@PeterDiamandis Peter ,
There was a land based SMR in Antarctica in the 1960s. It was likely converted from marine based to power McMurdo station. It generated 1.8 megawatts and desalinated the station water supply. It had some issues and was demobilized in 1972.
@GarbageLiberty@elonmusk@farzyness@SawyerMerritt 1)Intangible drilling cost deduction =$1.3 billion annually
2) Permits deduction based on production ~$1.29 billion annually
These are not credits.