Another season of the Winona Bike Bus starts Friday. Huge thanks to Grade 7 students Lila J. and Audra P. for the great poster
A two-wheel primer on mobility. Graduates gain the experience to travel independently
From the start or somewhere along the route, joiners always welcome
🚧 A peek underground! We've installed state-of-the-art monitoring instruments as we gear up for construction of the Bloor-TTC tunnel connection. These tools will provide real-time feedback and analytics should any unexpected changes take place in the tunnel during construction.
🚧 From the heart of Kitchener track work project near Bloor GO Station, the pouring of concrete to form the pedestrian pavilion. More about this exciting project here: https://t.co/BGKyWPcK1P
Online community consultation for re-development of 1650-1664 Dupont and 3 Osler (former Portuguese Sporting Club, Dupont Auto, and a house).
Tue May 14 6-8pm via Webex. Info/registration:
https://t.co/wLLdcQPof0
📌 Service alert: on April 13 and 14, we’re reducing service to accommodate important track work. During this time, trains will run every 30 minutes between 6 a.m. and 1 a.m.
2021: We opened our first ghost kitchen pop up in the Junction Triangle of Toronto to achieve product market fit. We did!
2022: Opened three retail locations in Toronto.
2024: Our first location in New York will open.
A genuine thank you if you have ever ordered from us.
The #KitchenerLine expansion project is surging ahead with the installation of noise and wind protection acrylite walls along the West Toronto Rail Path near #BloorGO Station. 🌬️🔇 Stay informed on this exciting expansion project: https://t.co/VkXcs1d76m
When Perth/Dupont @torontolibrary moves to new location at Dupont and Campbell, the name will be changed. Current proposal is to call it the "Junction Triangle" branch. There's a survey about the renaming here: https://t.co/1ahtiHaH6c
#jtriangle#toronto
📢 The Stop is #hiring two new team members to join our Mashkikii’aki’ing (Medicine Wheel) Community Garden program:
➡️ Indigenous Worker
➡️ Harvest Worker
Learn about the positions, eligibility, and how to apply: https://t.co/vnhyS02Q3d
#Indigenous#Employment
The Davenport Diamond Guideway project achieves substantial completion and is part of the GO Expansion program, improving service along the Barrie corridor. Crews will continue to wrap up minor construction on the project.
#MetrolinxFYI@GOtransitBR
Exciting progress on the #KitchenerLine expansion project! 🚧🚆 Updates from near Bloor GO station include ClearVu fence installation, tunnel waterproofing, and retaining wall forming. Stay informed with more details here: https://t.co/ycIA1kPxAV