$IREN $MSFT Deal Breakdown
Although the price action is not the 50% candle that $NBIS $MSFT saw on Sept 9, topline is in the same range and bottomline will be better for IREN because IREN doesn't need to pay colocation to DataOne.
Topline Comparison
1. NBIS MSFT = 17.4B/5yr/300MW = $11.6m/MW-yr
2. IREN MSFT = 9.7B/5yr/200MW = $9.7m/MW-yr
3. CIFR AWS = 5.5B/15yr/400MW = 2.75m/MW-yr
Once you break down the per yer and per MW, you will see that IaaS contracts are much better than Colocation.
I do love CIFR's deal as it raises the market price of colocation from 1.8m/MW-yr (WULF/CIFR previous deals) to 2.75m/MW-yr. This will increase cost for CRWV/NBIS and at the same time raises the value of the 2GWs at SW 1 & 2.
I suspect IREN got negotiated down by Microsoft due to establishing HS credibility. We saw both CIFR/WULF take a below market deals and catch up on subsequent deals. In exchange, IREN got the 2B prepayment which is quite valuable as NBIS did a combination of senior convertible notes and ATM offering for 4.2B total funding for it's 300MW deal with MSFT.
This difference between NBIS/IREN's top line (1.9m/MW-yr) is fully made up by colocation as NBIS is likely playing between 2-3m/MW-yr for behind the meter power colocation with DataOne.
Costs
The all in cost $14-16m/MW seem much higher than $7-8m/MW projected but as usually IREN is transparent about ALL costs. For an apple to apple comparison, the datacenter infrastructure itself is $9-11m which is still higher than the $7-8m/MW but not double.
The 3m for super cluster architecture cost means that IREN is developing this cluster for training. It may be reused for inference during downtime or later in the GPU lifetime but primary usage will be for training. As Infiniband and cabling is part of the 5.8B GPU capex, I don't know at this time what exactly this is for. Industry standard estimates for 11-15m/MW is likely for inference DCs so industry estimates for training DCs should be $14-18m/MW.
The 2m charge for acceleration means that there are bottlenecks in the supply chain and you have to bid to get components in time. I am tangentially aware of this dynamic during the covid supply chain crunch when many electronic component suppliers had customers bid to get priority. This highlights the multiple bottlenecks in GPU DCs, not just power and makes existing DC build outs more valuable. I had called out that DC inflation was gooing to be much higher than CPI and this is basically DC "temporary" inflation charges. This dynamic is likely industry wide and industry estimates for training DCs available in 2026 should be $16-20m/MW.
I was definitely not ready for higher capex but IREN is fully transparent on where the extra cost are coming from and they are industry wide not IREN specific. DC inflation is real.
Bottom Line
We estiamte net profit from (Topline ARR - GPU+Networking/5yrs - DC/15yrs). All-in DC is 200MW*15m/MW = $3B.
Yearly profit = 9.7B/5 - 5.8B/5 - 3B/15 = 580m Net Profit.
Comparison to $NBIS = 17.4/5 - 5.8B GPU+Networking * (300MW/200MW)/5 - 2.5m/MW-yr Colocation * 300MW = -748m Net Profit. Unless NBIS is getting significantly better price for GPU+Networking and below market rate on DataOne colocation, NBIS is losing money on their deal with MSFT. Maybe a combination of both will help NBIS into profitability but IREN clearly has higher bottom line than NBIS.
$CRWV is probably getting by on profit from ripping off CORZ for colocation but is making less than IREN.
Donald J. Trump Truth Social Post 04:50 PM EST 10/10/25
It has just been learned that China has taken an extraordinarily aggressive position on Trade in sending an extremely hostile letter to the World, stating that they were going to, effective November 1st, 2025, impose large scale Export Controls on virtually every product they make, and some not even made by them. This affects ALL Countries, without exception, and was obviously a plan devised by them years ago. It is absolutely unheard of in International Trade, and a moral disgrace in dealing with other Nations.
Based on the fact that China has taken this unprecedented position, and speaking only for the U.S.A., and not other Nations who were similarly threatened, starting November 1st, 2025 (or sooner, depending on any further actions or changes taken by China), the United States of America will impose a Tariff of 100% on China, over and above any Tariff that they are currently paying. Also on November 1st, we will impose Export Controls on any and all critical software.
It is impossible to believe that China would have taken such an action, but they have, and the rest is History. Thank you for your attention to this matter!
DONALD J. TRUMP
PRESIDENT OF THE UNITED STATES OF AMERICA
Totally agree on the possibility with @TheKamaHsutra. From price action of $IREN, $CRWV, $NBIS, we can see that all the neoclouds had the same inflection points but IREN had the greatest positive magnitude. The market saw that 6GW of Instinct GPUs will need to be placed in powered DCs - all the Neoclouds rose but IREN rose the most while CRWV, NBIS had stronger pullbacks because the market realized only IREN currently secured the power. More confluences:
1. The first 1GW Instinct GPUs will come online H2 2026 which perfectly aligns with SW energization.
2. Other Neoclouds will not take the risk to buy 6GW of $AMD GPU. OpenAI has the software capabilities to modify ROCm for themselves or write they own GPU interface layer to squeeze the performance out.
3. Topline will be lower than GB300s but IREN doesn't care since they can just charge ~6-7m/MW-yr for operating the Inference IaaS for OpenAI and have the similar profit as running their own IaaS. This greatly de-risk IREN from financing/leasing GPUs and at the same time OpenAI will save money from renting from other Neoclouds, not that other Neoclouds outside of ORCL have anywhere near 6GW anyways.
4. The other likely candidate for the DC operations of these GPUs is $ORCL but it's likely ORCL will run the large scale training cluster which is more difficult which leaves IREN to leave the inference cluster.
$IREN CNBC interview with Dan Roberts.
To summarise:
> IREN is rapidly converting its massive data center footprint into AI factories, directly challenging hyperscalers. The demand is outstripping supply by a gargantuan margin, with one forecast citing a 44 GW shortfall in the coming years. IREN is scaling up now, installing 23,000 contracted GPUs to deliver $500M in annualized revenue from less than 2% of its total power capacity. The shift from Bitcoin mining to AI is an incredible multiple expansion opportunity.
> Unbeatable Power Advantage: Power is the new bottleneck, and IREN has 3 gigawatts of secured, 100% renewable power (wind, solar, hydro) without taking on generation risk. They simply connect into high-voltage networks that guarantee 24/7 reliable clean energy. This cost-efficient, green infrastructure is a strategic moat that competitors are struggling to build.
> Vertical & Scalable: By being vertically integrated (owning the land, power, and facilities) they control their destiny. They're moving up the value chain to capture more economics by providing AI cloud compute directly to end-customers and hyperscalers (like AWS). They can swap out racks and redeploy capacity fast, giving them unparalleled execution speed in a high-demand environment.
I repeat my post from yesterday. IREN is the most undervalued company on Wallstreet.
“We’re focused on AI Cloud - moving up the value chain, capturing more of the economics by providing that compute, and building relationships directly with end customers”
Catch the replay of $IREN Co-Founder & Co-CEO @danroberts0101 on @CNBCOvertime discussing the latest trends shaping AI infrastructure with @MorganLBrennan and @jonfortt
AI Boosts HBM Demand, SK Hynix's Q2 Profits Reach Six-Year High.
SK Hynix announced second-quarter revenue of 16.42 trillion Korean won, a 125% year-on-year increase, setting a historical record. At the same time, profits reached their highest level since 2018. This was mainly due to strong demand for AI memory, including HBM, and overall price increases for DRAM and NAND products. AI storage products such as HBM and eSSD are thriving, with NAND turning a profit for two consecutive quarters.
As a key HBM supplier for Nvidia, SK Hynix's HBM revenue surged by over 250%. The company stated in May that HBM capacity is almost sold out until 2025. With HBM's growing importance in AI investment, SK Hynix plans to start mass production of 12-layer HBM3E products in the third quarter, solidifying its leadership in the HBM market.
Benefiting from bit demand growth, improved supply-demand structure driving up prices, and the rise of high-value-added products like HBM, TrendForce estimates that in 2024, HBM will contribute 5% of DRAM bit shipments and 20% of revenue.
📊 More semiconductor news: https://t.co/3yqmV7DgkU
📊 More industry charts: https://t.co/sMgIvZmYTu
【Weak Demand in Retail DRAM Market, Mainstream Chip Prices Remain Steady】
Spot prices have not dropped further this week, but there is no upward momentum because the demand from the retail market is tepid. Reball DDR4 1Gx8 chips previously stripped from modules are trading within US$0.97-0.98. However, deals are being made sporadically for this product category.
As for DDR5 products, demand is more stable, and there has been a significant amount of transactions. Nevertheless, spot prices of DDR5 products are not rising as well.
Kingston has lowered module prices in order to spur purchases, but demand is lacking. Due to this situation, spot prices of mainstream chips have not risen noticeably.
The average spot price of the mainstream chips (i.e., DDR4 1Gx8 2666MT/s) has not changed from last week and is holding steady at US$1.995.
📖 Related news: https://t.co/is2lgDocDy
📊 For more on DRAM Price: https://t.co/XSeiHtKlrD