Duronto SF trains are meant to stay Rigid and Non stop..
Now under @AshwiniVaishnaw duronto is just a named train without having its distinct purpose
For him, VB is the premium service, others are just Mail/Express so he'll destroy it in his own ways with new fallacy story✌🏻
🚆 Good News for Passengers of Akola!
For the convenience of passengers, Train No. 12221/12222 Pune–Howrah–Pune Duronto Express (Weekly) will now have a stoppage at Akola Junction (AK) with effect from 28.11.2026.
Akola Stoppage Timings: 📷 12221 Pune–Howrah Duronto Express: 00:38 – 00:40 hrs 📷
#CentralRailway #BhusawalDivision #Akola #DurontoExpress
@Priyankasa94386 Nope,
Typical composition has maxx of
3-7 ACs , 10+ SL, 4 UR, 2SLR
Especially newer LHBfied trains... For eg, Take 22606, 16779 like trains... LHB, long distance but will less than 5 ACs...
3AC requires a Reduction in fare structure.
SL, 2S are dead cheap, but 3A is quite expensive
To increase people usage of AC coaches, Railways has to reduce 3A cost to have Base fare around 350.
You can't even pronounce Jan Shatabdi Properly. You're here to Reject the request.
Go and Analyse the meaning of Janshatabdi before calling it a fantasy 🤡
@AshwiniVaishnaw@GMSRailway
Dear Railway Minister sir
we don't need jan shadapthi etc kind of high fi train
Just give us 5.55 Hour Memu Train , Every 5 hour once sir
Make the Coach with Toilet and comfortable 60 Seater Plan and rest for sitting on floor or toilet
5 am,
10 am
3 pm
8 pm
12 Mid Night
5000 passengers will shift from bus to MEMU without any doubts
@CMOTamilnadu
three chord line
two main line
Can anybody explain this sorcery ?
@RailMinIndia please let us know the instructions you're giving to @DRMKhurdaRoad & @CKP_Division . If you want, please stop coaching services in Odisha. The desperation is quite evident
@OdishaRail
🚨MISSION RAFTAAR OR MISSION SLACK?🐢
12814 Steel Express (Tatanagar–Howrah) is running 46 MINUTES LATE at Kulgachia, still 33 KM away from Santragachi!
Scheduled arrival at Santragachi: 09:40 AM.
Let's look at the reality:
🚆 A triple-line section with 130 km/h capability.
🚆 Just 250 KM between Tatanagar and Howrah.
🚆 Yet the journey takes 4 HOURS 35 MINUTES!
And the most ridiculous part?
JUST 7 KM FROM SANTRAGACHI TO HOWRAH, BUT THE TIMETABLE ALLOWS AN ABSURD 55 MINUTES!
Why? Is this genuinely operational planning, or is excessive slack time being built into the timetable to mask chronic delays?
Instead of improving punctuality, are @kgprail & @serailwaykol normalising delays by padding schedules every year?
Passengers deserve speed, punctuality and accountability — NOT excessive slack disguised as timetables!
@RailMinIndia@AshwiniVaishnaw Ji, is this what MISSION RAFTAAR looks like?
Apparently, trains may run late, timetables may be manipulated to absorb delays, but passengers are expected to lose their precious time without questioning anything!
@CKP_Division
#IndianRailways #MissionRaftaar #LateDivisionKGP #LateZoneSER
It was Pallavan Superfast that was operated between Tiruchchirappalli Chennai got extended to Karaikudi Due to Policial reasons.
Tiruchchirappalli is a city that very close proximity to chenani, shouldn't be punished rather entertained with dedicated train in higher frequencies.
சென்னை - திருச்சி ஒரு dedicated train இல்லை
முதலில் பல்லவன் & ராக்ஃபோர்ட் இருந்தது... இரண்டுமே இப்போ extended
சென்னை மதுரை - வைகை, தேஜாஸ், பாண்டியன்
சென்னை கோவை - இன்டர்சிடி, சதாப்தி, வந்தேபாரத், சேரன், கோவை
என eexclusive trains இருக்கிற மாதிரி திருச்சிக்கும் இருந்திருக்கலாம்
🚨 Indian Railways' passenger traffic is projected to reach a record-breaking 820 crore (8.2 billion) in FY27, surpassing the pre-Covid figure of 808.6 crore recorded in 2019-20. 💥
A small slack system way decades back now became schedule system embedded inside slack😂😭
Instead of improving the controlling, they chose to give hrs & hrs of slack.
Now, Slack became an important reason for poor controlling, poor controlling lead to increased slacks loop
Reel Minister Ashwini Vaishnaw is claiming that Indian Railways' 77% punctuality has beaten Germany's 72%...
He conveniently hides what the official CAG report revealed:
Germany counts a train late if it is delayed by just 5 minutes at any station, whereas Indian Railways gives a 15-minute grace window and checks punctuality ONLY at the final destination station...
A train can run 3 hours late across 15 stations in UP and Bihar, and if it covers up using 2 hours of artificial "slack time" before the last station, the minister calls it on time.
Reel Minister Ashwini Vaishnaw is claiming that Indian Railways' 77% punctuality has beaten Germany's 72%...
He conveniently hides what the official CAG report revealed:
Germany counts a train late if it is delayed by just 5 minutes at any station, whereas Indian Railways gives a 15-minute grace window and checks punctuality ONLY at the final destination station...
A train can run 3 hours late across 15 stations in UP and Bihar, and if it covers up using 2 hours of artificial "slack time" before the last station, the minister calls it on time.
Just Bcoz a train pass thru a route, Doesn't mean the train is for The route itself.
For ours, the train is intended to connect delhi.
What if Andra , MP claim it is their train and ask for more stops, Reroute?
If they started filling it, then how will you get seats to Delhi?
@TPJCLDemands "Tirukkural is a passing train but TNSK is a dedicated train for Chordline."
what is the logic ??
Anyway, I am not getting into this debate. I have been petitioning for this for many years and Southern Railways has not done anything about it. So you need not worry much 😀
This is because of the quota system where it'll favour the dedicated section I mean Cape to mdu.
After that any station including chennai becomes secondary for tirukkural. That's what i call purpose of a train. And yes any stoppage after madurai slowly becomes irrelevant.
Not possible means leave it as it is.
Tirukkural? Why not to request it via Mainline? Will you agree with this?
Check the patron of TNSK inside Chordline... And Check tirukkural if it has a stoppage😂
Tirukkural is a passing train but TNSK is a dedicated train for Chordline.
@TPJCLDemands Getting a new train in HDN route from Chennai all the way to New Delhi is next to impossible.
There is anyway Thirukkural which is serving chordline on same slot for other 2 days. It is all about equitable redestribution of available resource.
@ravishankervg The train 16807/08 Passes via Cuddalore, having a stoppage as well.
It has a stoppage at tindivanam as wll.
Puducherry has a morning dedicated train to Chennai.
It's time to repeat my decade long plea to @AshwiniVaishnaw Ji through @GMSRailway , @DrmChennai , @drmmadurai , @DRMTPJ
To route 12651/12652 TNSK express via Main line so that Delta people will get direct connection to National Capital and also extra train to Chennai for 2 more days of week. It is just a simple change which will benefit everyone that can be done by minor change in Time Table within jurisdiction of Southern Railway.
@sgsuryah , @DrLMurugan , @NainarBJP Please consider this Plea
@KRD_forum@TANDRUA1963 please RT🙏🙏
Not a hate....but..
In today's era stoppage removal is important more than addition of stops
If the pace of requesting stops continue, within a decade we'll see all Exp, SF having a stop every 20 mins.
Are trains are empty enough so to provide more stop so to get filled?
Respectfully, this comparison is incomplete. One-day reserved ticket data from ChartMitra cannot determine the overall passenger importance of a railway station.
Let’s look at the official Indian Railways Station Categorisation Data (2023–24):
📍 #Nalgonda (Telangana) – ₹15.08 Cr | NSG-4
📍 #Miryalaguda (Telangana) – ₹7.93 Cr | NSG-5
📍 #Piduguralla (AP) – ₹7.21 Cr | NSG-5
Above stations record roughly 5 to 5.5 lakh passengers annually. Nalgonda is an NSG-4 station generating over ₹15 Cr, while Miryalaguda generates higher revenue than Piduguralla despite both being NSG-5 stations.
Yet, Piduguralla gets prioritised while Miryalaguda continues to be ignored. A few genuine questions:
1️⃣ Can one-day, unofficial ChartMitra reserved-ticket data accurately represent a station's true passenger demand?
2️⃣ Where is the unreserved passenger data? Have UTS bookings, daily commuters, and total footfall been factored in?
3️⃣ Passengers closer to Hyderabad heavily rely on unreserved tickets over advance reservations. Doesn't excluding this segment distort the real picture?
4️⃣ Why aren't official annual footfall, total revenue, and NSG categorisation used as the primary benchmarks for granting stoppages?
5️⃣ Both #Nalgonda and #Miryalaguda are key #Telangana hubs on the #Bibinagar–#Guntur route. Stoppages must be decided on actual demand and operational feasibility—not selectively.
#Telangana is already underserved in new rail lines and train allocations. Now, even trains passing directly through our major stations are skipping halts. We are not opposing stoppages in AP; we are simply asking for fair and equal consideration for Telangana stations.
@SCRailwayIndia@RailMinIndia@drmsecunderabad@drmgnt please immediately provide a stoppage at Miryalaguda for 12795/12796 (BZA–LPI Intercity Express), 17625/6 KCG-RAL-VKB Delta Express and review all trains bypassing Nalgonda and Miryalaguda in Telangana.
@TGRailusers So instead of Spoiling that non stop service that will run with a pride post doubling... With / without those roadside stop lpi ice gotta be full...
So if new ice, it's gotta be new seats for everyone without competiting with existing seats.
Time for us to think constructive.