What is Kava Chain?
Kava is a lighting fast blockchain built with the Cosmos SDK that includes Kava EVM, an EVM-compatible smart contract execution platform. Kava's best-in-class Tendermint-based BFT consensus engine allows Kava to be quick, cheap, and secure.
Attention Kava Community:
The Kava 17 chain upgrade will start in approximately one hour at block 12,766,500. The expected downtime is between 25 minutes and one hour.
During the upgrade, the web app will be offline and restored once the engineering team confirms that everything is running smoothly. Thank you for your patience and support!
Need $KAVA for gas and service fees on https://t.co/NZsvxJ5BOU? 💎
We’ve got you covered with step-by-step options:
✅ Withdraw from Binance, KuCoin, or https://t.co/VTlGMknq8I using the Kava EVM network
✅ Use Stargate or Squid Router for cross-chain transfers
✅ Transfer from a Cosmos wallet to Kava EVM
Get the full guide here 👇 https://t.co/Fs9ADdlmX5
Scaling AI is tough, but blockchain might hold the key. 🔑
Discover how DePIN and decentralized computation are reshaping the future of scalable AI.
👉 https://t.co/rPE4n5aThW
Prop #192 to add $HARD token to the Kava EVM Co-Chain has PASSED!
The $HARD token can now be transferred and held as an ERC-20, usable on both Kava and other EVMs like $ETH, $BNB, and more.
Prop #82 https://t.co/SXUEdKsZhb Signaling Proposal has PASSED!
https://t.co/SXUEdKsZhb will be launching shortly on Kava EVM following the community’s approval.
Kava is at Consensus 2023!
Drop by Booth 356 and chat with our Engineering and BD teams.
Ask us about the $750M Kava Rise incentive fund and how to participate.
#Consensus2023
As part of the upgrade process, we want to hear your thoughts!
Let us know what you think about the move to a weighted rewards system and any other suggestions on how to evolve Kava Rise to serve the community of BUIDLers.
https://t.co/R18oYGlTpE
Bribe Alert! 🎉
#KAVA is teaming up with @EquilibreAMM to help boost liquidity in the KAVA/ETH and axlUSDC/USDC pools!
A $7,500 ETH bribe has been put up on Equilibre's KAVA/ETH pool and a $2,500 axlUSDC bribe on the axlUSDC/USDC pool!