Technical Director, TheAMLab | Manufacturing & Industrial Systems | Aerospace, Automotive, Defence | India, China & GCC.
Making industry work at scale.
I industrialise products in plants. Empty floor to a line that holds rate, even when you sleep.
Cars, powertrain, precision machining, fabrication. Also the investment decision behind the plant: who gets the factory, and whether the supplier base can actually run it.
What you will see here: NPI, machines, tooling, fixtures, robots and automation, vendors, first-article problems, and why a cell that ran on Tuesday dies on Friday.
Written for manufacturing engineers and people who care how factories and products get built.
Just so you know.
For me, the biggest issue is PM becoming a schedule-compliance exercise instead of checking whether the machine is actually ready for production. Software can help by connecting PM history, machine condition, operator observations and shift handover, so the team can act before it becomes a production problem.
The setup sheet is beautifully detailed.
The one dimension the next shift needs is in someone's head.
Knowledge transfer: still mostly human cloud storage.
Treating a supplier's first quote as proof of local capability can cost you the second order.
The price may work on one batch.
Ask what changes when demand repeats: who can replenish the material, replace worn tooling, and hold the same process without the launch team beside them.
A quote is not a supply chain.
The material is paid for, the part is halfway through machining, and the invoice is waiting for inspection to finish its character arc.
Working capital has excellent timing.
Aerospace suppliers do not need another machine quote as much as they need a credible qualification path.
Capacity without customer approval is floor space, not supply.
Localising a component without local repair capability is only half a supply chain.
A failed spindle should not turn into an international shipping problem.