@silver207141 IF, these higher nominal interest rates cause the economy, and government budgets the harm I think will occur, and the government forces interest rates lower, precious metals will do well.
Until then, trying time for the metals trade
watch for gold to stabilize somewhere in this mess.
that will represent thinking forward to either hedge against the end of the world or the forthcoming fed policy response.
may not be today, but when gold steadies as indexes keep falling, we may have our launch pad...
Monday was used as pure exit liquidity.
It’s not like I expected the Jensen return to fix anything since the market broke way before the Jensen resignation came out…. but for that bounce to be completely faded in 2 days shows how weak this market is!
This is great @LovedropV
I will just add. Yes 60% of the float traded in 3 days.
And just looking back at my notes from the Cantor Conference.
TED said at Cantor.
“The only reason we had to separate the LOI for phase 1 and the LOI for phase 2 was due to the Air Permit”
—Ted Warner CFO $NUAI
Guess what might be coming this week. The Air Permits for phase two which means NUAI would have 757MW available for a lease.
That’s 3-4X if that happens.
What’s in your Wallet!
$NUAI
equities are trading like there's going to be war escalation this weekend or something its just straight down, ive seen crypto do this a lot but rare that equities are just nonstop like this
$NUAI is sitting on a multibillion-dollar asset that the market hasn’t even begun to price in.
Here’s the math at $1.4M/MW in annual rent:
Phase 1 (207 MW):
→ $290M annual rent
→ $4.1B asset value at a 7% cap rate
At 757 MW total:
→ $1.06B annual rent
→ $15.1B asset value at a 7% cap rate
These valuations assume rent approximates NOI.
If tenants fund the modular data centers, NUAI avoids billions in construction costs while collecting recurring rent.
The real bull case? Generating massive cash flow without massive capital investment.
And 757 MW isn’t even the full 1.4 GW campus potential.
The future is bright my friends.
Still holding $NUAI calls. One idea is to wait for a P1+P2 signing, then aggressively buy any dip on a dilution announcement to finance those phases.
Also bought some commons today.
Considering my position very carefully. Hopefully this dilution was necessary to satisfy some deal terms and that deal will arrive before the end of November, if not this company was a waste of everyones time and money.
Texas just reopened data center permitting.
Here is how it plays out for $NUAI .
What happened:
The state regulator, TCEQ, says it has "resumed its normal permit review process."
On Monday it issued a new air permit for SpaceX's $SPCX gas-powered data center.
The freeze was not expected to lift until December 10.
Why it matters for $NUAI:
Phase 1 is 207MW with power already contracted. The lease is in advanced negotiation.
Phase 2 is about 550MW of on-site gas generation. It needs a state air permit.
That permit was stuck behind the freeze.
On last week's call, management said they anticipate approval by year end.
The letter of intent already covers both phases with the same tenant.
How it plays out:
1. Phase 1 lease signs.
2. The Phase 2 air permit is issued.
3. Phase 2 can move to a lease.
The clock:
The new governor takes office January 19. She has promised to pause approvals until new laws pass.
A permit issued before then is in hand. A permit still pending is not.
What is it worth?
Management was asked if the deal would look like Riot's powered land lease. "The short answer is yes."
$Riot signed 910MW on that structure. The tenant builds. The landlord collects.
On those terms, Phase 1 alone: $8 to $9 a share.
Phase 2 carries 2.5 times the power.
Same value per MW puts Phase 2 at $20 or more on top.
Both phases signed: roughly $28 to $31 a share.
$NUAI
BREAKING NEWS.
Texas regulators are resuming environmental permits for data centers.
https://t.co/DX4uwKu8pb
Whats the only thing blocking NUAI P2? TCEQ Air permit.
You've been warned. 🔥
$IREN 🚨 A WARNING TO THOSE BLINDLY FOLLOWING THE IREN BULLS.
Whenever you see someone starting a post with “What the market doesn’t understand about IREN,” you should immediately question how much that person actually understands about investing.
The arrogance of some of these young, inexperienced bulls is astonishing. They genuinely believe the market is stupid and that they’ve discovered something Wall Street simply cannot see.
The market isn’t stupid. It understands IREN’s potential perfectly well. It also understands the risks.
As I’ve repeatedly pointed out throughout most of 2025, and received an incredible amount of hate for, IREN’s biggest problem has never been its assets or the demand for AI infrastructure.
It’s management, corporate governance, capital allocation and the complete lack of alignment between the two CEOs and ordinary shareholders.
IREN has incredible assets, enormous ambitions and an enormous need for capital. Yet the brothers seem determined to run this publicly listed company like their own private playground.
The fact that Mike Alfred sits on the board, and that this same board approved such an outrageous RSU package for the two CEOs, tells you just how questionable its priorities are.
How can a relatively young company, so heavily dependent on investor confidence and external capital, justify a compensation structure that creates such an extreme disconnect between management and shareholders?
The brothers should withdraw their RSU packages, sell the private jet and start acting like executives of a publicly listed company rather than owners of their own little kingdom.
And as Umbissam has correctly pointed out, IREN needs to aggressively pursue the colocation/landlord model across its sites.
Stop insisting on owning and financing every GPU while taking on enormous capital requirements and execution risks.
IREN has something incredibly valuable: land, power and datacenter infrastructure.
Monetize those assets through long-term leases with creditworthy tenants. Let customers finance their own GPUs, reduce IREN’s capital burden and unlock the potential equity premium that infrastructure landlords can command.
A hybrid strategy with a much larger colocation component could create substantial shareholder value without constantly requiring billions in additional financing.
Instead, management seems obsessed with building the biggest possible empire.
And that’s the fundamental problem I’ve been warning about for so long.
Building a $50B or $100B company means absolutely nothing if the financing, dilution and management compensation leave existing shareholders with a fraction of the value created.
Just because Elon Musk can get away with certain things doesn’t mean the Roberts brothers can.
IREN has great assets and enormous potential, but it also has a management team and board that desperately need to rethink their priorities.
The market understands IREN. The question is whether IREN’s management understands the market.
And perhaps more importantly:
Will they ever understand that their job is to maximize shareholder value, not simply build the biggest empire possible?