13 drivers, 300 sites, 1,000+ ports—all evaluated during the busy holiday travel period. Ensuring reliable chargers when families need them most.
Check out the map of fast charger sites we assessed! https://t.co/ltoQrXRbwt
Maryland officials committed to a formal public hearing before setting $150 annual EV charger fees. It never happened. Here is how it all went wrong. https://t.co/tB4F4sxCWS
Maryland's new $150 annual fee for EV charging ports has advocates worried it will slow progress toward the state's goal of 1 million electric vehicles by 2030.
https://t.co/XTsPfcACbf
Maryland's $150 annual EV charger registration: "Many hosts will run the numbers, see red ink, and simply rip out the equipment" https://t.co/tsdbGhhSiN
EVSE Registration FAQ's via @MdAgDept 🧵
Q: What EVSE chargers are required to be registered?
A: An EVSE charger used in a transaction with a consumer to establish a charge is required to be registered with MDA Weights and Measures.
🚨 DAY 58: BGE’s @BWI_Airport
Ride Sharing lot EV charging site REMAINS A DISGRACE! 2/6 DCFC units (dual-port CCS/CHAdeMO) STILL OUT OF ORDER, per SWTCH app—DOWN 58 DAYS since reported 9/15/25!
🚨 DISTURBING NEWS: At BWI, confirmed—Unit E1188 reported to SWTCH & under repair since 7/3/25 (132 DAYS DOWN, awaiting parts)! Maryland’s HB 834 97% uptime requirement is UTTERLY DESTROYED!
👉🏻 Q3 (92 days) FAILED: E1188 uptime ~2% (down 90 days)!
👉🏻 Q4 (42 days so far) FAILING: E1188 uptime 0% (down 42 days)!
Ride-share drivers, promised an EV future, are BETRAYED! @myBGE@swtchenergy@GovWesMoore@MarylandPSC@OpcMd@lyft@Uber
🚫 END THIS NOW! No more "fixes"—stop wasting ratepayers' money! @BWI_Airport & @MarylandPSC
it's time to TERMINATE BGE's involvement in EV charging! BGE is DESTROYING the reputation of emerging EV infrastructure! Let professionals deliver! #EVChargingFail #BGE #MarylandEV #MarylandBetrayed @MDEnergy
Q: What are the responsible party marking requirements?
A: An unattended EVSE shall have clearly and conspicuously displayed thereon, or immediately adjacent thereto, adequate information detailing the name, address, and phone number of the local party responsible for the device
Is @HowardCountyMD enabling EV charging disasters? Despite BGE's abysmal track record—over HALF their Howard County plugs failing 97% uptime—council approved more at Elkridge Library! @MarylandPSC keeps failing Maryland drivers. Time for utilities to EXIT EV charging & stop wasting ratepayer $$?See BGE's "success":
https://t.co/Hmh9FVu90D
https://t.co/BOipo8Os9h
#MarylandEV #BGEBetrayal @myBGE@GovWesMoore@MarylandPSC
🚨ALERT: Maryland's @MdAgDept
has introduced a $150/year per port registration fee for commercial EV chargers. This is impacting Level-2 stations in multi-unit dwellings, leading to concerns from HOAs and potentially slowing new installations or even removals of existing ones to avoid compliance issues. This could affect Maryland's EV adoption and sustainability efforts.
🚫No public input? Total transparency fail. Now they're scrambling with a virtual stakeholder meeting Oct 30. Register NOW & speak up via chat: https://t.co/U1mfqKWrig:
Gas pumps at $20/year (potential $3,600/hr revenue) vs.
EV DCFC at $150 ($42/hr) or
Level-2 ($3/hr).
Does this seem balanced for EVs?Share if this matters to you!