@GHMCOnline@SantoshBabuD@Dc_Ghmc Sir,
Inconvenience regretted. Bed was laid on sunday night. It is under curing period. However, steel reinforcement for raft will be started at the earliest.
@thadoori9@BrsBandari@GHMCOnline Sir,
Inconvenience regretted. Work for road and drain is sanctioned and tendered recently. Will be grounded at the earliest.
@Venuforyou@GHMCOnline@CommissionrGHMC@KTRBRS Sir,
Inconvenience regretted. Road will be laid only after laying of all UGD and water pipelines. However, laying of CC road at https://t.co/9AfL1sez2n.1&2 in sai Krishna colony is sent for administrative sanction. Road will be laid once it is sanctioned.
@Praja_Snklpm@GHMCOnline@Dc_Ghmc Sir,
Work delayed due to drinking water pipe line which is obstructing the free flow of SWD. In coordination with HMWS&SB, pipe line was lifted to slab level.
@BplplH@GHMCOnline@Dc_Ghmc@ZC_LBNagar @Nagende38816971 Sir,
Inconvenience regretted. Work is delayed as the water supply pipe line need to be raised to slab level. Previously it was obstructing the free flow of storm water which resulted in water stagnation. 2 days ago, water supply line was raised to slab level by HMWS&SB.