The 4th Moe’s Coffee has been craned into place in Blaine, Washington.
The building was manufactured and finished at our Phoenix facility, then shipped north to the site. It arrived nearly complete, so the crew can move straight to connections and finish-out. Congrats team!
The second Town Pump Stone House Coffee Shots kiosk is opening in Bonner, Montana. Kalispell opened earlier this year and Bozeman is being installed now.
One controlled building program, three Montana markets.
Congratulations to the Town Pump team!
#CommercialModular#CStore
A scalable building program starts long before the building reaches the site.
Conduit, junction boxes, and circuits are engineered, routed, labeled, and installed before the walls close.
Your finishes. Consistent. Controlled. Scalable.
Owners invest time selecting the right finishes for their building. Russo Modular was built to deliver those finishes with the consistency that only controlled manufacturing can provide.
Controlled Scalable Modular Programs
Before it's a coffee shop...
our patented framing system does the heavy lifting — every building engineered and delivered the same way, to every location. When a project becomes a manufacturing program, scaling becomes your ⚡️superpower.
#ModularConstruction#Steel#DriveThru
Wheels up!
Two more Black Rock Coffees hit the road — one crossing state lines to Killeen, TX, the other a local delivery to Chandler, AZ. Execution at scale, in real time.
#CraneDay#BlackRockCoffee#QSRConstruction
When your work is building for coffee, you spend time in the places that built the industry. On the ground in Seattle. ☕
Controlled • Scalable • Modular Programs
#Coffee#Seattle#RussoModular
We brought backup.
The best conversations this week have been about timelines—brands ready to open, developers ready to fill sites and the gap in between. That gap is where we live! Find us on the floor today and tomorrow.
#ICSCLasVegas#CRE#ModularConstruction
Buckeye coffee drinkers, a new spot's waiting for you! Black Rock Coffee Bar is open at Miller & Broadway — one more location to fuel your morning.
Site construction by Russo Siteworx. Congrats to the Black Rock team on a knockout launch.
#BlackRockCoffee#RussoModular#Buckeye
Josh Sorge is walking the floor at MUFC in Las Vegas this Wednesday and Thursday — at 6'+ he's hard to miss. If you want to talk construction timelines, comment here and he'll find you. He's got hats.
#MUFC2026#FranchiseDevelopment#ModularConstruction#QSR#RussoModular
13 tons. One crane. One afternoon in Kalispell, Montana. No snow days for this crew.
Read More → https://t.co/yfqLxNejQ7
#RussoModular#ModularConstruction#TownPump
(Images Jack Underhill/Daily Inter Lake)
Coming through Phoenix for Barrett-Jackson or the Open?
We're 5 minutes from PHX. Schedule a tour while you're in town. DM or Email https://t.co/kmkeNt9jEK
60-second look: [Video]
#BarrettJackson#PhoenixOpen#ModularConstruction#RussoModular
Happy New Year from the Russo Modular Team!
Get on the New Year Schedule-Slots are open for 2026 and 2027. Whether it's 1 location or 20, early planning means we can delivery when you need us to.
🌐 Contact us: https://t.co/kmkeNt9jEK
#architecturalplans#russomodular#USA
There's something about seeing a completed project all lit up at night. The "Now Open" sign says it all. Another drive-thru delivered and generating revenue in a fraction of traditional timelines.
View the Jimmy John's Project →https://t.co/m2dA7KKCEl