@SenRubioPress @FaceTheNation Eric X. Li explains Capitalism to Little Marco:
"In China you have a vibrant market economy, but capital does not rise above political authority. Capital does not have enshrined rights."
https://t.co/BTnLtJFtIy
NYT, 2015: Azov Battalion is "openly neo-Nazi"
NYT, yesterday: Azov Battalion is "far-right"
All you have to do to lose your status as a "Nazi" is fight on the side of the US.
This was slipped into the Russian sanctions bill on pages 19,20,21. It gives the President broad authority to sanction virtually anyone, anywhere in the world, whether they are connected to Russia or not.
Interventionists at the State Department are doing the happy dance now.
Russian Foreign Minister Sergey Lavrov reflects on the UN General Assembly's vote on his country's operation in Ukraine, saying that those who voted against it were blackmailed and did so only under huge pressure.
@blairewhite People are tired of this bullshit. There's nothing wrong with individual trans people like yourself just getting on with their lives, but the reality denial has gotten too out of hand. Stunts like the one pulled by Thomas are creating so much hostility towards the trans movement.
Do not underestimate the amount of justified contempt this creates for the trans movement.
Iโm trans and this pisses me off- I can only imagine how the rest of the world feels.
For this year's helmet I wanted to show love to my beginnings. As much as I love purple and black, yellow is my history. Iโm going into this season with the same dedication, drive, and passion I had way back in my karting days ๐