Nasrapur Murder Case Verdict: Kamble Sentenced to Death by the Pune Court Rarest of Rare Exception Explained
Pune court sentences Bhimrao Kamble to death in the Nasrapur rape-murder case. FIR 169/2026, POCSO fast-track trial, charges & appeal explained.
Electrical Cables stocks have given a strong weekly
closing, signaling renewed strength in the sector. ⚡📈
Many stocks from this space have started showing impressive momentum and are witnessing strong buying interest.
Keep a close watch on the following stocks for potential opportunities 👀🔥
IdeaForge Technologies | Q4FY26 Financial Results
Turnaround Year
- FY26 marked a strong comeback to profitability
- Revenue jumped to ₹2,261 Mn (vs ₹1,612 Mn)
- EBITDA turned positive (₹271 Mn vs loss earlier) 👏
- PAT also turned positive in Q4
Q4 Performance (Sharp Spike)
- Revenue surged to ₹1,410 Mn (huge jump vs previous quarters) 🔥
- Gross margin expanded significantly (~67% in Q4)
- EBITDA & PAT turned strongly positive
Order Book & Execution
- ₹5,300 Mn order inflow in FY26 (highest ever)
- Executed ~40% of orders in Q4 alone
- Closing order book ~₹3,142 Mn 🔥
Business Mix
- Defence-led (69% FY26 / 86% in Q4) → core growth driver
- Civil segment smaller but growing
Risks:
Drone/defense space tends to be order-based, so quarters can swing wildly.
Waaree Energies Plans ₹30,000 Cr Capex Over 2 Years; Q4 FY26 PAT Up 71% YoY to ₹1,061 Cr
Capex Breakdown (₹30,000 Cr over FY27–FY28)
₹11,000 crore: Setting up 10 GW each of cell and ingot-wafer manufacturing capacity
₹10,000 crore: Battery Energy Storage Systems (BESS) — Phase 1 live this year, Phase 2 next year
₹3,900 crore: Solar glass manufacturing
₹3,000 crore: Power infrastructure arm — building integrated ecosystem of connectivity, land, T&D infrastructure for end-to-end customer solutions
Remaining: other related segments
Already deployed ~₹4,000 crore in FY26 across various segments
Current Manufacturing Capacity
Module manufacturing: 26 GW
Cell capacity: 5.4 GW
Expansion targets: 10 GW cell + 10 GW ingot-wafer — massive vertical integration push
Q4 FY26 Results
Net Profit: ₹1,061 crore, up 71% YoY (vs ₹619 crore in Q4 FY25)
Stock reaction: declined 10.65% on Thursday, closing at ₹3,129 on NSE (previous close ₹3,501.95)
Market likely pricing in execution risk and capex intensity of the aggressive expansion plan
Key Monitorables
BESS Phase 1 commissioning timeline — this year
Cell and ingot-wafer capacity ramp — execution across ₹11,000 crore deployment
Solar glass plant progress — import substitution play given heavy China dependence
Whether PAT growth sustains given heavy reinvestment cycle ahead
Even the Strongest Disappointed
5-Year Returns That Shock the Market
Bookmark the list🔖
WHIRLPOOL -63.9%🔻
BATAINDI -55.5%🔻
GLAND -36.3%🔻
HONAUT -34.0%🔻
GUJGASLTD -31.8%🔻
BERGEPAINT -31.1%🔻
PGHH−25.0%🔻
TCS-21.6%🔻
JUBLFOOD-21.3%🔻
DABUR -17.9%🔻
Any other on your radar comment below 👇
#CNXSMALLCAP 📊
As expected, Nifty Smallcap 100 is showing a solid reversal from trendline support 🔄
A Hammer candlestick is forming indicating strong buying interest at lower levels 🟢
This setup could evolve into a W pattern (double bottom), hinting at a potential bullish move 📈
Gradual upside looks likely from here.
👀 Keep monitoring smallcaps may be gearing up for a steady move higher.
BREAKING: Google just dropped a hidden NotebookLM feature that converts any research paper into a full university lecture.
Examples. Analogies. Live Q&A. All generated in 60 seconds.
Here's how to unlock it 👇
My List of High Potential Companies from each sector in this Crash 🔥
Save it for later 🔖
Aerospace & Defence 🪖
Mazagon Dock
Apollo Micro Sys
AXISCADES Tech.
Unimech Aero.
Jaykay Enter.
Wire & Cable 🚡
Polycab India
KEI Industries
Apar Inds.
R R Kabel
Universal Cables
Universal Cables
Advait Energy
Power ⚡️
A B B
Siemens
Waaree Energies
Transrail Light
Quality Power El
Avalon Tech
Skipper
Auto 🚘
Maruti Suzuki
M & M
Ashok Leyland
Eicher Motors
TVS
SML Mahindra
VST Tillers Tractors
Auto Ancillary ⚙️
Lumax auto tech
Banco
Pricol
Fiem Industries
SJS Enterprises
Jamna Auto Inds.
Lumax Industries
Sandhar Tech
Carraro India
Frontier Springs
Rico Auto Inds
RACL Geartech
Bharat Seats
Financials 🏦
Bank of Baroda
City union bank
Muthoot Finance
Aditya Birla Cap
L&T Finance Ltd
M & M Fin. Serv.
IIFL Finance
CreditAcc. Gram.
Fedbank Financi.
Capital Market 💹
BSE
360 ONE
Nuvama
Healthcare 🏥
Fortis Health.
Narayana Hrudaya
Krishna Institu.
Dr Agarwal's Hea
Healthcare Global
Poly medicure
Yatharth Hospit.
Thyrocare Tech.
Pharma 💊
Jeena Sikho
Marksans Pharma
Akums Drugs
Innova Captab
Senores Pharma.
Chemicals 🧪
Privi Speci.
Sharda Cropchem
NACL Industries
Industrial Products 🧑🔧
HBL Engineering
Elgi Equipments
Gallantt Ispat L
Usha Martin
Shaily Engineer.
Garware Hi Tech
Time Technoplast
Subros
Swaraj Engines
Raghav Product.
Sambhv Steel
Nelcast
Ratnaveer Precis
Industrial Manufacturing 🏭
Kaynes Tech
Syrma SGS Tech.
Hind Rectifiers
Kilburn Engg.
Spectrum Electr.
Pennar Industrie
DEE Development
ICE Make Refrig.
Macpower CNC
IT 🧑💻
Persistent Systems
Coforge
PB Fintech
One 97
Inventurus Knowl
Netweb Technol.
Affle 3i
Sagility
Intellect Design
Black Box
Rategain Travel
Zaggle Prepaid
Rashi Peripheral
FMCG 😋
Radico Khaitan
Godfrey Phillips
Gillette India
L T Foods
Allied Blenders
Tilaknagar Inds.
Manorama Indust.
Gokul Agro
Vadilal Inds.
Parag Milk Foods
Vintage Coffee
Consumer Durable 🌬️
Voltas
PG Electroplast
Ethos
Timex Group
Hotel 🏨
Chalet hotels
Lemon tree hotel
Samhi hotels
Retail 🛒
V2 Retail
Aditya Vision
Entero Healthcare
Construction 🚧
Techno Elec.Engg
Cemindia Project
Interarch Build.
Vikran Engg.
M & B Engineer.
Garuda Cons
Realty 🏙️
Phoenix Mills
Anant Raj
EFC
AWFIS Space
Cement 🧱
UltraTech Cem.
Ambuja Cements
Nuvoco Vistas
Mining ⛏️
Lloyds Metals
G M D C
Ashapura Minech.
Metals 🏗️
Tata Steel
Hindustan Copper
Indian Metals
Ports 🚢
Adani Ports
JSW Infra
Others 🧐
Bharti Airtel
Interglobe Aviation
CMS Info Systems
Jaro Institute
Flair writing
Knowledge marine
Tips music
Pondy Oxides
Pearl Global
Follow NOW !
🚨 BREAKING: Iran opens a diplomatic side door in the Hormuz blockade, granting safe passage to Indian vessels. 🇮🇳🇮🇷
Citing a longstanding friendship, Tehran has cleared LPG carriers like the Shivalik to pass.
A massive relief for India's energy security, but a case-by-case approval remains the law of the water. 🚢
@grok verify from official sources only.
🚨 THE WORLD’S #CHIP SUPPLY IS 72 HOURS FROM A TOTAL MELTDOWN. 🚨
AI collapse 🔥🔥
Forget the 2021 chip shortage. We are entering a "Hard Stop" for global tech. 🛑
Samsung and SK Hynix are on MAXIMUM ALERT. The "Life Blood" of the semiconductor world—Helium—is being choked off in the Gulf.
If you own an iPhone, a Tesla, or Nvidia stock, you need to read this immediately. 🧵👇
2/7: The Ghost in the Machine 👻
Most people think chips are just silicon. They’re wrong. You cannot bake a chip without Helium. It is the only gas capable of cooling ultra-precision manufacturing equipment at -268.9°C.
❌ No substitute exists.
❌ No Helium = The machines melt.
3/7: The 48-Hour Warning ⏰
South Korea produces 60% of the world’s memory chips. They are the lungs of the tech industry.
Reports indicate QatarEnergy has declared Force Majeure at Ras Laffan. 🚢
The single largest node in the global helium network has just gone dark.
4/7: The "Invisible" Blockade ⚔️
Iran didn't need to fire a single missile at a factory in Seoul or California.
By making the Strait of Hormuz and the Red Sea "No-Go Zones," they’ve effectively unplugged the global economy.
Shipping times have doubled. Insurance costs are vertical. The supply is vanishing.
5/7: The Domino Effect 📉
Watch how fast this moves:
→ Helium stocks hit zero in 4-8 weeks.
→ Samsung/SK Hynix freeze production.
→ Nvidia cannot ship H100s/B200s.
→ AI data centers stop expanding.
→ The $2 Trillion tech rally vaporizes. 💨
6/7: Why This is Worse Than COVID 😷
In 2021, factories were slow but the pipes were open.
In 2026, the factories are ready, but the raw materials are trapped in a war zone. We aren't just looking at a "delay"—we're looking at a $600 Billion industry grinding to a total halt.
7/7: The Bottom Line 🏁
The AI arms race is currently dependent on a gas that nobody can ship.
We are 30 days away from a "Digital Dark Age" if these shipping lanes don't open.
Keep your eyes on the tankers, not the tickers. 🚢🔥
#Follow me and Save this post
Algorithm will try to bury this post
Government will try to hide the truth
Follow me and retweet
Also comment