 RE wall construction: 360 Rmt completed out of 460 Rmt
📸 Swipe through to view the latest construction progress at Bellandur Station as the project continues to advance toward completion.
Enhancing connectivity. Delivering progress. 🚆🏗️
Follow our official pages for regular Project updates
X : https://t.co/CW64zJWeeC
LinkedIn: https://t.co/wow8cpRXfy
Instagram: https://t.co/Z8ztEHcdBF
Facebook: https://t.co/9FZ5De9XW5
Whats App Channel: https://t.co/9SyKmH86DG
YouTube: https://t.co/x9h3E5TgiM
Shri Lakshman Singh, MD @KridePrm , reviewed progress of Corridor-4A (Kanaka Line) station packages at Heelalige, Carmelaram & Marathahalli BSTP Stations, focusing on accessibility, execution planning & commuter convenience. #BengaluruSuburbanRail#KanakaLine#Infrastructure