LABRATS & BJC joint statement on today's announcement.
LABRATS International, which has campaigned for greater transparency over Britain's nuclear testing programme, access to historical medical records, recognition of the impact on veterans and their descendants, and an independent process capable of establishing the truth and delivering justice, has welcomed the Government's commitment to set up an independent panel, but insist their quest for justice is not over.
Broudie Jackson Canter, the campaign’s lawyers, say they will now urgently review the detail of today’s announcement and will insist that the protections of Hillsborough Law must apply including parity of representation.
@old_doozer Yep, which is why objected so strongly to universal additions to bills.
This was my beat as a young cop, i know how hard it was for ppl. They should never have been made to pay.
8.5 more yrs and we'll start to see reductions in bills when the legacy FiTs from 2010 scheme finally come to an end.
Great scheme to start an industry and development of products, remember that when UK started its scheme on 1/4/ 2010 we were the 27 of the EU states and 67th Country globally to start a FiT scheme.
It wasn't just a UK thing despite many wanting to blame @Ed_Miliband
Some say it was too generous, but with 2.5 million solar homes, it certainly worked.
Never a big fan myself, yes, it drove demand but the universal contribution meant ppl who couldn't afford the beans on their toast have been contributing as well, through their energy bills.
I persuaded my parents to install PV 15 yrs ago, 2026 was the highest yield so far! Obviously, there will be some degradation in the panels, but this is insignificant compared to the seasonal variability of sunshine, their FIT payment is now 77p/kWh generation😮
8.5 more yrs and we'll start to see reductions in bills when the legacy FiTs from 2010 scheme finally come to an end.
Great scheme to start an industry and development of products, remember that when UK started its scheme on 1/4/ 2010 we were the 27 of the EU states and 67th Country globally to start a FiT scheme.
It wasn't just a UK thing despite many wanting to blame @Ed_Miliband
Some say it was too generous, but with 2.5 million solar homes, it certainly worked.
Never a big fan myself, yes, it drove demand but the universal contribution meant ppl who couldn't afford the beans on their toast have been contributing as well, through their energy bills.
Looking forward to the author's detailed report on both extraction of fossils, what happens when they are burnt and then the decommissioning process and associated costs.
Im here all night
Almost all the reinforced concrete foundations of wind turbines ever built — many of them now weighing a thousand tonnes each — are being left in the ground for good.
It's another legacy of our world in transition. Hundreds of thousands of turbines and billions of solar panels now occupy huge areas of once-open landscapes everywhere. The basic flaw lies in the scale of a vast structural overbuild in an effort to capture intermittent energy from wind and sunlight.
But no matter how many turbines and panels are built and spread across the world, they can never match or replace the dense baseload power of traditional hydrocarbon fuels.
Over the decades, these massive blocks can disrupt deep-soil hydrology and remain as permanent industrial junk just below the surface of rural landscapes. The concrete base of a typical early 2–3 MW turbine weighs 400 to 800 tonnes. Foundations for modern 5 MW+ turbines exceed 1,000 tonnes.
The number reaching the end of their working lives will soon surpass tens of thousands, installed at a staggering cost across the globe.
While fluids like gearbox oil and hydraulic lubricants are drained when towers are dismantled, the subterranean concrete itself is rarely touched. In most jurisdictions, decommissioning rules only require clearing the foundation to a depth of 1 to 1.5 metres below the surface.
The financial reality is murky. Bank guarantees or bonds (often around $100,000 per turbine) fall well short of the removal and restoration costs of $200,000 to $400,000 per unit. Even as states like NSW move to tighten rules for future disposals, thousands of existing turbines sit under older permits. Operators can simply walk away, leaving landowners holding the bag.
We're seeing this play out at Victoria's Codrington wind farm, which is due to close in 2027. Operators plan to remove only the top 1.5-metre pedestal, leaving roughly 7,000 tonnes of subterranean steel and concrete permanently buried — a precedent triggering fierce backlash from local communities and MPs who argue it violates the original promise to restore the land.
No one wants to pay to excavate these concrete monoliths once the turbines stop spinning. But what is even worse, no one appears to care.
FFS please do not tell her what's happening in Texas and California which are as advanced as most Nations on their own, or the dozen or so countries that are very close to 100% running on renewables.
It will blow her tiny mind
The failure of COP to reach agreement is good news.
The sane industrialised countries realise there is no energy security - and no industry or economic success - without fossil fuels.
Meanwhile, our lunatic British government puts its faith in windmills and so we have the highest electricity prices in the world.
And no industry.
@Miatsf
@cameowilts@aDissentient The opposite is true.
Smaller systems are the most expensive price/kwh installed
I only have 19 yrs in this field so happy to be schooled by those with more experience or knowledge
No they're not.
We've got ASHPs in houses dating way back.
My own is solid walls, earth foundations, dates back 1580 and heat pump ready.
Hoping to happen next yr, big project in ours due to the stupidly small inefficient radiators put in with the oil boiler 50 yrs ago, so waiting for the summer to get started