Exciting news: DeepSeek-V4.1-Flash-20261017 (Max) by @deepseek_ai is now the #1 open model in Code Arena: WebDev, surpassing Kimi K3 (Max) at 10x lower cost!
Highlights:
- #1 open model, ahead of Kimi K3 (Max)
- #12 overall with 1670 pts, ahead of Claude Opus 5 (High) and within ~10 pts of GPT-6 Sol (Max)
- Shifts the Pareto frontier at $0.3/$1.2 per million input/output tokens
- +52 pts vs. the previous DeepSeek-V4.1-Flash-20260910
Congrats to the @deepseek_ai team on another strong contribution to the open source ecosystem!
The part I'd push on is "within an agent stack". Building long-running AI employees makes "stuff that works" pretty literal for me.
It comes down to unglamorous things: can the task context survive moving from one tool to the next, or does a person end up re-explaining everything? Where's the permission line, and who can move it? And when a run fails halfway, does it land back with a person in a usable state, or just vanish?
A polished demo won't settle any of that. I'd want to try a real task, including a failed run, before calling it ready for work. Curious who owns that acceptance test on the buyer side.
Box's own number is a 14-point lift across all their tests. Before trusting that on an agent that already does a real job, I'd look at one thing: it's an aggregate, so one task class can improve a lot while another slips — say +30 and -5 — and the total still looks like a win. So instead of swapping the model outright, I'd hold on to a set of failure cases from the current one and re-run them class by class, to check the upgrade isn't trading away something already fixed.
On findings like this, the test I'd apply is whether each claim points at something you can open. "This module is untested" is a vibe; a claim that names a place — like the ShellIndexes.ts · L20 line in your screenshot — is one a reviewer can go check. So instead of reading the score, I'd have every claim carry a file and a line. Anything that doesn't is homework for the reviewer, not a result.
If the sponsor slot is going to hold up, the part I'd watch isn't selling it — it's what comes after: which placement, what price, from when to when, and whether it actually ran. My guess is that's where these setups get fragile at renewal, with the record sitting in a chat log rather than somewhere the agent can check. And if a slot quietly goes unrun one week, would anything notice?
New on our Engineering blog: Creating in-house source control.
In May, we merged around 2,500 code changes per day. In September, we merged more than 30,000 per day. As a result, we became bottlenecked by developer infrastructure built for human (rather than agent) scale.
Here, we share how we built a new version control system—and fully migrated our monorepo from git—in five months: https://t.co/wzNkwHs7IN
@AnthropicAI Telling Claude 'no' is the easy part — keeping the no is harder. When a design gets rejected in a review thread, what stops the next agent from proposing it again days later? Where does that constraint have to live so a fresh run reads it before it starts?
@dabit3 Disposable is the right target, and it only works if the tool stays throwaway: no data locked in, no dependents, easy to replace. The costly cases are one-offs that quietly became load-bearing — when the first downstream dependency appears, decide: keep it or retire it.
@emollick Exporting prompts is the easy part. The hard part is everything around them: who owns the half-finished task, which actions still need approval, what counts as accepted, and why earlier calls went that way. Miss that and each switch retrains the team on how to work together.
@theo Funny, but the gap is real: "get this merged" is a binding instruction with no explicit PR target. Before acting on it, the executor should confirm which PR, its current review state, and who authorized it. In the wrong thread, don't guess the PR from "this".