It’s so easy to identify someone who has never constructed a permanent house. Wekesa I can tell you for free 10000% without at least 6 million+ forget about such a house, Let’s do the maths for the structure up to plastering based on what we can see here.
1. Foundation & slab: KSh 800k–1.2M (this depends on the area it can shoot up based on topography)
2. Stones (KSh 90+ each): At least KSh 700k+
3. Cement, sand & ballast: At least KSh 800k–1.3M
4. Labour: At least Ksh 700k
5. Roof structure: KSh 400k–700k
6. Decra roofing (KSh 1,300+ per sheet): KSh 700k–1.2M
7. Doors & windows: KSh 500k–900k.
8. Plumbing & electricals (first fix): KSh 200k–500k
9. Internal & external plastering: At keast KSh 400k
Total here is: Easily KSh 5.2M+ excluding finishing!
A house of that size and finish costing KSh 3.3M is either incomplete, heavily subsidised, or key costs have been omitted. if you doubt me bring the contact details of the owner of the house we physically calculate the actual true cost of that house, my dm is open. Alternatively build the same exact house in Bungoma for Ksh 3.3m and if you do, please come for 1 million as a reward. Game on you.
CCTV footage shows several girls arranging mattresses before setting them on fire. A student (Survivor) who was trapped inside a cubicle witnessed the incident and later identified the suspects. Investigators say the victims could have escaped had the door not been locked from the outside by the arsonists.💔
Musalia Mudavadi- "Surely we cannot be so stupid to bring Ebola to Kenya".
Despite the so-called measures, isn't bringing Ebola patients to the country for quarantine bringing Ebola to Kenya? Ama Sisi ndio wendawazimu?
Highly recommend letting people know you're capable of madness from time to time. Especially if you're a quiet, soft spoken person. Disrespect sometimes needs to be met with disrespect.. let mfers know you can go from 0-100 real quick.