@redbirdracing @BrentM_SpaceX Better than the original GE packages for sure. The Dynamis DT35 package is the King though. We can rig that up in less than 12hrs with a few guys and hand tools.
@redbirdracing @BrentM_SpaceX Itโs 3 X Cat Solar SMT-130s. Theyโre about 16 megawatts each. We have a bunch of 2500s in the fleet, just mainly doing frac work.