Dear Sir/Madam,
We wish to bring to your urgent attention a critical infrastructure gap at the junction of the Major Arterial Road (MAR)—a segment integral to the proposed Peripheral Ring Road (PRR) / Business Corridor connecting Magadi Road and Mysore Road—and the Mysore Road National Highway (NH).
The current infrastructure suffers from a fundamental lack of integration, leading to severe bottlenecks in coming days:
Missing PRR/MAR Integration: The MAR does not seamlessly merge with or cross the Mysore Road NH.
Lack of Elevated Access: Vehicles traveling on the MAR currently have no direct access to or from the elevated section of the Mysore Road NH.
Required Intervention:
We request your immediate intervention to plan and execute the necessary works to achieve a signal-free and seamless integration at this vital junction. This must include:
Direct Ramps/Grade Separator: Constructing the required infrastructure (ramps, flyovers, or underpasses) to ensure a smooth, signal-free connection between the MAR/PRR and the Mysore Road NH.
Seamless Access: Providing dedicated and continuous entry/exit points for traffic flowing to and from the elevated Mysore Road NH and the MAR/PRR.
Rectifying this omission is crucial for realizing the full potential of the PRR as a Business Corridor and ensuring smooth regional connectivity.
Thank you for your prompt attention to this critical matter.
Sincerely,
@nitin_gadkari@ShobhaBJP@hd_kumaraswamy@DKShivakumar@STSomashekarMLA@Captain_Mani72@hrsrajanna@NHAI_Official
@CMofKarnataka 80% ನೀರು,ಒಳಚರಂಡಿ,ವಿದ್ಯುತ್ ಕಾಮಗಾರಿಗಳು ಸಂಪೂರ್ಣವಾಗಿ ಪೂರ್ಣಗೊಂಡಿದ್ದರೆ,ಹೈಡ್ರ���ಫ್ಲೋ ಟೆಸ್ಟ್ಗಳನ್ನು ಮಾಡಿ ಯಾವುದೇ ಕೊರತೆಗಳಿಲ್ಲದೆ ಇರುವುದನ್ನು ಖಚಿತಪಡಿಸಿಕೊಂಡು ಡಾಂಬರು ಹಾಕಲು 2 ವರ್ಷ ಬೇಕಾ?6 ಬ್ಲಾಕ್ಗಳಿಗೆ 1 ಟೆಂಡರ್?6 ಟೆಂಡರ್ 6 ಏಜೆನ್ಸಿಗಳಿಂದ ಕಾಮಗಾರಿ ಮಾಡಿಸಿದರೆ 6 ತಿಂಗಳ ಅವಧಿಯೊಳಗೆ ಪೂರ್ಣಗೊಳಿಸಬಹುದು
@CMofKarnataka BDA claims 80% work in #NadaprabhuKempegowdaLayout is done, asphalting of 3 blocks almost done.Yet,remaining 6 blocks will take 2 more years as per tender!?Why not 6 separate tenders?Tarring could be done in 3-4 months with multiple agencies working simultaneously?
BDA: 20/30 ಅಳತೆಯ ನಿವೇಶನದಾರರು ಮೂಲಸೌಕರ್ಯ ಕಲ್ಪಿಸಿದರು ಮೂಲಸೌಕರ್ಯ ಇಲ್ಲ ಎಂದು ಅಪಪ್ರಚಾರ ಮಾಡುತ್ತಿದ್ದಾರೆ,
Site owners: ಶೇ. 80ರ ಷ್ಟು ಪ್ರಗತಿಯನ್ನು ಸಾಧಿಸಲಾಗಿದೆ ಎಂದು ಹೇಳಿಕೊಳ್ಳುವ ಪ್ರಾಧಿಕಾರ 6 ಬ್ಲಾಕ್ಗಳಲ್ಲಿ ಏಕಕಾಲದಲ್ಲಿ ಡಾಂಬರೀಕರಣ 6 ತಿಂಗಳಲ್ಲಿ ಪೂರ್ಣಗೊಳಿಸಿ ತೋರಿಸಿ,ಅಪಪ್ರಚಾರ ಕೊನೆಗಾಣಿಸಿ.
@CMofKarnataka
@CMofKarnataka@DKShivakumar@mlanaharis
Kommaghatta substation tender was floated in Aug 2021,May 2022 work started but it is still nt functional.
Electrical network not done across layout.
When will power supply plug-&-play facility be available instead temporary electricity?
@CMofKarnataka@DKShivakumar@mlanaharis
When will #NadaprabhuKempegowdaLayout
blocks 1-4, 8, 9 asphalting tenders be even floated?
1 year back, asphalting started in blocks 7, 6, 5 but tar work going on and on.
When will even electricity be provided across the layout??
@CMofKarnataka@DKShivakumar@mlanaharis
Due to non-motorable roads in Blocks 1-4, 8,9 houses are not coming up much,on top of that waste is being dumped in #NadaprabhuKempegowdaLayout, including building debris,animal,city & now medical wastes. When will the layout be liveable?
@CMofKarnataka
Good decision; but in the past,BDA used to allocate all sites to public; now 60:40 compensation,in NPKL out of 28k sites compensation site is more than 15k that can be vacant & house construction is only for 10k public allotment?
Bring every site under same rule.
@CMofKarnataka@DKShivakumar@mlanaharis
9th year only 1 substation in layout, which has been in progress for 3 years but is not even operational yet.
Substation is also showpiece as GLSR, STP, which does not serve us since there is no electrical network built across layout.
@CMofKarnataka@DKShivakumar@mlanaharis Except for block 7, all other 8 blocks don't have motorable roads;
Motorable road work is crawling in block 6 & at a standstill in block 5, and for blocks 1, 2, 3, 4, 8 & 9, there is no tender yet.
BDA electrical network also not done!!
@CMofKarnataka
Motorable road formation 80% complete in block 7, just started in 6, yet to start in 5 & for 1-4, 8-9 blocks no tender yet. No electrical network temporary electricity from nearby BESCOM point.
Work done by BDA is not helping the siteowner to start construction.
@CMofKarnataka@DKShivakumar@mlanaharis
Beginning of 9th years of allotment in #NadaprabhuKempegowdaLayout & end of Petetion Committee final 14-month deadline only block 7 has motorable road,Mud roads in 8 blocks;in 9 blocks No electricity,Halfdone UgD & water supply works.
@mlanaharis Looks like for BDA, block 7 is only NPKL.
3 soil stabilization seperate tenders were called around 8 months ago for block 5,6,7 & only in block 7 80 % work can be seen, in block 6 its CRAWLING,in block 5 work YET TO START. For blocks 1-4,8-9 NO TAR TENDER.
@mlanaharis@lkatheeq ಸರ್, ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ಬಡಾವಣೆಯ ಪ್ರಗತಿ ಪರಿಶೀಲನಾ ಸಭೆಯನ್ನು ನಿವೇಶನ ಮಾಲೀಕರೊಂದಿಗೆ ಸೇರಿ 1,2,3,4,8,9 ಬ್ಲಾಕ್ಗೆ ಭೇಟಿ ನೀಡುವ ಮುಖಾಂತರ ಶೀ��್ರದಲ್ಲಿ ಮಾಡಬೇಕಾಗಿ ವಿನಂತಿ.
@CMofKarnataka @DKShivakumar @BDACommissioner
As Chairman of Bengaluru Business Corridor #BBC (PRR) held another meeting yesterday with BDA Chairman @mlanaharis BDA Commissioner and other officers
We have kick-started finalisation of awards to pay the land owners of the 2400 acres land for the PRR of 73 KMs @DKShivakumar