Top Tweets for #ISEEC17
All registered for #ISEEC19. Much to my chagrin I didn't get to go to #ISEEC17 due to beginning my doctorate @OxfordMedSci. Not this time @EvoCancer.
Listen to this interview on transmissible cancers, recorded at #ISEEC17 with world leading researchers https://t.co/MaArz5tB5h via @RadioNational
Read the summary of a great conference on cancer and evolution I recently attended https://t.co/jdaGPc3U8x #ISEEC17
Missed the #cancer & #evolution conference #ISEEC17? Check Richard Harth's, @ASUBiodesign writer, conference summary below: https://t.co/n1lWbKM1Dc
If you missed our recent Cancer & Evolution Conference, read about it here! https://t.co/q6tu36M3X9 #iseec17 @ASUBiodesign @EvoCancer
Missed #ISEEC17? You can see a little part of it here, courtesy of @ara_anderson
https://t.co/l3IwyFcCFg
@TaraVwvet @CancerInExotics at the #iseec17 flash talks, see if you can find us! https://t.co/lT7SSZp4BR
Poster flash talks at #ISEEC17

The S-curve of science Anna Barker on how we need convergence of information theory and biology to deal with cancer #ISEEC17
#cancertreatment

#ISEEC17 https://t.co/t110p8gNc2
@domhenri56 Some of them are here: https://t.co/avpfnRvdi1 The edited versions of the live streamed talks will be made available on our website in early January.
Had a great time and learned a lot at #ISEEC17. Many thanks to the organizers and all who presented. Now, to sign out of Twitter until I see Star Wars so I can avoid spoilers.
@AthenaAktipis Thanks to you and @cmaley for putting together #ISEEC17, what a great conference! Wish I could have spent more time, but glad I made some of it!

Bruce Tabashnik on insect resistance to transgenic crops: lessons from the first billion acres #ISEEC17

Tabashnik: Worried about idea of releasing sterile pink bollworms in AZ (resistant insects mate with steriles and fail). When he was asked to model it (done by Sisterson), their model predicted it would be effective, so they went ahead and appear to have eradicated it #ISEEC17
Pink bollworm on cotton: in India resistance evolved in 6 years; in US it is still susceptible after 22 years; in China it became resistant and then reverted. In India non-Bt refuges are rare, cf USA which had refuges and now has sterile releases. #ISEEC17
Here's the review in @NatureBiotech by Tabashnik on the surge in insect resistance to transgenic crops https://t.co/i3mLW0VXI7 #ISEEC17

Last Seen Hashtags on Sotwe
ReneDrucker
Seen from United States
snapchat
Seen from Poland
ABDL
Seen from Japan
monkeyappwins(())
Seen from Sweden
نقابنا_عزنا
Seen from United States
ساره_اخت_تــوتي
Seen from Algeria
عملية_رفع_الحصار
Seen from Saudi Arabia
candid
Seen from France
Teenageee() video
Seen from United States
monkeyappleak
Seen from South Africa
Trends for you
Most Popular Users

Elon Musk 
@elonmusk
241.7M followers

Barack Obama 
@barackobama
118.9M followers

Cristiano Ronaldo 
@cristiano
114.6M followers

Donald J. Trump 
@realdonaldtrump
111.9M followers

Narendra Modi 
@narendramodi
107.2M followers

Rihanna 
@rihanna
98.7M followers

NASA 
@nasa
92.4M followers

Justin Bieber 
@justinbieber
91.8M followers

KATY PERRY 
@katyperry
90.1M followers

Taylor Swift 
@taylorswift13
84M followers

Lady Gaga 
@ladygaga
75.5M followers

Virat Kohli 
@imvkohli
73.5M followers

Kim Kardashian 
@kimkardashian
70.9M followers

YouTube 
@youtube
68.8M followers

Neymar Jr 
@neymarjr
66.5M followers

Bill Gates 
@billgates
65.2M followers

Selena Gomez 
@selenagomez
63.1M followers

The Ellen Show
@theellenshow
62.2M followers

CNN 
@cnn
61.8M followers

X 
@x
60.7M followers
















