I just answered 3 questions and I'm getting paid in tokenized stocks by @stockfaucetRH.
No broker. No deposit. Just $NVDA $TSLA $AAPL $AMZN dripping on-chain.
$STF CA: 0xe9202e91a664fcfc2ee911f617c12b8f64b12f2f
Proof: SF-2445Y4
https://t.co/BXWFVfchgQ https://t.co/oXtErurHRp
The agent economy on Robinhood Chain, powered by @virtuals_io, just passed $200M in agent volume, 5,600+ agents launched, and $2.7M raised for builders.
Building agents on Robinhood Chain? Learn more below.
Building great products takes consistent execution.
Glad to be contributing to @NezoraAi, helping develop a Telegram-native AI platform on Robinhood Chain.
The project is being built in public, and the repository is open for everyone to explore.
GitHub: https://t.co/sWNyiYL7IY
AI agents need a workspace, not just a chat window.
Nezora lets you deploy AI workspaces on Robinhood Chain with Telegram integration, private account records, and approval before every onchain action.
Build. Review. Approve.
Your agent does the work. You stay in control.
https://t.co/Vs9S7qrRXJ
@0xDeployer If the account owner couldn't log in but the attacker allegedly still could, that's a serious issue. Hope @0xDeployer and @nikitabier can get to the bottom of this.
Watching everything unfold around bankrbot has been surreal.
First, the official X account gets locked due to "unusual activity." Then screenshots start circulating showing large BNKR transfers split across multiple wallets, followed by heavy selling that sent the chart into a sharp drop.
Maybe these events are unrelated. Maybe they're not. That's exactly why the community needs clear communication instead of speculation.
In crypto, silence creates more uncertainty than bad news. People can handle difficult updates, but they need transparency to understand what's happening.
The team has built a strong community over the past months, and that community deserves a detailed explanation of:
• What happened with the X account.
• Whether the recent wallet activity was planned or unauthorized.
• What actions are being taken to secure the project moving forward.
I'm not posting this to spread FUD. I'm posting it because trust is one of the most valuable assets any project has, and trust comes from open communication.
Hoping to see an official statement soon from @0xDeployer and bankrbot. The sooner everyone has the facts, the sooner unnecessary speculation can end.
The market moves fast.
Yesterday, everyone was watching Robinhood Chain.
Today, attention is flowing to Base.
Tomorrow? Nobody knows.
In crypto, narratives change overnight.
The people who survive aren't the ones who marry a chain.
They're the ones who understand where liquidity, attention, and builders are moving.
Spent some time exploring the Robinhood Chain ecosystem today.
It's still early, which means things are rough around the edges and that's usually where the fun is.
Decided to swap a bit of ETH and take a chance on a few low-cap tokens. Nothing life-changing, just enough to understand the user experience and see what's being built.
Every ecosystem starts the same way:
A handful of builders, curious users, and a lot of experimentation.
Most of these tokens probably won't be around a year from now. That's the reality of being early.
But every major ecosystem we know today once looked exactly like this.
Sometimes the most valuable thing isn't the trade itself.
It's getting a front-row seat to watch a new ecosystem take shape in real time.
@RobinhoodApp
One of the most interesting things Robinhood has done recently isn't adding another financial product—it's turning the future of AI into a market.
Today, people can place predictions on which company will have the top-ranked LLM by December 31, 2026, with Claude currently leading, followed by ChatGPT, Gemini, Grok, and LLaMA.
Think about that for a moment.
We're no longer just discussing AI on podcasts, blogs, or conference stages. We're assigning probabilities to it in real time.
Prediction markets are fascinating because they aggregate collective beliefs. Every price represents what thousands of participants think the future will look like. Today, the market believes Anthropic has the highest probability of leading the AI race by the end of 2026.
Of course, AI moves incredibly fast. A year ago, many people would have made very different predictions. By the end of next year, we may be talking about models that haven't even been announced yet.
But that's what makes this so compelling.
Robinhood isn't just asking, "Who will build the best AI?"
It's creating a mechanism for people to express their conviction about the future.
In many ways, this feels like the intersection of three major trends:
Artificial Intelligence
Prediction Markets
Financial Infrastructure
And we're still at the beginning.
Whether Claude, ChatGPT, Gemini, or an entirely new entrant comes out on top, one thing is becoming increasingly clear:
The future of technology is no longer something we simply talk about.
It's something we can measure, price, and participate in.
@RobinhoodApp
https://t.co/JJ5ANVjedv