Top Tweets for #USBRL_Project
Good News ! 🇮🇳
Countdown begins for the inauguration of the Katra-Reasi section under the #USBRL_Project !
💡 24x7 CCTV surveillance on the rail line, #Chenab_Bridge with multi-layered security arrangements in place.
#IndianRailways #Katra #Reasi #Jammu #Kashmir #USBRL #Jk

For more on this please read this:
#KashmirLine
#ChenabBridge
#USBRL_Project
#Rail_Safety
#CRS
#Railway_Lines_in_Himalayas
#Himalayan_Geology
#Kashmir_rail_link #Chenab_Rail_Bridge
#Ruling_Gradient
#Alignment_surveys #Alignment_Methodology
https://t.co/rW5m58Y9XI
Thread
Shocking negligence in railway safety!
The Commissioner of Railway Safety (CRS)/Northern Circle has again failed public trust:
i) Cleared two Kashmir rail sections without mandatory load-deflection tests on critical bridges.
ii) Now, before even starting the inspection of the Anji cable-stayed bridge (where the load-deflection test hasn't yet been carried out) he claims it’s built with the "highest quality" standards.
This shows either incompetence or disregard for safety protocols. The Rules explicitly mandate load-deflection tests for all new bridges—except for replicas of existing ones tested earlier. Yet, this critical safety measure is ignored.
Even after two letters to the Railway Minister and Chief Commissioner of Railway Safety, there’s no accountability.
Public safety on Indian Railways is being compromised. These are indeed dark days.
...1/2
#RailwaySafety #PublicSafety
https://t.co/pKDm28Bn0O

...
#KashmirLine
#ChenabBridge
#USBRL_Project
#RailSafety
#CRS
#Railway_Lines_in_Himalayas
#HimalayanGeology
https://t.co/fDKS259j89
CRS's Gamble with Public Safety on the Kashmir Line.
Superficial load testing
Tunnel& slope safety ignored
No actionable disaster management
Passenger safety is at serious risk. Read below the letter from Fmr CE of project demanding accountability and urgent action.
#KatraBanihal

..4)4
#USBRL_Project
#RailSafety
#CRS
#Railway_Lines_in_Himalayas
#HimalayanGeology
#Kashmir_rail_link #Chenab_Rail_Bridge
#AlignmentSurveys #AlignmentMethodology
#RishikeshKarnaprayagRailway
#ManipurRailLink
#MizoramRailLink
#SikkimRailLink
#MeghalayaRailLink
#NagalandRailLink
#Lumding_Badarpur-Line
#NF_Railway
#Landalides
#Slope_Failures
#Rail_Safety
#Konkan_Railway
https://t.co/bJ66EGMAxM
THREAD
Network of Meter Gauge lines in Himalayas
I have been examining feasibility of constructing a network of MG lines from Baramulla, Leh & Char Dham in the west to Nathula, Kohima & Aizawl in the east.
These lines would cost about half to one-third the cost of BG lines..
The Kashmir Line: Engineering Marvel or National Shame
Press conference today at 16:00 hrs on the safety concerns. Read the post below for the article and other details.
...
#KashmirLine
#USBRL_Project
#ChenabRailBridge
#RailSafety
#CRS
#Railway_Lines_in_Himalayas
#HimalayanGeology
https://t.co/qSuxD1f3WB
@AshwiniVaishnaw
@RailMinIndia
Subject: The Kashmir Line: Railway Board's Dangerous Gamble with Public Safety
Respected Minister of Railways
Sir,
What desperation drives the Railway Board to gamble with public safety on the Kashmir Line?
Did the Commissioner of Railway Safety/Northern Circle collude with Railway Engineers to certify the much-hyped mega-arch bridge over Chenab without the mandatory load-deflection tests?
The Railway Board and the CRS actions are a serious violation of the rules prescribed by the Government of India that regulate the inspection of a new line by the CRS before their opening for the public carriage of passengers.
I have written two letters to the Minister of Railways on 14 August and 13 September 2024. I understand that recently, a legal notice was also sent to you, as this safety certification is also in violation of the assurance that the full Railway Board gave in 2015 to Delhi High Court on a sworn affidavit in a PIL case that the line shall be opened after a thorough and independent inspection of the line by the CRS.
I have received no reply, but I trust and hope that you have taken necessary actions to safeguard public safety and ensure that all necessary load-deflection tests are conducted now fairly, impartially, and responsibly. ..1/3
#Railway_Safety
#Railway_Lines_in_Himalayas
#HimalayanGeology
#Kashmir_rail_link #Chenab_Rail_Bridge
#AlignmentMethodology

@AshwiniVaishnaw
@RailMinIndia
Subject: The Kashmir Line: Railway Board's Dangerous Gamble with Public Safety
Respected Minister of Railways
Sir,
What desperation drives the Railway Board to gamble with public safety on the Kashmir Line?
Did the Commissioner of Railway Safety/Northern Circle collude with Railway Engineers to certify the much-hyped mega-arch bridge over Chenab without the mandatory load-deflection tests?
The Railway Board and the CRS actions are a serious violation of the rules prescribed by the Government of India that regulate the inspection of a new line by the CRS before their opening for the public carriage of passengers.
I have written two letters to the Minister of Railways on 14 August and 13 September 2024. I understand that recently, a legal notice was also sent to you, as this safety certification is also in violation of the assurance that the full Railway Board gave in 2015 to Delhi High Court on a sworn affidavit in a PIL case that the line shall be opened after a thorough and independent inspection of the line by the CRS.
I have received no reply, but I trust and hope that you have taken necessary actions to safeguard public safety and ensure that all necessary load-deflection tests are conducted now fairly, impartially, and responsibly. ..1/3
#Railway_Safety
#Railway_Lines_in_Himalayas
#HimalayanGeology
#Kashmir_rail_link #Chenab_Rail_Bridge
#AlignmentMethodology

...
#KashmirLine
#ChenabBridge
#USBRL_Project
#RailSafety
#CRS
#Railway_Lines_in_Himalayas
https://t.co/znKyOdIBlq
Thread
Shocking negligence in railway safety!
The Commissioner of Railway Safety (CRS)/Northern Circle has again failed public trust:
i) Cleared two Kashmir rail sections without mandatory load-deflection tests on critical bridges.
ii) Now, before even starting the inspection of the Anji cable-stayed bridge (where the load-deflection test hasn't yet been carried out) he claims it’s built with the "highest quality" standards.
This shows either incompetence or disregard for safety protocols. The Rules explicitly mandate load-deflection tests for all new bridges—except for replicas of existing ones tested earlier. Yet, this critical safety measure is ignored.
Even after two letters to the Railway Minister and Chief Commissioner of Railway Safety, there’s no accountability.
Public safety on Indian Railways is being compromised. These are indeed dark days.
...1/2
#RailwaySafety #PublicSafety
https://t.co/pKDm28Bn0O

..For more on this subject, read my post in the link below:
#KashmirLine
#ChenabBridge
#USBRL_Project
#RailSafety
#FireSafety
#CRS
https://t.co/OncwldfyR5
Extremely high fire safety risk profile of the Kashmir line
I was the convener of the task force that was set up by Northern Railway in 2005 to assess the fire safety hazard potential along with other safety and operational requirements of the line. We prepared a detailed report titled: "Review of The Operational Maintenance and Safety Requirements of the New Line Under the Udhampur Srinagar Baramulla rail Link Project"
Fires in tunnels can be devastating, such as the fire in the Kaprun tunnel in Austria (161 passengers died and only 11 survived), and the English Channel tunnel fire in the UK which led to closure of this tunnel on the vital rail link between the UK and France for about four months..
We assessed the hazard potential of the Kashmir line to be among the highest in any railway line in the world for three main reasons:
i) 87% of the length of the line ( 97 km out of 111 km) is in tunnels. Most of the tunnels are more than 1 km long, several are > 5 km long, and the longest measures 12.75 km.
ii) It is a single track line which would make relief and rescue challenging.
iii) The line is in a remote mountainous region with poor road accessibility that adds to the challenge.
We made recommendations for fire prevention, fire fighting and relief and rescue measures. These included diverse measures such as enhanced fire safety features in trains, fire resistant concrete lining in tunnels, special fire extinguishers, water sprinklers in long tunnels, training of staff, forced ventilation in both the main tunnel and the parallel safety tunnels etc.
I hope that the fire safety features of the line (and the trains that will be running on it) are being carefully examined in the ongoing safety inspection.
https://t.co/tqFGNYzpYj

...For detailed information on this safety rule violation, please read my post in the link below where you can also download my letters to the Minister of Railways:...2/2
#Rail_Safety
#CRS_Inspection
#KashmirRailLinkProject
#USBRL_Project
#Chenab_Bridge
https://t.co/vsNffmcfEr
@AshwiniVaishnaw
@RailMinIndia
Subject: The Kashmir Line: Railway Board's Dangerous Gamble with Public Safety
Respected Minister of Railways
Sir,
What desperation drives the Railway Board to gamble with public safety on the Kashmir Line?
Did the Commissioner of Railway Safety/Northern Circle collude with Railway Engineers to certify the much-hyped mega-arch bridge over Chenab without the mandatory load-deflection tests?
The Railway Board and the CRS actions are a serious violation of the rules prescribed by the Government of India that regulate the inspection of a new line by the CRS before their opening for the public carriage of passengers.
I have written two letters to the Minister of Railways on 14 August and 13 September 2024. I understand that recently, a legal notice was also sent to you, as this safety certification is also in violation of the assurance that the full Railway Board gave in 2015 to Delhi High Court on a sworn affidavit in a PIL case that the line shall be opened after a thorough and independent inspection of the line by the CRS.
I have received no reply, but I trust and hope that you have taken necessary actions to safeguard public safety and ensure that all necessary load-deflection tests are conducted now fairly, impartially, and responsibly. ..1/3
#Railway_Safety
#Railway_Lines_in_Himalayas
#HimalayanGeology
#Kashmir_rail_link #Chenab_Rail_Bridge
#AlignmentMethodology

.. You can read the full IRJ article in the scans below:
#Railway_Lines_in_Himalayas
#HimalayanGeology
#Kashmir_rail_link #Chenab_Rail_Bridge
#Ruling_Gradient
#AlignmentSurveys
#USBRL_Project
#Passenger_Safety
#Rail_Safety

यूएसबीआरएल परियोजना में रेलवे के लिए एक और बड़ी उपलब्धि https://t.co/cxVmOYJqVp
. #USBRL_Project
An Iconic Wonder: #Chenab_Bridge of #USBRL_Project will bring all-weather connectivity to the Kashmir Valley.
#ChenabBridge #USBRL
BILASPUR - MANALI - LEH RAILWAY: NORTHERN RAILWAY'S CONSULTATION WITH ME AND MY SUGGESTIONS
.. 1/3

Last Seen Hashtags on Sotwe
nolimits nolimits
korean #cock
Seen from Singapore
孕夫
Seen from Netherlands
omegle
Seen from Germany
너의전공은
ไซด์ไลน์สกลนคร
Seen from Thailand
nolimits #nolimits #nolimits #nolimits #nolimits momsonn
Seen from Argentina
megafiles
Seen from United States
プリケツ猫ブローチ
Seen from United Arab Emirates
paki
Seen from Pakistan
Most Popular Users

Elon Musk 
@elonmusk
241.5M followers

Barack Obama 
@barackobama
119M followers

Cristiano Ronaldo 
@cristiano
113.8M followers

Donald J. Trump 
@realdonaldtrump
111.8M followers

Narendra Modi 
@narendramodi
107.2M followers

Rihanna 
@rihanna
98.6M followers

NASA 
@nasa
92.4M followers

Justin Bieber 
@justinbieber
91.7M followers

KATY PERRY 
@katyperry
89.6M followers

Taylor Swift 
@taylorswift13
83.6M followers

Lady Gaga 
@ladygaga
75M followers

Virat Kohli 
@imvkohli
72.8M followers

Kim Kardashian 
@kimkardashian
70.7M followers

YouTube 
@youtube
68.8M followers

Neymar Jr 
@neymarjr
65.8M followers

Bill Gates 
@billgates
64.9M followers

Selena Gomez 
@selenagomez
62.7M followers

The Ellen Show
@theellenshow
62.3M followers

CNN 
@cnn
61.8M followers

X 
@x
60.7M followers